Evaluating Costs as PartEvaluating Costs as Partof the Decision Making Processof the Decision Making Process
Presented byPresented by
Tom FerreroTom Ferrero
2009 Pumper and Cleaner
Environmental Expo International
February 25, 2009February 25, 2009
![Page 2: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/2.jpg)
•• Publicly Owned Treatment Works Publicly Owned Treatment Works (POTWs)(POTWs)
•• Land ApplicationLand Application•• Dedicated Septage FacilitiesDedicated Septage Facilities•• Economic ElementsEconomic Elements•• Business Plan Business Plan –– Decision by $Decision by $
OOVERVIEWVERVIEW
![Page 3: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/3.jpg)
PPUBLICLY UBLICLY OOWNED WNED TTREATMENT REATMENT WWORKS ORKS (POTWs)(POTWs)
•• Head of PlantHead of Plant
![Page 4: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/4.jpg)
PPUBLICLY UBLICLY OOWNED WNED TTREATMENT REATMENT WWORKS ORKS (POTWs)(POTWs)
•• Septage Receiving AreaSeptage Receiving Area
![Page 5: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/5.jpg)
PPUBLICLY UBLICLY OOWNED WNED TTREATMENT REATMENT WWORKS ORKS (POTWs)(POTWs)
•• Economic ElementsEconomic Elements–– Disposal FeeDisposal Fee
•• Per GallonPer Gallon•• Per LoadPer Load•• Honor SystemHonor System
–– Truck TimeTruck Time•• DistanceDistance•• TimeTime
–– 24/7 Facility24/7 Facility•• Need Holding TankNeed Holding Tank
![Page 6: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/6.jpg)
PPUBLICLY UBLICLY OOWNED WNED TTREATMENT REATMENT WWORKS ORKS (POTWs)(POTWs)
•• Economic ElementsEconomic Elements–– Disposal FeeDisposal Fee
•• Per Load 5 cents/gal Per Load 5 cents/gal --3000 gal3000 gal $150.00$150.00
–– Truck TimeTruck Time•• TimeTime Additional 1 hour @80.00/hr Additional 1 hour @80.00/hr $ 80.00$ 80.00
–– 24/7 Facility 24/7 Facility –– YesYes–– Total Cost for 3,000 GallonsTotal Cost for 3,000 Gallons $230.00$230.00
•• Per 1,000 gallons $230/3= Per 1,000 gallons $230/3= $ 76.67$ 76.67•• Per GallonPer Gallon $230/3,000 = $ 0.07667$230/3,000 = $ 0.07667
![Page 7: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/7.jpg)
LLAND AND AAPPLICATIONPPLICATION
![Page 8: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/8.jpg)
•• 40 CFR Part 503 (USEPA)40 CFR Part 503 (USEPA)•• ScreeningScreening•• Class B BiosolidClass B Biosolid
–– Pollutant LimitsPollutant Limits–– Pathogen and Vector Attraction ReductionPathogen and Vector Attraction Reduction
•• pH 12 for 30 minutes or,pH 12 for 30 minutes or,•• Inject or,Inject or,•• Incorporate within 6 hoursIncorporate within 6 hours
•• RecordkeepingRecordkeeping
LLAND AND AAPPLICATIONPPLICATION
![Page 9: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/9.jpg)
LLAND AND AAPPLICATIONPPLICATION
![Page 10: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/10.jpg)
LLAND AND AAPPLICATIONPPLICATION
![Page 11: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/11.jpg)
LLAND AND AAPPLICATIONPPLICATION
![Page 12: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/12.jpg)
LLAND AND AAPPLICATIONPPLICATION
![Page 13: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/13.jpg)
LLAND AND AAPPLICATIONPPLICATION
![Page 14: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/14.jpg)
•• Economic ElementsEconomic Elements–– Land CostLand Cost–– EquipmentEquipment
•• ScreeningScreening•• TankageTankage w/mixingw/mixing•• Lime StorageLime Storage•• Spreading EquipmentSpreading Equipment
–– LimeLime–– TruckingTrucking–– Volume to be disposedVolume to be disposed–– RecordkeepingRecordkeeping
LLAND AND AAPPLICATIONPPLICATION
![Page 15: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/15.jpg)
