Elementary_Budget_preso_Mar2009

20
Half Hollow Hills Central School District Elementary PTA Elementary PTA Budget Budget Presentation Presentation 3/26/2009 3/26/2009

description

Presentation to HHH community regarding elementary aspects of the 2009-2010 budget.

Transcript of Elementary_Budget_preso_Mar2009

Page 1: Elementary_Budget_preso_Mar2009

Half Hollow HillsCentral School

DistrictElementary PTA Elementary PTA

Budget Budget Presentation Presentation

3/26/20093/26/2009

Page 2: Elementary_Budget_preso_Mar2009

Highest AchievingAmong the lowest per pupil

expenditure

Page 3: Elementary_Budget_preso_Mar2009

Enrollment trend

TOTAL ENROLLMENT 1988/89 TO 2008/09

7,4

51

7,3

24

7,2

15

7,0

33

7,0

69

7,0

55

7,1

07

7,2

36

7,4

99

7,8

35

8,1

10 8,4

71

8,7

17 9,1

92

9,5

83

9,9

74

7,7

41

10,0

98

10,1

48

10,1

68

10,1

96

6,000

7,000

8,000

9,000

10,000

11,000

1988 - 89 1993 - 94 1998 - 99 2003-04 2008-09

Page 4: Elementary_Budget_preso_Mar2009

Enrollment TrendEnrollment Trend

Elementary (K-5) Enrollment

4,906

4,617

4,3654,475

4,6514,797 4,773

4,2004,3004,4004,5004,6004,7004,8004,9005,000

2003/

04

2004/

05

2005/

06

2006/

07

2007/

08

2008/

09

2009/

10 est

Page 5: Elementary_Budget_preso_Mar2009

Enrollment TrendEnrollment Trend

Secondary (6-12) Enrollment5,686

5,290

4,9325,177

5,3955,531 5,623

4,4004,6004,8005,0005,2005,4005,6005,800

2003/

04

2004/

05

2005/

06

2006/

07

2007/

08

2008/

09

2009/

10 est

Page 6: Elementary_Budget_preso_Mar2009

Class Sizes

Board of Education Policy for Class SizesBoard of Education Policy for Class SizesKindergarten and First Grade – 22Kindergarten and First Grade – 22Second Grade – 24Second Grade – 24Third, Fourth and Fifth Grades – 26Third, Fourth and Fifth Grades – 26Grades Six through Twelve - 28Grades Six through Twelve - 28

Page 7: Elementary_Budget_preso_Mar2009

Budget-to-Budget Budget-to-Budget comparisoncomparison

AdoptedBudget2008/09

Rollover Budget2009/10

(estimated cost of rolling

forward budget as

is)

NYSContingen

cyFormula Budget

Cap 2009/10

Preliminary

Budget2009/10

As of3/9/09

PreliminaryBudget2009/10

As of3/23/09

Total Budget% Change

$196,188,300

$205,310,849

4.65%

$204,035,8324.0%

$202,949,762

3.45%

$202,345,358

3.14%

NYS Contingency Formula Budget Cap is 120% of CPI or 4% whichever is lowerContingent budget formula cap for 2009/10 is 4.0% per NYS Educ. Dept.2009/10 Proposed Budget is already below the NYS formula cap

Page 8: Elementary_Budget_preso_Mar2009

2009/10 Budget 2009/10 Budget Reductions totaling Reductions totaling close to $3 millionclose to $3 million

Reductions Include:Reductions Include:19.9 budgeted instructional positions19.9 budgeted instructional positions1.2 instructional position moved to 1.2 instructional position moved to

GrantGrant2 paraprofessional positions 2 paraprofessional positions Restructured non-instructional staffing Restructured non-instructional staffing

to eliminate 2 part-time positionsto eliminate 2 part-time positionsPart-time position at the Bus GaragePart-time position at the Bus Garage2.0 budgeted transportation positions 2.0 budgeted transportation positions Officials Fees due to Section XI changes Officials Fees due to Section XI changes

Page 9: Elementary_Budget_preso_Mar2009

Budget Reductions – Budget Reductions – cont’d.cont’d.

District-wide reductions in equipment, District-wide reductions in equipment, supplies and material allocationssupplies and material allocations

Contractual service expendituresContractual service expendituresPlant Projects Plant Projects Curriculum Writing and Scoring Curriculum Writing and Scoring Clubs and Activities reduced and cappedClubs and Activities reduced and cappedIn-Service Training/Staff Development In-Service Training/Staff Development 55thth & 7 & 7thth Grade Swimming Assessment Grade Swimming AssessmentCertain Special Education expenditures Certain Special Education expenditures

moved to Grant due to Federal Stimulusmoved to Grant due to Federal Stimulus

Page 10: Elementary_Budget_preso_Mar2009

Other cost Other cost ReductionsReductions

Restructured the District’s Security Restructured the District’s Security Program enhancing security coverage Program enhancing security coverage while keeping costs levelwhile keeping costs level

Joint effort with other municipalities Joint effort with other municipalities for cost savings for cost savings Recycling - TOHRecycling - TOH Security Alarm Services – So. Huntington Security Alarm Services – So. Huntington

