Tallinna Elektrijaam Tallinn Powerplant Andres Taukar 27.01.2011

Transcript of Dalkia in Estonia Tallinna Küte & Eraküte - lsta.lt PHA 27 01 11.pdfFirst synchronization of...

Tallinna Elektrijaam

Tallinn PowerplantAndres Taukar27.01.2011

Tallinna Elektrijaam

Ceneral data

Output of the CHP plant 25 MWel / 49 MWth + scrubber 18 MWth (max)

Fuel wood and peat

Woodchips consumption up to 270 000 sm3/year

Planned electricity production up to180 GWh/year

Planned heat production up to 430 GWh/year

Decrease in CO2 emissions 266 000 ton/year

Efficiency up to 90 % (over 100% with FGC)

Investment 72,2 m€

Staff 23 employees

Tallinna Elektrijaam

Tallinna Küte : Tallinn DH network

Tallinna Elektrijaam

Project Milestones

Feasability study 2003

EIA report 2004-2006

Main contracts signed 08.2006

Detailled land planning 08.2006

Investment decision 12.2006

Construction-permit 06.2007

Loan contract 08.2007

First foundation ready 10.2007

Start of boiler & turbine

installation 01/04.2008

First fire in the boiler 11.2008

First steam to the turbine 01.2009

First synchronization of turbine 23.01.2009

Start of full load production 02.2009

Tallinna Elektrijaam

Project ExpectationsVery high efficiency

Production of the renewable energy/electricity up to 180GWh/year

Very efficient reduction of the CO2 emission

Power and heat cogeneration all year round

Alternative supplier of the heat. Decreasing the dependence onnatural gas. Increasing the reliability of the DH network.Decreasing the natural gas import

Decentralization of the power generation and positive impact tothe reliability of the electrical system

Valuation of the low quality forests. Increasing the employment inrural areas

Decreasing the water use and oil shale combustion in Narvapowerplants

Gentrification one of the most awful areas in Tallinn

Tallinna Elektrijaam

Fuel supply - social and environmental impacts

Biofuels reduce greenhouse gasemissions in comparison to fossil fuels

Increasing stable demand of biofuelscaused a boom on biofuel market .

More value is added to forestry sector

Additional investments are made intowood processing equipment

This has encouraged new supportschemes for forest and agriculureentrepreneurs

Created new jobs and contributed toregional and rural development

Tallinna Elektrijaam

� Classical cycle with a steam boiler, a steam turbine and a generator

� Flue Gas Condenser (Scrubber)

� Combustion air Humidification system

FGC

boiler turbine G

water

Makeupwater

DH net

Tallinna Elektrijaam

Fluidized-bed steam boiler NFBST:

Power (MCR) 75 MW

Steam output 28.2 kg/s

Steam parameters:pressure 110 barstemperature 530 oC

Main fuelswood chips, forest wastepeatwood fuels + peat

Fuel for startlight fuel oil

Tallinna Elektrijaam

Single-housing condensation (back pressure)extraction turbine Siemens SST 600

Number of bleeds 41. High pressure heat exchanger2. Deaerator3. Low pressure heat exchanger4. District heating network heat exchanger

Nom. exhaust steam pressure 0.27 barMax. exhaust steam pressure 3.10 barNumber of blades lines 28 pcsTurbine control system TURLOOP S7Generator rated power 25 MWRotations frequency

– Steam turbine 6000 p/min– Generator 1500 p/min

Tallinna Elektrijaam

The scrubber enables flue gascleaning and water vapourcondensation by adding heat power upto 18 MWth.

Water used in the scrubber is purifiedand after that used in the districtheating network as make-up water.

Tallinna Elektrijaam

Company structure

Powerplantmanager

Financialmanager

Personnelmanager-secretary

Operationalmanager

Maintenancemanager

Engineer Administrativemanager

Accountant

I shift(2)

II shift(2)

III shift(2)

IV shift(2)

V shift(2)

Automationspecialist

Electricalspecialist

Mechanicalspecialist

Board

Chemicalengineer

Chiefoperator

Tallinna Elektrijaam

2010 estimation

Net sales 30,6 MEURSales of electricity 178 285 MWhSales of heat energy 424 530 MWh

EBITDA 18,0 MEUR

Net profit 11,2 MEUR

Balance sheet 79,4 MEUR

Tallinna Elektrijaam

Construction Progress 10/2007-02/2009

Tallinna Elektrijaam

Winter 2010

Tallinna Elektrijaam

THANK YOU!