8/6/2019 CCA Proposal Group6 http://slidepdf.com/reader/full/cca-proposal-group6 1/10 CCA Proposals Group 6 (Philippines) cen e u ao ea Daria Mathew (Facilitator) Isidra D. Penaranda Edgardo C. Manda Lasaro P. Salvacion Enrico R. Corvera Theresa Audrey Esteban Narensh Nair The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Transcript of CCA Proposal Group6

Page 1: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 1/10

CCA Proposals

Group 6(Phi l ippines)

cen e u ao ea

Daria Mathew (Facilitator)

Isidra D. Penaranda

Edgardo C. Manda

Lasaro P. Salvacion

Enrico R. Corvera

Theresa Audrey Esteban

Narensh Nair

The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views

or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for anyconsequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Page 2: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 2/10

.Project Proponent: Department of Environment and National Resources,

Philippines

Project Title: Establishment of the Philippines Centre on Climate

Change (PCCC)

Project Objectives

General Objective: To institutionalize and establish the PKCCC

Specific Objective: 1.To formulate organizational standard management for

2.To identify mission statement/vision/goals of PCCC

3.To identify local , regional, and international institutional

and donor agency

4. To establish networkin mechanisms in order to broaden 

the base for sharing information capacity building and

identify technology gaps for further R & D

5. To establish link with NAHRIM and the Philippines

knowled e centre on Climate Chan e 

6. To institutionalize PCCC throughPresidential/Legislation action

Page 3: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 3/10

Project Partners: -State Universities and College

-Philippines Atmospheric, Geophysical and Astronomical

Services Administrative-National mapping and resource information authority

-National Hydraulic Research Centre

-  

-Bureau of Fisheries and Aquatic Resources

-Department of Science and Technology

-Department of Education

-NAHRIM

-ADB

Project Activities: 1.) Scoping study to identify key players and framework of the

pro ec

2.) Consultative meetings and workshops

3.) Signing of Memorandum of Agreement (MoA) for the

partners agencies

4.) Drafting of framework plan for PCCC institutionalization

5.) Issuance of Presidential/Legislative action through Republic

act/Presidential Executive order

.

government of the Philippine counterpart

7.) Development/Establishment of PCCC

8.) Man power recruitment and installation of facilities

Page 4: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 4/10

Regional

Knowledge

Center onNARBO

 

ClimateChange

NAHRIM KHubPhilippine

KnowledgeCenter on

Regional

Knowledge

Climate

Change

Center on

Climate

Change

ADB Team

Regional

Knowledge

Center on

ClimateChange

oca

KC

on CC

Local

Local

KC

KCon CC LocalKC

on CC

on

Page 5: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 5/10

Project Outputs: 1. Signed MoA2. Framework Plan

3. Presidential Executive Order or Republic Act

-

.

5. Establishment and Operationalization of PCCC

including the setting up of facilities and man powerrequirement

Project Indicative

Budget:

Grand Total = USD 10 million (2 Years)

CY 2009 = USD 100,000-= ,

Page 6: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 6/10

roposa o.Project Proponent: Department of Environment and Natural Resources

(DENR)

Project Title: Capacity Building for Agusan River Basin Organization

(ARBO)

Pro ect Ob ectives 1. To identif ke la ers in the Basin

2. To equip local government units (LGUs) and RBOs

knowledge regarding climate change

3. To identify roles and functions of LGUs and RBOs

Project Partners: 1) ADB

2) NAHRIM

4) LGUs

5) Academe

6) NGO

7) Local Communities

Page 7: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 7/10

a n ro ec c v es: onsu a on an en ca on o ey p ayers n

the ARB

2) Conduct Training Needs Assessment

3) Conduct seminar, trainin /worksho s for

LGUs/RBOs and community on climate change

4) Determine role and function of LGUs5) Determine role and function of ARBO

Main Project Outputs: 1. Technical Capability of the RBO and Secretariat

which will enhance awareness/capacities of LGUs and

2. Institutional setup for RBO established with delineated

functions/responsibilities

Project Indicative Grand Total = USD 200,000 (2 years)Budget: CY 2009 = USD 100,000

CY 2010 = USD 100,000

Page 8: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 8/10

roposa o.Project

Proponent:

Laguna Lake Development Authority (LLDA)

Project Title: Design and Develop Hydrologic Monitoring System (Network)

Project

Objectives

1. Physical Installation of Hydrologic Devices in strategic areas

around the lake

2. To develop a Decision Support System (DSS) for well

informed decision

Project -National Hydraulic Research Centrear ners: - n vers y o e pp nes

-Japan Water Agency

-NAHRIM

 Activities:

. , ,2. Awareness raising/Capacity Building of concerned staff 

Page 9: CCA Proposal Group6

8/6/2019 CCA Proposal Group6

http://slidepdf.com/reader/full/cca-proposal-group6 9/10

a n ro ec u pu s: . c en c a a or me y ec s on ma ng process

for climate change mitigation and adaptation

2. Telemetric/Hydrologic Model to simulate

h drolo ic/h dro- eolo ic and climate chan e

related information

3. Enhanced technical capacities4. Monitoring Network established

Project Indicative Budget: Grand Total = USD 2.5 million (2 Years)

CY 2009 = USD 1 million

CY 2010 = USD 1.5 million