- - - - - - - - - - - - I NELSAP PIPELINE PROJECTS FOR PREPARATION FUNDS PRE-SELECTION NELSAP PROJECTS PI PELIN E 2016 - 2019 - Project Name Countries Project Objectives - Project Project status Project Executing (TOR) & Scope of Preparation/ Agency Study Study cost Project Investment cost No. Power Transmission/Interconnection Projects Inteconnection & Uganda (Olwiyo)-South Sudan (Juba) Power Uganda/South Sudan NELSAP Feasibility Study 3.0 170.0 Transmission interconnection, 400KV of 254 Km 1 Trade Inteconnection & NELSAP 2 Ethiopia (Oedesa-Tepi) - South Sudan (Bor-Juba) Ethiopia/South Sudan Feasibility Study 3.0 420.0 Power TL, 400kV AC/500HVOC of 700 km Trade 3 Burundi (Jiji - Mulembwe) - Tanzania (Kigoma) Burundi/Tanzania Inteconnection & NELSAP 2.0 Feasibility Study 80.0 Power Transmission Line, 220KV of 180km Trade 4 Ethiopia (Gambella) - South Sudan (Malakal) Power Inteconnection & NELSAP 3.0 102.0 TL (Phase 1), 230kV of 357 km Ethiopia/South Sudan Feasibility Study Trade S South Sudan (Juba-Torit-Kapoeta)- Inteconnection & South Sudan/Kenya NELSAP Feasibility Study 3.0 86.0 Kenya(Lokichogio) in220kV of 480km Trade 6 Renk - Malakal TL in South Sudan in 220 kV of 320 In-country South Sudan NELSAP Feasibility Study 3.0 154.0 km + 3 substations reinforcement with regional impact 7 South Sudan(Bor) - South S(Malakal) Power TL-400 In-country NELSAP 3.0 108.0 kVof 366 km South Sudan Feasibility Study reinforcement with regional impact 8 Malakal - Bentiu TL in South Sudan in 220 kV of 222 In-country South Sudan NELSAP Feasibility Study 3.0 52.0 km reinforcement with Iregional impact I Power Generation Projects 6.0 ' 2 1 Semuliki Hydropower Project (72 MW) I Power Uganda,ORC NELSAP Feasibilty Study Mugomba Hydropower Project, ( 100 MW) 6.0 3 ORC Power generation NELSAP Feasibilty Sudy Akanyaru river Small hydropower Projects (SHP) ( 3.0 25MW) (6+13+6) 4 Rwanda/Burundi Power generation NELSAP Feasibilty Sudy 5.0 study Bedden 596 HPP (S40MW) South Sudan Power generation NEL5AP Update Feasibility Financiers/ Donors interested AfDB Page 1 of 2 I

Transcript of I NELSAP PIPELINE PROJECTS FOR PREPARATION...

Page 1: I NELSAP PIPELINE PROJECTS FOR PREPARATION FUNDSnelsap.nilebasin.org/attachments/article/147/NELSAP... · 2019-05-24 · Lakki 524 HPP (South S)(410MW) Shukoli HPP 235 MW South Sudan

- - - - - - - - - - - -

I

NELSAP PIPELINE PROJECTS FOR PREPARATION FUNDS PRE-SELECTION

NELSAP PROJECTS PI PELIN E2016 - 2019 -

Project Name Countries Project Objectives -

Project Project status Project

Executing (TOR) &Scope of Preparation/

Agency Study Study cost

Project

Investment

cost

No.

Power Transmission/Interconnection Projects Inteconnection &Uganda (Olwiyo)-South Sudan (Juba) Power Uganda/South Sudan NELSAP Feasibility Study 3.0 170.0

Transmission interconnection, 400KV of 254 Km

1

Trade

Inteconnection & NELSAP2 Ethiopia (Oedesa-Tepi) - South Sudan (Bor-Juba) Ethiopia/South Sudan Feasibility Study 3.0 420.0

