CASA 1000 HVDC Primary Transmission Line Tajikistan-Afghanistan-Pakistan Full storage 10.5 Bil. cubic meters Active storage 4.5 Bil. cubic meters NUREK HPP AND RESERVOIR Full storage 13 Bil. cubic meters Active storage 8.6 Bil. cubic meters ROGUN HPP Full storage 3.1 Bil. cubic meters Active storage 2.5 Bil. cubic meters KAIRAKKUM RESERVOIR Max. Volume 5 Bil. cubic meters KOKSARAI RESERVOIR (FUTURE PROJECT) Max. Volume 5.2 Bil. cubic meters SHARDARA RESERVOIR Max. Volume 66 Bil. cubic meters ARNASAI DEPRESSION Full storage 19.5 Bil. cubic meters Active storage 14.0 Bil. cubic meters Future Rehabilitation Future Rehabilitation AC/DC Converter Rehabilitation Energy Loss Reduction Project (ELRP) in Tajikistan Energy Emergency Assistance Project in Kyrgyz Rep. Assessment Studies for Rogun HPP Energy Efficiency Facility for Industrial Enterprises Project in Uzbekistan TOKTOGUL RESERVOIR Max. Volume 4.6 Bil. cubic meters KAMBARATA-1 RESERVOIR (FUTURE PROJECT) Power Modernization Project (ADB) in Kyrgyz Rep. Energy Emergency Recovery Assistance Project in Tajikistan Transmission Rehabilitation and Expansion (ADB) Project in Tajikistan Pamir Private Power Project in Tajikistan DUSHANBE DUSHANBE TASHKENT TASHKENT BISHKEK BISHKEK Kzyl-Orda TPP Kzyl-Orda TPP Karakul’ Karakul’ Navoi TPP Navoi TPP 1250 MW 1250 MW Mubarek CHP Mubarek CHP Talimarjan TPP 800 MW Talimarjan TPP 800 MW (expansion) (expansion) Guzar Guzar Sogdiana Sogdiana Surkhan Surkhan Regar Regar Javan Javan CHP CHP Golovnaia HPP Golovnaia HPP Baipaza Baipaza HPP HPP Nurek HPP 3000 MW Nurek HPP 3000 MW Rogun HPP Rogun HPP 3600 MW 3600 MW Tajik Fang-Yagnob Coal TPP 1500 MW Tajik Fang-Yagnob Coal TPP 1500 MW Syrdaria TPP Syrdaria TPP 3000 MW 3000 MW Kairakkum HPP Kairakkum HPP 126MW 126MW Farhad HPP Farhad HPP 126MW 126MW Uzbekiston Uzbekiston Tashkent TPP Tashkent TPP 1860 MW 1860 MW Shardara HPP Shardara HPP 100 MW 100 MW Chimkent Chimkent Charvak HPP 620MW Charvak HPP 620MW Hojikent HPP 165MW Hojikent HPP 165MW Gazalkent HPP 120MW Gazalkent HPP 120MW Angren TPP Angren TPP Lochin Lochin Shamaldysai HPP 240MW Shamaldysai HPP 240MW Uchkurgan HPP Uchkurgan HPP 180MW 180MW Andijgan HPP 140 MW Andijgan HPP 140 MW Tashkumyr HPP 450MW Tashkumyr HPP 450MW Kurpsai HPP 800 MW Kurpsai HPP 800 MW Toktogul HPP 1200MW Toktogul HPP 1200MW Ala-Bel’ Ala-Bel’ Bishkek CHP Bishkek CHP Frunzenskaia Zhambyl Zhambyl Zhambyl TPP Zhambyl TPP 1230 MW 1230 MW Almaty Almaty YuK GRES YuK GRES Kapchagai HPP Kapchagai HPP Atbashi HPP 40MW Atbashi HPP 40MW APK CHP-3 APK CHP-3 Hojent 500/220 kV Hojent 500/220 kV Datka 500/220 kV Datka 500/220 kV Lake Sarez HPP 250 MW Lake Sarez HPP 250 MW Kambarata 1 HPP Kambarata 1 HPP 1900 MW 1900 MW Kambarata 2 HPP Kambarata 2 HPP 240/360 MW 240/360 MW Moinak HPP Moinak HPP 300 MW 300 MW Sangtuda 1 HPP 670 MW Sangtuda 1 HPP 670 MW