Calculos Ripios Jose M
-
Upload
ramon-bartolozzi -
Category
Documents
-
view
17 -
download
0
Transcript of Calculos Ripios Jose M
“For External Distribution. © 2004 Halliburton. All Rights Reserved.”
CALCULO DE RIPIOS Y PERDIDAS POR HUMECTRACION
HALLIBURTON
“For External Distribution. © 2004 Halliburton. All Rights Reserved.”
NOMECLATURA DE LOS INSTRUMENTOS UTILIZADOS PARA EL CALCULO DEL %
V/V Y P/P
CILINDRO GRADUADO
CONDENSADORCUERPO DE LA RETORTA
LANA DE ACERO
TAPA
ENVASE DE LA RETORTA
OJO LECTORTORNILLO DE GRADUACIONPESAS DE 500 gr.
PESAS DE 10 gr.
PESAS DE 100 gr.PLATO
PESAS DE 1000 gr. C/U
HALLIBURTON
“For External Distribution. © 2004 Halliburton. All Rights Reserved.”
CALCULOS PARA DETERMINAR EL % DE HUMECTACION EN V/V Y P/P
LEYENDA
SV = PESO SHAMBER VACIO.
SM = PESO SHAMBER CON MUESTRA.
SMS = PESO SHAMBER CON MUESTRA SECA.
CV = PESO CILINDRO VACIO.
CM = PESO CILINDRO CON MUESTRA.
VA = VOLUMEN DE AGUA EN CC /ml
PMH = PESO DE LA MUESTRA HUMEDA EN gr.
PRS = PESO DE LOS RIPIOS SECOS EN gr.
PMA = PESO DE LA MASA DE ACEITE
PMA = CM – (CV+ VA)
+/- 0.05
FORMULAS
PMH= SM - SV
PRS = SMS - SV
BALANCE DE MASA
% P/P = PMA
PMH
PRS + PMA + VA
PMH=
X 100
HALLIBURTON
“For External Distribution. © 2004 Halliburton. All Rights Reserved.”
PASOS PARA DETERMINAR EL % DE HUMECTACION EN V/V Y P/P
PESO DEL SHAMBER VACIO (
SV)
PESO DEL SHAMBER CON
MUESTRA ( SM)
PESO DEL CILINDRO VACIO
( CV)
1 2
3
238.7 gr 256.9 gr
PMH = SM - SV
PMH = 256.9 – 238.7
PMH = 18.2 gr
31.0 gr
HALLIBURTON
“For External Distribution. © 2004 Halliburton. All Rights Reserved.”
PASOS PARA DETERMINAR EL % DE HUMECTACION EN V/V Y P/P
PESO DEL CILINDRO CON
MUESTRA ( CM)
5
EN EL 5 PASO SE TIENE LA
LECTURA EN % V/V DEL O DE
LOS LIQUIDOS PRESENTE
33.4 gr
PMA = CM – (CV+ VA)PMA = 33.4 gr –(31.0 gr+ O gr)PMA = 2.4 gr
PESO DEL SHAMBER CON
MUESTRA SECA ( SMS)
4 254.2 gr
PRS = SMS - SVPRS = 254.2 gr – 238.7 grPRS = 15.5 gr
PMA
PMH% P/P = X 100
% P/P = 2.4 gr
18.2 grX 100
% P/P = 13.18 %HALLIBURTON
“For External Distribution. © 2004 Halliburton. All Rights Reserved.”
CALCULO DE RIPIOS POR FASE
LEYENDA
RP = RIPIOS PERFORADOS.
D = DIAMETRO DEL HOYO .
PH = PERDIDAS POR HUMECTACION.
% V/V = % DE HUMECTACION.
Fe = FACTOR DE ENSANCHAMIENTO.
RT = RIPIOS TOTALES.
FT = PIES PERFORADOS
X FeRP =
PH =% V/V
RP X 100%
D X F t
1029.5
RT = PH
RP +
M = RT / 6.28
M = RT X 0.159
3
3
2
“For External Distribution. © 2004 Halliburton. All Rights Reserved.”
CALCULO DE RIPIOS POR FASE D X F t
1029.5
CEMENTO
0’
1.000’
7.006’
14.870’
14.976’
14.147’
16.626’
17.364’ PT
O = 26”
X FeRP =
PH =% V/V
RP X
100%
2
RT = PH
RP +
M = RT / 6.28
M = RT X 0.159
3
3
O = 17 1/2”
O = 12 1/4”
166 M3
430 M3
303 M3
Fe = 1.12
Fe =1.12
Fe =1.5
O = 8 1/2”
O = 8 1/2”
Fe =1.8
Fe =1.8
% V/V =42
% V/V = 35
% V/V = 11
% V/V =9
% V/V =10
55 M3
38 M3
1.0
00’
6.0
06’
7.8
64’
1650’
“For External Distribution. © 2004 Halliburton. All Rights Reserved.”
CALCULO DE RIPIOS DESCARTADOS POR EQUIPOS
RD = RIPIOS DESCARTADOS.
T = TIEMPO DE LLENADO DE ¼ DE GALON
H = HORAS DE DESCARTE O DE TRABAJO.
21.48 = CONSTANTE.
FORMULAS
RD = 21.48 / T X H