Power TL, 400kV AC/500HVOC of 700 km Trade

3 Burundi (Jiji - Mulembwe) - Tanzania (Kigoma) Burundi/Tanzania Inteconnection & NELSAP 2.0Feasibility Study 80.0

Power Transmission Line, 220KV of 180km Trade

4 Ethiopia (Gambella) - South Sudan (Malakal) Power Inteconnection & NELSAP 3.0 102.0

TL (Phase 1), 230kV of 357 km

Ethiopia/South Sudan Feasibility Study

Trade

S South Sudan (Juba-Torit-Kapoeta)- Inteconnection &South Sudan/Kenya NELSAP Feasibility Study 3.0 86.0

Kenya(Lokichogio) in220kV of 480km Trade

6 Renk - Malakal TL in South Sudan in 220 kV of 320 In-countrySouth Sudan NELSAP Feasibility Study 3.0 154.0

km + 3 substations reinforcement with

regional impact

7 South Sudan(Bor) - South S(Malakal) Power TL-400 In-country NELSAP 3.0 108.0

kVof 366 km

South Sudan Feasibility Study

reinforcement with

regional impact

8 Malakal - Bentiu TL in South Sudan in 220 kV of 222 In-countrySouth Sudan NELSAP Feasibility Study 3.0 52.0

km reinforcement with

Iregional impact I

Power Generation Projects 6.0 '

2

1 Semuliki Hydropower Project (72 MW) I Power generatio~Uganda,ORC NELSAP Feasibilty Study

Mugomba Hydropower Project, ( 100 MW) 6.0

3

ORC Power generation NELSAP Feasibilty Sudy

Akanyaru river Small hydropower Projects (SHP) ( 3.0

25MW) (6+13+6)

4

Rwanda/Burundi Power generation NELSAP Feasibilty Sudy

5.0

study

Bedden 596 HPP (S40MW) South Sudan Power generation NEL5AP Update Feasibility

~

Financiers/

Donors

interested

AfDB

Page 1 of 2

I

Page 2: I NELSAP PIPELINE PROJECTS FOR PREPARATION FUNDSnelsap.nilebasin.org/attachments/article/147/NELSAP... · 2019-05-24 · Lakki 524 HPP (South S)(410MW) Shukoli HPP 235 MW South Sudan

5

6

Lakki 524 HPP (South S)(410MW)

Shukoli HPP 235 MW

South Sudan

South Sudan

Power generation

Power generation

NELSAP

NEL5AP

Update Feasibility

study

Update Feasibility

study

5.0

4.0

Sub-Total for Power Projects ..

1 Shared Soono Multipurpose Water Resources

Development Project (Kenya/Uganda) - for Power

sector, Water resources development (Hydro Power

generation). Industry, and Trade

Transboundarv Multipurpose Water Projects Kenya/Uganda Hydrpower NELSAP Identification done

generation & Water FS & ESIA to be done

Supply

S2.0

1.1

1,172.0

10.0

2 5hared Angolola Multipurpose Water Resources

Development Project

Kenya/Uganda Hydrpower

generation & Water

Supply

NELSAP FS and ESIA to be

done

3.0 67.0

3 Integrated Fisheries Management of Jebel Awhia Sudan/South Sudan

Dam Reservoir of 629km length 2/3 in Sudan & 1/3 in

S.Sudan

Reservoir

Management

NELSAP Pre-Feasibility 2.0 30.0

4 Preparation of an Inland Waterway Sector

Investment Program in the Lake Albert, Albert Nile,

Bahr EI-Jebel river basins and the main Nile

Uganda, South Sudan,

Sudan

Waterway Transport NElSAP Pre-Feasibility 6.0

5 Akanyaru Multipurpose Water Resources

Development Project (12,474 Ha; Water Supply

614,200 persons)

Burundi/Rwanda Hydrpower

generation & Water

Supply

NELSAP Prefeasibility done 2.0 6S.0

6 Rehabilitation of the navigation route from Khartoum Uganda, South Sudan,

to Juba (White Nile + Bahr EI Gebel) Sudan

Waterway Transport NELSAP Pre-Feasibility 3.0

7 Bahr Elarab/ Bahr EIGazal Basin Management and Sudan/South Sudan

Development project.

Sub-Tota'i for Trans'boundary Wat,er Re.sources Projects

Hydrpower

generation & Water

Supply

NELSAP Pre-Feasibility 3.0

20.1 --­

172.0'

GRAND TOTALS·NElSAP PREPARATION FUND REQUIREMENTS 72.1 1,344.0