CHALLENGES IN DEVELOPMENT OF ERDMP
description
Transcript of CHALLENGES IN DEVELOPMENT OF ERDMP
![Page 1: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/1.jpg)
1
Cleaner Environment
CHALLENGES IN DEVELOPMENT
OF
ERDMP
MAHARASHTRA NATURAL GAS LTD, PUNE
28.09.2012
Sagar VarmaSenior Manager( Fire & safety)
![Page 2: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/2.jpg)
2
Cleaner Environment
MAHARASHTRA NATURAL GAS LIMITED (MNGL)
A Joint Venture promoted by
• GAIL (India) Limited; and
• Bharat Petroleum Corporation Limited
MAHARASHTRA NATURAL GAS LTD.
To implement
City Gas Distribution Project in
Pune, Pimpri-Chinchwad (including Hinjewadi, Talegaon & Chakan)
![Page 3: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/3.jpg)
3
Cleaner Environment
DAHEJ BARUCH
HAZIRA
NAVSARI
VALSAD
SILVASA
APTI BUDRUK
HAJIMALANGWADI
DAHANU
VASAIBORIVALI
TROMBAY
GHOTAW`ADE
CHINCHWADETHAL
DABHOL
PUNE
VAPI
SURAT
PANVEL
URANIIL
USAR AMBEWADI
NASIK
SAFALE
GAIL’S TRANSMISSION PIPELINES
1. DAHEJ – URAN PIPELINE
2. DABHOL – PANVEL PIPELINE
3. GHOTAWADE – CHINCHWAD PIPELINE
![Page 4: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/4.jpg)
4
Cleaner Environment
DFR prepared by MECON in 2002
MoP&NG allocated 0.4 MMSCMD APM Gas to Pune City in April’2004
Date of Incorporation - 13.01.2006
Date of Commencement of Business - 24.03.2006
Authorised by PNGRB on 15.04.2009
![Page 5: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/5.jpg)
5
Cleaner Environment
City Gate Station
19 Bar Steel Network
4 Bar PE Network
Mother Station Chinchwad
DRS
GI Installation Service RegulatorDomestic Kitchen
100 mbar PE Network
21 mbar CU
Network
![Page 6: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/6.jpg)
6
Cleaner Environment
Customer Base
Domestic4000
customers
Vehicles24000 auto10000 cars530 buses
Industrial37 nos.
Hotels/Small Commercial
13 commercial
![Page 7: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/7.jpg)
7
Cleaner Environment Major Challenge CGD companies
operate as utilities and operate in city conditions.
Our typical response to emergency is based on customer complaints.
![Page 8: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/8.jpg)
8
Cleaner Environment Major Challenge
Common regulation for midstream as well as downstream.
![Page 9: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/9.jpg)
9
Cleaner Environment
Documentation challenge
Old ERDMP reformatted to include all the 30 points of regulation, 9 schedules and 7 checklists.
Supports in the form of annexure included to give sense to the content
![Page 10: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/10.jpg)
10
Cleaner Environment
Documentation challenge
To include Risk analysis and
consequence mapping.
Collection of data from various departments
![Page 11: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/11.jpg)
11
Cleaner Environment challenges Site visit and
mockdrills Three mockdrills
conducted in span to 2 hours.
resource constraints. Offsite department
involvement
![Page 12: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/12.jpg)
12
Cleaner Environment Other challenges Perception of TPI delegates
Repeated Micro level changes
![Page 13: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/13.jpg)
13
Cleaner Environment
contents
Other Challenges
Flow of document
Longtime taken for each stage of accreditation
Foreword Definitions Executive Summary 11 chapters ( covering each
and every schedule) 20 Annexures 7 Checklists
![Page 14: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/14.jpg)
14
Cleaner Environment Benefits of the exercise Involvement lead to knowledge up gradation Various areas of safety management system
come to surface Comprehensive documentation Knowledge sharing with other CGD Tying of loose ends
![Page 15: CHALLENGES IN DEVELOPMENT OF ERDMP](https://reader036.fdocuments.in/reader036/viewer/2022062501/56815e0e550346895dcc6e26/html5/thumbnails/15.jpg)
15
Cleaner Environment