CAD • CIM • GIS • Assets CTDOT Closing the Gap · CTDOT Closing the Gap CAD • CIM • GIS...
Transcript of CAD • CIM • GIS • Assets CTDOT Closing the Gap · CTDOT Closing the Gap CAD • CIM • GIS...
10/3/2017
1
CTDOT Closing the GapCAD • CIM • GIS • Assets
September 2017AEC APPLICATIONS
AEC APPLICATIONS
Asset Gap Working Groups
1. Digital Strategy for Field Capture
2. Maintenance Business Process Framework
3. Data Architecture
4. CAD for Data Extraction
Data Gap Analysis Workshops2015/2016
PLAN → COLLECT → MAINTAIN
Updates to Inventory
1. Engineering/Capital Projects
2. Maintenance Crews
3. New Major Traffic Generators
10/3/2017
2
AEC APPLICATIONS
ASSET
MANAGEMENT
CADQUANTITIES
Legacy Moving ForwardDisconnected Systems Interconnected System
CONTRACT DEVELOPMENT
& CONSTRUCTION
ASSET
MANAGEMENT CAD
QUANTITIES
CONTRACT DEVELOPMENT
& CONSTRUCTION
Systems Relations
AEC APPLICATIONS
1. Extract geospatial CAD data into EXOR/GIS
system
• Design Data is tagged in as PENDING
• Project is build, Data is modified to
INSTALLED
2. Data can be pushed back into a DGN file
Planning PhaseOverview CAD to Asset Prototype
10/3/2017
3
Planning PhaseOverview CAD to Asset Prototype
AEC APPLICATIONS
What are we asking our designers to in addition to their
normal CAD workflow?Populate asset information on proposed elements in their Design Files.
Which Asset should we start with?� Guiderail, Signs, Drainage or Illumination
� Consider only assets that had well defined metadata standards
What should be in the Data Model?� Each Asset has a Steward/SME
� Additional attribution to help Design
Which CAD Software would be most efficient?
Planning PhaseSign Data Model
AEC APPLICATIONS
LAT_LONG
JOB_ID
JOB_TYPE
JOB_ASSSEMBLY_NUMBER
POSITION
ROUTE_ID
ROUTE_DIRECTION
RAMP_NUMBER
Location CATALOG_NUMBER
PANEL_STATUS
MUTCD_CODE
ACTUAL_LEGEND
BACKGROUND_COLOR
LEGEND_COLOR
HEIGHT
WIDTH
AREA
MATERIAL
PANEL_THICKNESS
SHEETING_TYPE
PANEL_IMAGE_NAME
FABRICATION_DATE
FABRICATIOR
DATE_INSTALLED
MANUFACTURER_INFO
Sign Panel
MOUNTING_TYPE
SIGN_FOR_TRAFFIC_SIGNAL
ASSEMBLY_STATUS
NUMBER_OF_POSTS
ASSEMBLY_IMAGE_NAME
Sign Support
SIGN_SUPPORT_ITEM_NUMBER
SIGN_SUPPORT_ITEM_DESCRIPTION
SIGN_SUPPORT_COST
SIGN_FOUNDATION_ITEM_NUMBER
SIGN_FOUNDATION_ITEM_DESCRIPTION
SIGN_FOUNDATION_COUNT
SIGN_FOUNDATION_UNIT_PRICE
SIGN_FOUNDATION_COST
PANEL_ITEM_NUMBER
PANEL_ITEM_DESCRIPTION
PANEL_UNIT_PRICE
PANEL_COST
Additional Data Items added
to help the designers
calculate quantities
10/3/2017
4
Planning PhaseMicroStation Version Selection
AEC APPLICATIONS
V 8 i
EC Attributer
C O N N E C T
Item Types Plus
Ability to Attach Asset Data to Elements (Points, Cells, Lines, Polygons)
Yes Yes
Development Time Investment Small Large
User Learning Curve Small Large
Plan Production Time Increased Improved
Quantity & Cost Reporting Clunky(XML Output Using Style Sheets)
Simple(Direct to Excel)
Asset/ GIS Exportability Clunky(XML Output Using Style Sheets)
Simple(Direct to CSV)
Sustainability Short Term (May not Integrate with CONNECT)
Long Term
AEC APPLICATIONS
Planning PhaseRequired Software
MicroStationCONNECT Edition
Item Types DGNLIBNon-graphical properties attached to
MicroStation elements.
