AUBURN BOSTON PORTLAND PORTSMOUTH YORK MIDDLE … · 2019-03-08 · AUBURN BOSTON PORTLAND...

5
AUBURN PORTLAND PORTSMOUTH BOSTON Key Plan Harriman Project No. PA / PE: Drawn By: Harriman Associates c Revision Description Rev Date MARCH 6, 2019 MARCH 6, 2019 YORK, MAINE 18427 G00.1 DRE DRE COVER SHEET 2019 YORK MIDDLE SCHOOL FLOORING REPLACEMENT YORK, MAINE YORK MIDDLE SCHOOL FLOORING REPLACEMENT G00.1 COVER SHEET ARCHITECTURAL DRAWINGS A10.1 FIRST FLOOR PLAN A10.2 SECOND FLOOR PLAN A10.3 THIRD FLOOR PLAN A82.1 FLOORING DETAILS CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS LIST OF DRAWINGS

Transcript of AUBURN BOSTON PORTLAND PORTSMOUTH YORK MIDDLE … · 2019-03-08 · AUBURN BOSTON PORTLAND...

Page 1: AUBURN BOSTON PORTLAND PORTSMOUTH YORK MIDDLE … · 2019-03-08 · AUBURN BOSTON PORTLAND PORTSMOUTH Graphic Scale Graphic Scale Graphic Scale Graphic Scale Graphic Scale Key Plan

Graphic Scale

AUBURN PORTLAND PORTSMOUTHBOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Revision DescriptionRev Date

MARCH 6, 2019

MARCH 6, 2019

YORK, MAINE

18427

G00.1

DRE

DRE

COVER SHEET

2019

YORK MIDDLE SCHOOLFLOORING REPLACEMENT

YORK, MAINE

YORK MIDDLE SCHOOLFLOORING REPLACEMENT

G00.1 COVER SHEET

ARCHITECTURAL DRAWINGS

A10.1 FIRST FLOOR PLAN

A10.2 SECOND FLOOR PLAN

A10.3 THIRD FLOOR PLAN

A82.1 FLOORING DETAILS

CONSTRUCTION DOCUMENTS

CONSTRUCTION DOCUMENTS

LIST OF DRAWINGS

Page 2: AUBURN BOSTON PORTLAND PORTSMOUTH YORK MIDDLE … · 2019-03-08 · AUBURN BOSTON PORTLAND PORTSMOUTH Graphic Scale Graphic Scale Graphic Scale Graphic Scale Graphic Scale Key Plan

BOYS

0210

HOMEECONOMICS

LAB

0220

TEAMROOM

0223

LOWERCAFETERIA

0224

KITCHEN

0235

STOR

0222

STOR

0221

KITCHENSTORAGE

0242

OFFICE

0239

TOILET

0238

SNACKS

0237

COOLER

0240

FREEZER

0241

ENTRY

0271

STORAGE

0203

STAIR3

0270

CORRIDOR

0206

OFFICE

0035

STOR

0209JANITOR

0207

TEACHERS'

DININGROOM

0226

MUSICSTORAGE

0076

MUSIC

0075

MUSIC

0077

MUSIC

0072

STOR

0073

JAN.

0069

STORAGE

0051

CORRIDOR

0074

STAIR

0070

CORRIDOR

0037

CORRIDOR

0201

BREAKROOM

0243

SERVERY

0236

UPPERCAFETERIA

0227

CORRIDOR

0225

TOILET

0034

CLOSET

0061

VESTIBULE

0078

VESTIBULE

0049

STORAGE

0071

SPECIALED.

STORAGE

0064

JANITOR0066

GYMEQUIPMENT

0065

VESTIBULE

0053

STORAGE

0052

CORRIDOR

0068

STOR

0059

STOR

0058

EDUCATIONALMATERIAL

STOR.

0057

TECHNOLOGY

0060

MUSICSTORAGE

0062

MUSICSTORAGE

0063

STAIR

0050

CORRIDOR

0067

STORAGE

0056

STORAGE

0054

VESTIBULE

0055

JANITOR'SCLOSET

0037A

TOILET

0212

CLASSROOM

0116

ARTCLASSROOM

0127

STOR

0128

ART

0133

P.E.STORAGE

0205

GIRLS

0211

P.E.CLASSROOM

0204

STOR

0114

STOR

0131

SELF-CONTAINEDCLASSROOM

0202

STAIR

0030

VESTIBULE

0111

CORRIDOR

0121

SELF-CONTAINEDCLASSROOM

0032

TEACHERS'TOILET

0119

MAINTENANCE

0012

DRAMACLASSROOM

0031

CORRIDOR

0036

STOR.

