CHILD ADVOCACY CENTRE PT SLABS - Amazon S3s3-ap-southeast-2.amazonaws.com › ... › 07 ›...

1
IMAGES (FROM TOP TO BOTTOM) Architect’s impression. Installation in progress. Installation in progress. PROJECT Stan & Jean Perron Child Advocacy Centre PT Slabs CLIENT Pindan FORTEC CONTACT 08 6206 6999 DESCRIPTION Australia’s largest child advocacy centre is being built on a heritage site at Midland’s historic railway workshops. Fortec was awarded the contract to design and construct the post tensioned slabs from levels 1-4, the design consisted of approximately 5750m 2 of suspended slab area with 28T of PT and 50T of reinforcement. The scope included: Design and detail post tensioned floors. Fix recess forms and anchorages. Place and fix ducting. Install tendons. Stress tendons. Grout tendons. HIGHLIGHTS All works were self-performed by Fortec. Completed to budget. Design and site works completed on programme. CHILD ADVOCACY CENTRE PT SLABS DESIGN & CONSTRUCT POST TENSIONED SLABS MIDLAND, WA

Transcript of CHILD ADVOCACY CENTRE PT SLABS - Amazon S3s3-ap-southeast-2.amazonaws.com › ... › 07 ›...

Page 1: CHILD ADVOCACY CENTRE PT SLABS - Amazon S3s3-ap-southeast-2.amazonaws.com › ... › 07 › 29131315 › ...Tensione… · Stan & Jean Perron Child Advocacy Centre PT Slabs CLIENT

IMAGES (FROM TOP TO BOTTOM)

� Architect’s impression. � Installation in progress. � Installation in progress.

PROJECTStan & Jean Perron Child Advocacy Centre PT Slabs

CLIENTPindan

FORTEC CONTACT 08 6206 6999

DESCRIPTION Australia’s largest child advocacy centre is being built on a heritage site at Midland’s historic railway workshops.

Fortec was awarded the contract to design and construct the post tensioned slabs from levels 1-4, the design consisted of approximately 5750m2 of suspended slab area with 28T of PT and 50T of reinforcement.

The scope included: � Design and detail post tensioned floors. � Fix recess forms and anchorages. � Place and fix ducting. � Install tendons. � Stress tendons. � Grout tendons.

HIGHLIGHTS � All works were self-performed by Fortec. � Completed to budget. � Design and site works completed on programme.