Sangtuda 2 HPP 220 MW Sangtuda 2 HPP 220 MW KAZAKHSTAN KAZAKHSTAN UZBEKISTAN UZBEKISTAN TURKMENISTAN TURKMENISTAN TAJIKISTAN TAJIKISTAN AFGHANISTAN AFGHANISTAN CHINA CHINA KYRGYZ REP. KYRGYZ REP. Novo-Angren TPP 2100 MW Novo-Angren TPP 2100 MW Shu Shu Alma Alma Kemin Kemin Coal TPP 1200 MW Coal TPP 1200 MW Coal TPP Coal TPP 200 MW 200 MW CHINA CHINA Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank) Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank) DUSHANBE TASHKENT BISHKEK Kzyl-Orda TPP Karakul’ Navoi TPP 1250 MW Mubarek CHP Talimarjan TPP 800 MW (expansion) Guzar Sogdiana Surkhan Regar Javan CHP Coal TPP 200 MW Golovnaia HPP Baipaza HPP Nurek HPP 3000 MW Rogun HPP 3600 MW Tajik Fang-Yagnob Coal TPP 1500 MW Syrdaria TPP 3000 MW Kairakkum HPP 126MW Farhad HPP 126MW Uzbekiston Tashkent TPP 1860 MW Shardara HPP 100 MW Chimkent Charvak HPP 620MW Hojikent HPP 165MW Gazalkent HPP 120MW Angren TPP Lochin Shamaldysai HPP 240MW Novo-Angren TPP 2100 MW Uchkurgan HPP 180MW Andijgan HPP 140 MW Tashkumyr HPP 450MW Kurpsai HPP 800 MW Toktogul HPP 1200MW Ala-Bel’ Bishkek CHP Frunzenskaia Zhambyl Zhambyl TPP 1230 MW Shu Almaty Alma Kemin YuK GRES Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank) Kapchagai HPP Sary-Jaz Cascade of HPPs 700–1500 MW Atbashi HPP 40MW Coal TPP 1200 MW APK CHP-3 Hojent 500/220 kV Datka 500/220 kV Lake Sarez HPP 250 MW Kambarata 1 HPP 1900 MW Kambarata 2 HPP 240/360 MW Moinak HPP 300 MW Sangtuda 1 HPP 670 MW Sangtuda 2 HPP 220 MW C KAZAKHSTAN UZBEKISTAN TURKMENISTAN TAJIKISTAN AFGHANISTAN CHINA CHINA KYRGYZ REP. S y r D a r y a Am u D a r y a Z e r a v s h a n D a r y a N a r y n N a r y n V a k h s h K a r a k um C a n a l P y a n j Aydarkul Aydarkul Lake Lake Lake Lake Issyk-Kul Issyk-Kul Aydarkul Lake Lake Issyk-Kul S y r D a r y a Am u D a r y a Z e r a v s h a n D a r y a N a r y n S a r y -J a z N a r y n V a k h s h K a r a k um C a n a l P y a n j 64° 72° 38° 72° 64° 38° Area of Main Map Aral Sea TAJIKISTAN TAJIKISTAN UZBEKISTAN UZBEKISTAN TURKMENISTAN TURKMENISTAN AFGHANISTAN AFGHANISTAN KYRGYZ KYRGYZ REPUBLIC REPUBLIC CHINA CHINA ISLAMIC REP. ISLAMIC REP. OF IRAN OF IRAN TAJIKISTAN UZBEKISTAN TURKMENISTAN AFGHANISTAN KYRGYZ REPUBLIC CHINA ISLAMIC REP. OF IRAN KAZAKHSTAN CENTRAL ASIA REGIONAL ENERGY–WATER PROGRAM IBRD 39284 MAY 2012 0 100 200 KILOMETERS HYDRO POWER PLANTS: < 500 MW 500–1000 MW > 1,000 MW THERMAL POWER PLANTS: < 500 MW 500–1000 MW > 1,000 MW 500 kV SUBSTATIONS 500 kV OVERHEAD LINES OPERATIONAL UNDER CONSTR. This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries. PROSPECTIVE IRRIGATED LAND KARAKUM CANAL MAIN RIVERS MAIN TRIBUTARIES NATIONAL CAPITALS INTERNATIONAL BOUNDARIES Population (millions) GNI per capita ($) Land area (000 km 2 ) KAZ 15.67 6126 2725 KYG 5.28 758 192 TAJ 6.84 585 140 TURK 5.03 2783 470 UZB 27.31 915 425