•• Economic ElementsEconomic Elements–– Volume to be Disposed 5,200,000 gal/yrVolume to be Disposed 5,200,000 gal/yr–– Land Cost Land Cost NoneNone–– EquipmentEquipment $50,000 10 yr$50,000 10 yr
•• ScreeningScreening•• TankageTankage w/mixingw/mixing•• Lime StorageLime Storage•• Spreading EquipmentSpreading Equipment
–– LimeLime 25# per 1,000 gal @$150.00/ton25# per 1,000 gal @$150.00/ton–– Trucking 1 hr turnaround @ $ 80.00Trucking 1 hr turnaround @ $ 80.00–– RecordkeepingRecordkeeping
LLAND AND AAPPLICATIONPPLICATION
![Page 16: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/16.jpg)
LLAND AND AAPPLICATIONPPLICATION
2.284 Cents2.284 CentsCOST PER GALCOST PER GAL$ 22.84$ 22.84COST PER 1,000COST PER 1,000
$ 118,750$ 118,750TOTAL COSTTOTAL COST
$ 104,000$ 104,000
1 hr per 4,000 1 hr per 4,000 galgal
5,200,000/4,0005,200,000/4,000=1300 trips=1300 trips
$80.00/hr$80.00/hrTRUCKINGTRUCKING
$ 9,750$ 9,75025 # per 1,00025 # per 1,0005200 x 25 lbs = 5200 x 25 lbs =
130,000 lbs130,000 lbs$150 per Ton$150 per TonLIMELIME
$ 5,000$ 5,00010 Years10 Years$50,000$50,000EQUIPMENTEQUIPMENTCost Per YearCost Per YearPERPERCOSTCOSTPARAMETERPARAMETER
Disposal Costs Based on 20,000 Gallons Per DayDisposal Costs Based on 20,000 Gallons Per Day
![Page 17: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/17.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
•• Economic ElementsEconomic Elements–– Planning/EngineeringPlanning/Engineering–– PermittingPermitting–– FundingFunding–– Capital Reimbursement FeeCapital Reimbursement Fee–– Equipment SelectionEquipment Selection–– Operational CostsOperational Costs
![Page 18: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/18.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIESTHINK! THINK! …… What are your Resources?What are your Resources?
POTWPOTW
Land ApplyLand ApplyPOTWPOTWLandfillLandfill
CompostingCompostingHeatHeat
DryingDryingetcetc
Land ApplyLand ApplyDewateringDewatering
Land ApplyLand ApplyPOTWPOTWLand ApplyLand ApplyThickeningThickening
Land ApplyLand ApplyLime Lime StabilizationStabilization
LiquidLiquidSolidsSolids
![Page 19: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/19.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
•• Unit ProcessesUnit Processes–– Screening/Grit RemovalScreening/Grit Removal–– Equalization Equalization TankageTankage–– DewateringDewatering
•• Polymer AdditionPolymer Addition
–– SludgeSludge•• Further TreatmentFurther Treatment
–– FiltrateFiltrate•• Further TreatmentFurther Treatment
–– Odor ControlOdor Control
![Page 20: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/20.jpg)
PPRIVATELY RIVATELY OOWNEDWNED DDEDICATED EDICATED
FFACILITYACILITY
![Page 21: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/21.jpg)
PPRIVATELY RIVATELY OOWNEDWNED DDEDICATED EDICATED
FFACILITYACILITY
![Page 22: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/22.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
•• ThickeningThickening–– Add Lime and/orAdd Lime and/or–– Add PolymerAdd Polymer
![Page 23: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/23.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
•• ThickeningThickening–– Add Lime and/orAdd Lime and/or–– Add PolymerAdd Polymer–– Gravity BeltGravity Belt
![Page 24: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/24.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
•• ThickeningThickening–– Add Lime and/orAdd Lime and/or–– Add PolymerAdd Polymer–– Gravity BeltGravity Belt–– Drum ThickenerDrum Thickener
![Page 25: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/25.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
•• ThickeningThickening•• Dewatering EquipmentDewatering Equipment
