CCA Proposal Group1

13
CC Pro ection Pro osals Group 1 The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.  consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Transcript of CCA Proposal Group1

Page 1: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 1/13

CC Pro ection Pro osals

Group 1

The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views

or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.

 

consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Page 2: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 2/13

Proposal No. 1 (General) Project Proponent : Regional Proposal (Group 1)

Pro ect Title : Conduct case studies and build

capacity for downscaling climate projectionsacross the Asian region

Project Objectives

1. To provide CC Projection data to priority

2. To build capacity within the region to

Project Partners : NAHRIM as hub, ADB, JICA,Team Japan, etc

Page 3: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 3/13

 

1. Downscaling of GCMs to priority RB

. ec no ogy rans er o e reg ons

3. International Workshop on Climate

Main Project Outputs

.

2. Increase capacity for region to undertakeon downscalin exercises 

3. Expert panel for climate modelling in theregion

Indicative budget : ??

Page 4: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 4/13

Proposal 2   ,

Project Title : Downscaling For Water Resources Management inthe Lower Mekong river Basin (Vietnam, Cambodia)

1. To improve knowledge on flood / drought monitoring

2. River basin management

Project Partners : NAHRIM / USA / MRC

Main Project Activities.

2. Data collection / sharing

3. Technology transfer (Downscaling)

4. Collaboration with (NAHRIM, ICHAM)

Main Project Outputs

.for Mekong River Basin

Indicative budget

Page 5: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 5/13

Proposal 3

• Project proponent: ICIMOD• Pro ect title: Assessin the im acts of climate

change on the hydrological regime of river

basins in the HKH region: a tool to support

• Objective: to build better understanding on theimpacts of projected climate change on the

hydrological regime of the river basins in theHKH region to support adaptation and

Page 6: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 6/13

Proposal (cont.)• Main activities:

1. Assess the contributions of snow and glacier melt to the runoff of the 10 major riverbasins

2. opt on o su ta e c mate c ange scenar os or t e reg on

3. Assess the impacts of CC on the snow and glacier dynamics and resulting variation inthe melt water generation (catchment scales)

4. Assess the impacts of CC on the hydrology of the river basins-. -

demands for water

6. Assess changes in the water availability and resulting socio-economic impacts

7. Develop a strategic framework for impact adaptation and mitigation

•  climate change on the hydrological regime of the river basins in theHKH region to support adaptation to CC

• Indicative budget: USD 450,000 (3 years)

Page 7: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 7/13

  Project Proponent: State Planning Unit,

arawa Project Title: IRBM – Sungai Sarawak 

River Basin

Pro ect ob ectives

Downscaling of climate change projections in

Sarawak river basin

Project Partner; JICA, ADB, NAHRIM

in Sungai Sarawak River Basin

Page 8: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 8/13

Proposal 5Project Proponent: ADB Uzbekistan Resident Mission

Project Title: Improved Capacity for Climate Change Projection in the Syr, ,

Uzbekistan)Project Objectives:

. -Meteorological Centers (Hydromets) for preparing accurateshort-term projections for water resources availability in the SyrDarya River Basin

2. Improve the knowledge base of Hydromets to downscale GCMsimulations of climate change to the Syr Darya basin level to

develop longer-term climate change projections and assess

their impact on water resourcesProject Partners: NAHRIM, Team Japan, Scientific-Information Center of

the Interstate Commission for Water Coordination in Central Asia

Implementing Agency: National Hyrdomets

Page 9: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 9/13

a n ro ec c v es:

1. Inventor of monitorin stations in the basin /their status

2. Assessment of existing databases at national level in termsof land and hydro-meteorological data (soil data, land use,

, , ,

evaporation, stream flow/river cross-section data, waterreservoirs, hydraulic structures) / recommendations forimprovement

3. Assessment of institutional arrangements for data exchange

between Hydromets (accuracy, compatibility, timing) / 

Page 10: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 10/13

a n ro ec c v es:

4. Assessment of methodologies for preparing short-term andlon -term ro ections for water resources availabilit andtheir use in the decision-making process / recommendationsfor improvement

.

training on downscaling methodologies and techniques

6. Downscaling of GCM climate change projections to theSyrdarya basin (longer-term perspective)

7. Assessment of Climate Change impact on (i) water

(iii) national economies (preparation of brief report forinformation of decision-makers in all riparian states)

Page 11: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 11/13

 

1. Hydromet institutional and technical capacity for Climate Changero ections im roved

2. Climate Change projection data is used in decision-makingregarding water allocation among the riparian states taking into

3. Tension between the riparian states over water allocation reduced

Indicative budget: $0.8 million

(needs detailed consultation with Hydromets)

Implementation Period: 3 years

Page 12: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 12/13

Proposal 6  

Project Title : Downscaling projections for Ganges-Brahmaputra-Meghud

1. flood, weather and cyclone forecast

2. extent of saline intrusion

Project Partners : ADB, JICA, WB

Main Project Activities

 

Data sharing

Main Project Outputs

1. Effects of CC projections to assist in predicting effectsof CC

Measures to be taken for adaptation and partnership

Indicative budget

Page 13: CCA Proposal Group1

8/6/2019 CCA Proposal Group1

http://slidepdf.com/reader/full/cca-proposal-group1 13/13