Transcript of CENTRAL ASIA REGIONAL ENERGY–WATER PROGRAM ......Lake Sarez HPP 250 MWLake Sarez HPP 250 MW...

Page 1: CENTRAL ASIA REGIONAL ENERGY–WATER PROGRAM ......Lake Sarez HPP 250 MWLake Sarez HPP 250 MW Kambarata 1 HPPKambarata 1 HPP 1900 MW19 0 MW Kambarata 2 HPPKambarata 2 HPP 240/360 MW24

CASA 1000 HVDC Primary Transmission LineTajikistan-Afghanistan-Pakistan

Full storage 10.5 Bil. cubic metersActive storage 4.5 Bil. cubic meters

NUREK HPP AND RESERVOIR

Full storage 13 Bil. cubic metersActive storage 8.6 Bil. cubic meters

ROGUN HPP

Full storage 3.1 Bil. cubic metersActive storage 2.5 Bil. cubic meters

KAIRAKKUM RESERVOIR

Max. Volume 5 Bil. cubic metersKOKSARAI RESERVOIR (FUTURE PROJECT)

Max. Volume 5.2 Bil. cubic metersSHARDARA RESERVOIR

Max. Volume 66 Bil. cubic metersARNASAI DEPRESSION

Full storage 19.5 Bil. cubic metersActive storage 14.0 Bil. cubic meters

Future Rehabilitation

Future Rehabilitation

AC/DC Converter

Rehabilitation

Energy Loss ReductionProject (ELRP) in Tajikistan

Energy Emergency AssistanceProject in Kyrgyz Rep.

Assessment Studies for Rogun HPP

Energy Efficiency Facilityfor Industrial Enterprises

Project in Uzbekistan

TOKTOGUL RESERVOIR

Max. Volume 4.6 Bil. cubic metersKAMBARATA-1 RESERVOIR (FUTURE PROJECT)

Power Modernization Project(ADB) in Kyrgyz Rep.

Energy Emergency RecoveryAssistance Project in Tajikistan

Transmission Rehabilitation and Expansion (ADB) Project in Tajikistan

Pamir Private Power Projectin Tajikistan

DUSHANBEDUSHANBE

TASHKENTTASHKENT

BISHKEKBISHKEK

Kzyl-Orda TPPKzyl-Orda TPP

Karakul’Karakul’

Navoi TPPNavoi TPP1250 MW1250 MW

Mubarek CHPMubarek CHP

Talimarjan TPP 800 MWTalimarjan TPP 800 MW(expansion)(expansion)

GuzarGuzar

SogdianaSogdiana

SurkhanSurkhan

RegarRegar

JavanJavanCHPCHP

Golovnaia HPPGolovnaia HPP

BaipazaBaipazaHPPHPP

Nurek HPP 3000 MWNurek HPP 3000 MW

Rogun HPPRogun HPP3600 MW3600 MW

Tajik Fang-Yagnob Coal TPP 1500 MWTajik Fang-Yagnob Coal TPP 1500 MW

Syrdaria TPPSyrdaria TPP 3000 MW 3000 MW

Kairakkum HPPKairakkum HPP126MW126MWFarhad HPPFarhad HPP

126MW126MW

UzbekistonUzbekiston

Tashkent TPPTashkent TPP 1860 MW 1860 MW

Shardara HPPShardara HPP100 MW100 MW

ChimkentChimkentCharvak HPP 620MWCharvak HPP 620MW

Hojikent HPP 165MWHojikent HPP 165MWGazalkent HPP 120MWGazalkent HPP 120MW Angren TPPAngren TPP

LochinLochin

Shamaldysai HPP 240MWShamaldysai HPP 240MWUchkurgan HPPUchkurgan HPP180MW180MW

Andijgan HPP 140 MWAndijgan HPP 140 MW

Tashkumyr HPP 450MWTashkumyr HPP 450MWKurpsai HPP 800 MWKurpsai HPP 800 MW

Toktogul HPP 1200MWToktogul HPP 1200MW

Ala-Bel’Ala-Bel’

Bishkek CHPBishkek CHPFrunzenskaia

ZhambylZhambylZhambyl TPPZhambyl TPP1230 MW1230 MW

AlmatyAlmaty

YuK GRESYuK GRES

Kapchagai HPPKapchagai HPP

Atbashi HPP 40MWAtbashi HPP 40MW

APK CHP-3APK CHP-3

Hojent 500/220 kVHojent 500/220 kV

Datka 500/220 kVDatka 500/220 kV

Lake Sarez HPP 250 MWLake Sarez HPP 250 MW

Kambarata 1 HPPKambarata 1 HPP1900 MW1900 MW

Kambarata 2 HPPKambarata 2 HPP240/360 MW240/360 MW

Moinak HPPMoinak HPP300 MW300 MW

Sangtuda 1 HPP 670 MWSangtuda 1 HPP 670 MW

Sangtuda 2 HPP 220 MWSangtuda 2 HPP 220 MW

K A Z A K H S T A NK A Z A K H S T A N

U Z B E K I S T A NU Z B E K I S T A N

TURKMENISTANTURKMENISTAN

TAJIKISTANTAJIKISTAN

A F G H A N I S T A NA F G H A N I S T A N

C H I N AC H I N A

KYRGYZ REP.KYRGYZ REP.