Item Types Plus (Custom Addin)
Excel Files
o Lookup Tables
o Calculations
o Pick Lists
Reports DGNLIBConsistent reports & exported data
GuideSIGN PlusTRANSOFT SOLUTIONS
Customizable Cells
Compatible w/ MS CONNECT
Edition
Supports use of Item Types
Superb Placement and Editing
tools
10/3/2017
5
CTDOT Customization
AEC APPLICATIONS
Behind the Scenes
Panel Data Attached to
Signal Ahead Sign
Panel Data Attached to
Sub-plate Sign
Workflow
AEC APPLICATIONS
Step 1 – Place Sign
Select Support Type Select Panel
Position and add
additional PanelsPlace in Design File
10/3/2017
6
AEC APPLICATIONS
PICK LIST
PICK LIST
PICK LIST
AUTO-FILL
AUTO-FILL
This will be integrated as part of a future release
of MicroStation CONNECT
Look up Tables ~ Calculations ~ Pick Lists
WorkflowStep 2 – Assign Item Types to
Assembly
AEC APPLICATIONS
Typical Report Columns• Item Types
Sign Panel
Sign Supports
• CellsX,Y
• File PropertiesProject Number
4 Reports in DGNLIB, pushed out for general use• 2 for Assets
• 2 for Estimating
Step 3 – Run ReportsWorkflow
10/3/2017
7
AEC APPLICATIONS
Step 4 Review Reports for
Asset Export
POST
SIGN FACES
Workflow
AEC APPLICATIONS
Large Signs
Supports CostsPay Items needed for
Support Structure and
Foundations
Panel Costs
Step 5 Review Reports for
Quantity Estimate
Workflow
10/3/2017
8
ASSET
MANAGEMENT
WorkflowStep 6 Export Data
AEC APPLICATIONS
ASSET
MANAGEMENT
CONTRACT
DEVELOPMENT &
CONSTRUCTION
Nightly
Automated
Update
Amazon Web
Services
Shape File
CAD FileCSV
Export
EXOR
Importing Asset Data to CAD
AEC APPLICATIONS
Nightly
Automated
Update
CAD File
EXOR EXOR
Forms
Or
Spatial
Manager
10/3/2017
9
Using MicroStation CONNECT
1. Reference the Asset(s) shapefile/s
2. Zoom to your area of interest & clip to a boundary
3. Merge reference file in to the master file
AEC APPLICATIONS
Importing Asset Data to CAD
ProjectWiseProjectWise
SQL Server
InspectTech
SQL ServerBentley
Cloud
Maps
WFS/WMS Services
AssetWise Dashboard
and Reporting Service
AssetWise ALIM
Publishing
CT DOT
Cloud
CT DOT
Hosted
CTDOT Business
SQL ServerComposite Project DB
InspectTech Bridge DB
Traffic Signal DB
Atlas
Database
SQL ServerPolygon locations
Project Authoritative Databases
Data Architecture
TED
Database
SQL Server
Obligation PlanSchedules
Scope
COREFinancials
SiteManagerConstruction Info
AssetWise
ALIM
Web Service joining Data w/
Spatial Location
Pro
jec
t/A
ss
et
Att
rib
uti
on
AEC APPLICATIONS
EXOR ESRISpatially Based Data
ProjectWise Explorer
10/3/2017
10
Assets/CIMCivil Integrated Management
AEC APPLICATIONS
Enables a fully digital workflow
Project inception → Asset Management
Driving Forces:
• TED (Transportation Enterprise Data)
Coordinated effort to establish data governance & stewardship
• Better and Faster Asset/Safety Data Management through
Integration
• Beneficiaries
AEC Applications Planning IT
Asset Management Safety
Asset Management Group (TAMP) Engineering
Network Safety Analysis (RDIP) Maintenance Operations
CIMCivil Integrated Management
AEC APPLICATIONS
• Authoritative Data– Asset Management Systems
– Composite Project Data
• ATLAS (Asset/Project Tracking + Location) = GIS– Tools Required
• Proposed Project Location
• Asset Location
• Points, Lines, Polygons & Extracted LRS Registration
• Project/Asset Data joined with Location
• Each Asset has a Steward/SME and an Authoritative Management
System – Geospatial Metadata Guidelines are being developed
10/3/2017
11
Spatially Based Data - ATLAS/ESRI• Projects Work Areas
Facilities
OSTA Permits
• Assets
Bridge Deck Areas
Traffic Signal Areas
• Ortho-imagery
• Hydraulics
• Soil Borings
• ROW
Town, County, Regional Boundaries
LRS Based Data - EXOR• Road Network
• Projects:
• Capital
• Maintenance VIP
• Assets:
• Signs
• Bridges
• Pavements
• Traffic Monitoring:
• AADT
• Accidents
AEC APPLICATIONS
CTDOT GIS Data
CTDOT – TED
Transportation Enterprise Data
AEC APPLICATIONS
PlanningPreliminary Design → Final Design
30% 60% 90%
ConstructionChange Orders → As-built
Contract
Processing
Project Timeline
Locating and Tracking Capital Projects
Benefits for Designer:
Access to Underlying Road Network Sections and their characteristics
• Route/Road ID
• Start & End Mile Points
• ADT
• Functional Class
• Town/Region
Decommission and add Asset Inventories
Update Work Area Limit Polygon as Design progresses, Identify Effected Major and Minor Assets
CAD - Add Proposed Asset Inventories
10/3/2017
12
AEC APPLICATIONS
Locating and Tracking Capital Projects
Atlas
• Road Network user Interface
• Identify Project Polygon
• Extract Road Network Assets
AEC APPLICATIONS
Elaine [email protected]
860-594-3278
William Pratt, [email protected]
860-594-3320