–– Belt PressBelt Press–– Screw PressScrew Press–– Rotary PressRotary Press–– Rotary Drum Vacuum FilterRotary Drum Vacuum Filter–– Recessed Cavity Plate & FrameRecessed Cavity Plate & Frame–– Container FilterContainer Filter–– CentrifugeCentrifuge
![Page 26: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/26.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
Belt Press
![Page 27: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/27.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
Screw Press
![Page 28: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/28.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
Rotary Press
![Page 29: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/29.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
Rotary Drum Vacuum Filter
![Page 30: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/30.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
Recessed Cavity Plate & Frame
![Page 31: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/31.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
Container Filter
![Page 32: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/32.jpg)
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
Container Filter
![Page 33: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/33.jpg)
•• Economics of ConstructionEconomics of Construction–– Land & BuildingLand & Building $ 400,000$ 400,000–– Screen/Grit RemovalScreen/Grit Removal 50,00050,000–– Dewatering EquipmentDewatering Equipment 100,000100,000–– TankageTankage 50,00050,000–– Odor ControlOdor Control 25,00025,000–– Engineering & PermitsEngineering & Permits 30,00030,000–– Plumbing & ElectricalPlumbing & Electrical 40,00040,000
$ 695,000$ 695,000Disclaimer: Costs May Vary Considerably Disclaimer: Costs May Vary Considerably
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
![Page 34: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/34.jpg)
•• Capital Reimbursement FeeCapital Reimbursement Fee–– Defined in Sewer Use OrdinanceDefined in Sewer Use Ordinance–– Usually ____ Dollars per _____ Gallons per Day Usually ____ Dollars per _____ Gallons per Day
(EDU(EDU--Equivalent Dwelling Unit)Equivalent Dwelling Unit)
Example:Example:–– $ 3,500 per EDU$ 3,500 per EDU–– 228 gallons per day (gpd) is an EDU228 gallons per day (gpd) is an EDU–– Say 20,000 gpd or 20,000/228 = 87.72 Say 20,000 gpd or 20,000/228 = 87.72 EDUsEDUs–– 87.72 87.72 EDUsEDUs x $ 3,500 per EDU = $ 307,020x $ 3,500 per EDU = $ 307,020
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
Note: Costs May Vary ConsiderablyNote: Costs May Vary Considerably
![Page 35: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/35.jpg)
•• Economic ElementsEconomic Elements–– Cost to ConstructCost to Construct $ 695,000$ 695,000–– Capital Reimbursement FeeCapital Reimbursement Fee 307,020307,020
$ 1,002,020$ 1,002,020
Assume 20 year Payback @ 6.5% InterestAssume 20 year Payback @ 6.5% Interest
12 Payments per year = $ 89,65012 Payments per year = $ 89,650
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
![Page 36: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/36.jpg)
•• Economics of Annual Costs for 20,000 gpdEconomics of Annual Costs for 20,000 gpd–– Payback of Capital CostsPayback of Capital Costs $ 89,650$ 89,650–– Sewer Discharge Fees @ $.005Sewer Discharge Fees @ $.005 26,00026,000–– Sludge Disposal @ $ 35.00/tonSludge Disposal @ $ 35.00/ton 75,90075,900–– UtilitiesUtilities 8,0008,000–– Chemicals (Polymer/Lime)Chemicals (Polymer/Lime) 9,7509,750–– Permit & AnalysisPermit & Analysis 3,0003,000–– Repair & MaintenanceRepair & Maintenance 5,0005,000–– Wages & BenefitsWages & Benefits 40,00040,000–– InsuranceInsurance 5,0005,000–– Cost of PropertyCost of Property 10,00010,000