Novo-Angren TPP 2100 MWNovo-Angren TPP 2100 MW

ShuShu AlmaAlma

KeminKemin

Coal TPP 1200 MWCoal TPP 1200 MW

Coal TPPCoal TPP200 MW200 MW

C H I N AC H I N A

Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank)Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank)

DUSHANBE

TASHKENT

BISHKEK

Kzyl-Orda TPP

Karakul’

Navoi TPP1250 MW

Mubarek CHP

Talimarjan TPP 800 MW(expansion)

Guzar

Sogdiana

Surkhan

Regar

JavanCHP

Coal TPP200 MW

Golovnaia HPP

BaipazaHPP

Nurek HPP 3000 MW

Rogun HPP3600 MW

Tajik Fang-Yagnob Coal TPP 1500 MW

Syrdaria TPP3000 MW

Kairakkum HPP126MWFarhad HPP

126MW

Uzbekiston

Tashkent TPP 1860 MW

Shardara HPP100 MW

ChimkentCharvak HPP 620MW

Hojikent HPP 165MWGazalkent HPP 120MW Angren TPP

Lochin

Shamaldysai HPP 240MW

Novo-Angren TPP 2100 MW

Uchkurgan HPP180MW

Andijgan HPP 140 MW

Tashkumyr HPP 450MWKurpsai HPP 800 MW

Toktogul HPP 1200MW

Ala-Bel’

Bishkek CHPFrunzenskaia

ZhambylZhambyl TPP1230 MW

ShuAlmaty

Alma

Kemin

YuK GRES

Balkhash TPP 1320 MW (ADB, EBRD, IFC, Korea Exim Bank)

Kapchagai HPP

Sary-Jaz Cascade of HPPs700–1500 MW

Atbashi HPP 40MW

Coal TPP 1200 MW

APK CHP-3

Hojent 500/220 kV

Datka 500/220 kV

Lake Sarez HPP 250 MW

Kambarata 1 HPP1900 MW

Kambarata 2 HPP240/360 MW

Moinak HPP300 MW

Sangtuda 1 HPP 670 MW

Sangtuda 2 HPP 220 MWC

K A Z A K H S T A N

U Z B E K I S T A N

TURKMENISTAN

TAJIKISTAN

A F G H A N I S T A N

C H I N A

C H I N A

KYRGYZ REP.

Syr Darya

Amu Darya

Zeravshan Darya

Naryn

Naryn

Vak

hshKarakum Canal

Pyanj

AydarkulAydarkulLakeLake

LakeLakeIssyk-Kul Issyk-Kul

AydarkulLake

LakeIssyk-Kul

Syr Darya

Amu Darya

Zeravshan Darya

Naryn

Sary-Jaz

Naryn

Vak

hshKarakum Canal

Pyanj

64° 72°

38°

72°64°

38°Area of Main Map

Aral Sea

TAJIKISTANTAJIKISTAN

UZBEKISTANUZBEKISTANTURKMENISTANTURKMENISTAN

AFGHANISTANAFGHANISTAN

KYRGYZKYRGYZREPUBLICREPUBLIC

CHINACHINA

ISLAMIC REP.ISLAMIC REP.OF IRANOF IRAN

TAJIKISTAN

UZBEKISTANTURKMENISTAN

AFGHANISTAN

KYRGYZREPUBLIC

CHINA

ISLAMIC REP.OF IRAN

KAZAKHSTAN

CENTRAL ASIA REGIONAL ENERGY–WATER PROGRAM IBRD 39284

MAY 2012

0 100 200

KILOMETERS

HYDRO POWER PLANTS:

<500 MW

500–1000 MW

>1,000 MW

THERMAL POWER PLANTS:

<500 MW

500–1000 MW

>1,000 MW

500 kV SUBSTATIONS

500 kV OVERHEAD LINES

OPERATIONALUNDER CONSTR.

Th is map was produced by the Map Des ign Uni t o f The Wor ld Bank. The boundar ies , co lo rs , denominat ions and any other in format ionshown on th is map do not imply, on the par t o f The Wor ld BankGroup, any judgment on the lega l s tatus of any te r r i to ry , o r anyendorsement or acceptance of such boundar ies .

PROSPECTIVE

IRRIGATED LAND

KARAKUM CANAL

MAIN RIVERS

MAIN TRIBUTARIES

NATIONAL CAPITALS

INTERNATIONAL BOUNDARIES

Population (millions)

GNI per capita ($)

Land area (000 km2)

KAZ

15.67

6126

2725

KYG

5.28

758

192

TAJ

6.84

585

140

TURK

5.03

2783

470

UZB

27.31

915

425