UFSDUFSD Cooperative Purchasing – NYS, BOCES, Cooperative Purchasing – NYS, BOCES,

County, Educational Data ServicesCounty, Educational Data ServicesChaperone assignments reviewed and Chaperone assignments reviewed and

capped at current allocations capped at current allocations

Page 11: Elementary_Budget_preso_Mar2009

Cost reduction Cost reduction initiativesinitiatives

Transportation Efficiency Transportation Efficiency Analysis to produce at least two Analysis to produce at least two fewer routesfewer routes

District-wide energy District-wide energy conservation communication to conservation communication to all buildings to reduce usageall buildings to reduce usage

Page 12: Elementary_Budget_preso_Mar2009

Factors that may Factors that may affect Expenditure affect Expenditure

BudgetBudgetThe following proposed unfunded The following proposed unfunded

mandates are mandates are notnot included in the included in the current budget proposal. We hope to current budget proposal. We hope to receive a decision from the State on receive a decision from the State on these items before budget adoption.these items before budget adoption.MTA tax on all payroll ($400,000)MTA tax on all payroll ($400,000)15% of Pre-school special education 15% of Pre-school special education

($1,000,000)($1,000,000)Contract Transportation budget Contract Transportation budget

subject to revision upon completion of subject to revision upon completion of RFP analysisRFP analysis. .

Page 13: Elementary_Budget_preso_Mar2009

Elementary Program Elementary Program HighlightsHighlights

Full day KindergartenFull day KindergartenUniversal Prekindergarten at Universal Prekindergarten at

each elementary schooleach elementary schoolVariety of extra-curricular clubs Variety of extra-curricular clubs

and activities at each and activities at each elementary schoolelementary school

After School Foreign Language After School Foreign Language Clubs at each elementary schoolClubs at each elementary school

Hills on Stage – District-wide Hills on Stage – District-wide Fifth Grade Theatre Program Fifth Grade Theatre Program

Page 14: Elementary_Budget_preso_Mar2009

Elementary Program Elementary Program HighlightsHighlights

Keyboarding Instruction for all Keyboarding Instruction for all students in third and fourth gradestudents in third and fourth grade

Laptop Pilot ProgramLaptop Pilot ProgramThree computers in every Three computers in every

classroomclassroomWeekly scheduled computer Weekly scheduled computer

instruction utilizing mobile laptop instruction utilizing mobile laptop labs K-4labs K-4

Additional shared mobile laptop lab Additional shared mobile laptop lab 5th grade 5th grade

Page 15: Elementary_Budget_preso_Mar2009

Elementary Program Elementary Program HighlightsHighlights

Planetarium Program Planetarium Program Space Shuttle Program Space Shuttle Program After School Support Programs in After School Support Programs in

English Language Arts and MathEnglish Language Arts and MathWeekly Art, Music, Library Weekly Art, Music, Library

instructioninstructionBi-weekly Physical Education Bi-weekly Physical Education

instruction instruction Universal BusingUniversal Busing

Page 16: Elementary_Budget_preso_Mar2009

Elementary Program Elementary Program HighlightsHighlights

Band/Orchestra lessons in Band/Orchestra lessons in 4th and 5th grade 4th and 5th grade

Health Instruction K-5 Health Instruction K-5 Enrichment Enrichment AHAP Program AHAP Program Reading Support ServicesReading Support ServicesMath Support Services Math Support Services

Page 17: Elementary_Budget_preso_Mar2009

Dates to Remember

Date Time Place Description

Monday, March 23, 2009

8:00 pm Vanderbilt

Budget Presentation

Thursday, March 26, 2009

10:00 am

Manasquan

Elementary PTABudget Presentation

Monday, March 30, 2009

8:00 pm Manasquan

Secondary PTA Budget Presentation

Monday, April 20, 2009

8:00 pm Manasquan

Adopt Budget

Monday, May 11, 2009

8:00 pm Manasquan

Public Hearing

Tuesday, May 19, 2009

7:00am to

10:00pm

H.S. East Budget VOTE

Page 18: Elementary_Budget_preso_Mar2009

Questions, Comments, and

Feedback

Page 19: Elementary_Budget_preso_Mar2009

One of the highlights of the elementary students’ year is their trip to the Shuttle Room (now the Discovery Center) to learn all aspects of science through hands on experiments. Tom and Brian have been re-designing the Discovery Center experience to better align it with the grade 1-5 curriculum. They have already started introducing new experiments which will engage students and prepare them for assessments. They will be shifting the focus of the Discovery Center from the Moon/Apollo missions to the robotic exploration

of Mars. This summer, they will be building a 15 ft square Martian landscape with rovers that the students will control during NASA mission simulations.

Page 20: Elementary_Budget_preso_Mar2009

With visits from every elementary class, multiple visits from each Middle/High school Earth Science class, and countless presentations to High School core and elective classes, Tom and Brian teach over 12,000 students a year. They have created a number of interdisciplinary programs which illustrate how connected all of our subjects are. Below is a list of some of these interdisciplinary classes:

Exobiology (Biology)

Spectroscopy (Chemistry)

Archaeoastronomy (Global Studies)

Planetary motions (Physics)

Mythology of the Stars (English)

Ancient Astronomers (Math)