$ 272,300$ 272,300
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
5,200,000 Gal per year at 5.2 cents/gallon5,200,000 Gal per year at 5.2 cents/gallon
![Page 37: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/37.jpg)
SSUMMARYUMMARY
cents/galloncents/gallon5.245.24Dedicated FacilityDedicated Facility
cents/galloncents/gallon2.2842.284Land ApplicationLand Application
cents/galloncents/gallon7.6677.667POTWPOTW
Disposal Costs Based on 20,000 Gallons Per DayDisposal Costs Based on 20,000 Gallons Per Day
![Page 38: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/38.jpg)
•• Economics of ConstructionEconomics of Construction–– Land & BuildingLand & Building $ 400,000$ 400,000–– Screen/Grit RemovalScreen/Grit Removal 50,00050,000–– Dewatering EquipmentDewatering Equipment 100,000100,000–– TankageTankage 50,00050,000–– Odor ControlOdor Control 25,00025,000–– Engineering & PermitsEngineering & Permits 30,00030,000–– Plumbing & ElectricalPlumbing & Electrical 40,00040,000
$ 695,000$ 695,000Disclaimer: Costs May Vary Considerably Disclaimer: Costs May Vary Considerably
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
10,000 ------------
150,000 ------------
705,000 ------------
![Page 39: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/39.jpg)
•• Economics of Annual Costs for 20,000 gpdEconomics of Annual Costs for 20,000 gpd–– Payback of Capital CostsPayback of Capital Costs $ 89,650$ 89,650–– Sewer Discharge Fees @ $.005Sewer Discharge Fees @ $.005 26,00026,000–– Sludge Disposal @ $ 35.00/tonSludge Disposal @ $ 35.00/ton 75,90075,900–– UtilitiesUtilities 8,0008,000–– Chemicals (Polymer/Lime)Chemicals (Polymer/Lime) 9,7509,750–– Permit & AnalysisPermit & Analysis 3,0003,000–– Repair & MaintenanceRepair & Maintenance 5,0005,000–– Wages & BenefitsWages & Benefits 40,00040,000–– InsuranceInsurance 5,0005,000–– Cost of PropertyCost of Property 10,00010,000
5,200,000 Gal per year at 5.2 cents/gallon5,200,000 Gal per year at 5.2 cents/gallon $ 272,300$ 272,300
DDEDICATEDEDICATED FFACILITYACILITY TTECHNOLOGIESECHNOLOGIES
90,550 ------------
40,000 ------------
8,000 ------------
235,550------------
4.53-------
![Page 40: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/40.jpg)
SSUMMARYUMMARY
cents/galloncents/gallon4.534.53Dedicated FacilityDedicated Facility
cents/galloncents/gallon2.2842.284Land ApplicationLand Application
cents/galloncents/gallon7.6677.667POTWPOTW
Disposal Costs Based on 20,000 Gallons Per DayDisposal Costs Based on 20,000 Gallons Per Day
![Page 41: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/41.jpg)
MORE INFO?MORE INFO?
Water Environment Federation
Septage Handling
Manual of Practice No. 24
1-703-684-2400www.wef.org/applications/publications/
![Page 42: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/42.jpg)
NAWT 4NAWT 4thth AnnualAnnualWaste Treatment SymposiumWaste Treatment Symposium
October 9October 9--10, 200910, 2009Orlando, FLOrlando, FL
NAWT Thanks Select Processing for hosting the 2009 Treatment
Symposium
![Page 43: Evaluating Costs Part of Decision Making Tom Ferrero Costs Part of Decision... · •Economics of Annual Costs for 20,000 gpd – Payback of Capital Costs $ 89,650 – Sewer Discharge](https://reader034.fdocuments.in/reader034/viewer/2022050105/5f4336958f9d560aaf6f896f/html5/thumbnails/43.jpg)
Evaluating Costs as PartEvaluating Costs as Partof the Decision Making Processof the Decision Making Process
336 Chestnut Lane336 Chestnut LaneAmbler, PA 19002Ambler, PA 19002--10011001
Telephone: 800Telephone: [email protected]@nawt.org