0134

MACHINEROOM

0129

STORAGE

0118

STOR

0113

STAIR1

0250

ELEVATOR

0135

CORRIDOR

0011A

STAIR

0036A

SPRINKLER

0016

BOILERROOM

0015

CORRIDOR

0011

ELECTRIC

0013

STAIR

0010

STORAGE

0018

BOILERROOM

0022

STOR

0023

IDF

0024

INDUSTRIALTECHNOLOGY

0115

INDUSTRIALTECHNOLOGY

0112

CERAMICS

0130

KILN

0132

STOR

0126

STOR

0125

CORRIDOR

0120

CORRIDOR

0123

LIGHTWELL

ARTCLASSROOM

0124

STOR

0117

CERAMIC TILE FLOORING(DOES NOT INDICATE DIRECTION OF TILE)APPROX. 7,868 SF SHOWN THIS LEVEL

RUBBER TILE FLOORING, TREADS, AND RISERS(DOES NOT INDICATE DIRECTION OF TILE)APPROX. 1,056 SHOWN THIS LEVEL

GENERAL NOTES:

1. REMOVE EXISTING VCT IN AREAS NOTED TO RECEIVE NEW FLOORING.REMOVE EXISTING STAIR TREADS AND RISERS AT AREAS NOTED TO RECEIVENEW STAIR TREADS AND RISERS. PROVIDE MINOR FLOOR PREPARATION AS REQUIRED AT REMOVALS.

2. COORDINATE NEW CERAMIC TILE COLOR WITH EXISTING TILE INSTALLEDIN LOWER CAFETERIA.

3. VCT STAIR TREADS AND RISERS TO MATCH EXISTING COLOR. RUBBER TILE FLOORING TO MATCH EXISTING COLOR.

3. BASE AT CERAMIC FLOORING TO BE FROM 12" X 12" CERAMIC TILE CUT IN HALF. BASE AT RUBBER FLOORING AND AT CURVED WALLS TO BE 6" VINYL BASE. BASE COLOR OF CERAMIC AND VINYL BASE TO MATCH EXISTING RESILIENT BASE COLOR.

4. TILE TO BE INSTALLED IN THE SAME PATTERNS AND DIRECTIONS AS EXISTING TILE, INCLUDING THE COMPASS ROSE AT THE MAIN ENTRANCE.

5. GROUT TO MATCH EXISTING GRAY GROUT COLOR IN LOWER CAFETERIA.

6. CUT TILE TO FIT AROUND FLOOR OBSTRUCTIONS SUCH AS LEGS OF RADIATOR, PIPES.

7. MOISTURE TESTING AND ANY REQUIRED MITIGATION BY OTHERS.

8. SEALING/ WAXING OF FLOORING NOT INCLUDED.

9. TRANSITION STRIPS BETWEEN CERAMIC TILE AND ADJACENT EXISTING VC TILE TO BE SCHLUTER RENO-RAMP - SEE DETAIL C4/A82.1 (LOCATIONS NOT NOTED ON PLAN).

RUBBER TILE/ C. TILETRANSITION STRIP

RUBBER TILE/ C. TILETRANSITION STRIP

RESILIENT BASE ATCURVED WALLS, TYP

Graphic Scale

AUBURN PORTLAND PORTSMOUTHBOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Plo

t D

ate

:

Revision DescriptionRev Date

MARCH 6, 2019

3/6

/20

19

10

:53:2

2 A

M

YORK, MAINE

18427

A10.1

DRE

DRE

FIRST FLOOR PLAN

2019

YORK MIDDLE SCHOOLFLOORING REPLACEMENT

SCALE: 1" = 5/64"

FIRST FLOOR PLANA1

CONSTRUCTION DOCUMENTS

NOT TO SCALE

Page 3: AUBURN BOSTON PORTLAND PORTSMOUTH YORK MIDDLE … · 2019-03-08 · AUBURN BOSTON PORTLAND PORTSMOUTH Graphic Scale Graphic Scale Graphic Scale Graphic Scale Graphic Scale Key Plan

CORRIDOR1201

GIRLS1211

JANITOR1209

STORAGE1206

P.E.OFFICE

1205

TEACHERMAIL1202

OFFICEEQUIP.

1038

ASST.PRINCIPAL

1024

PRINCIPAL1025

CONF.ROOM1027 WAITING

1037

SCHOOLOFFICE

1029

TOILET1207

TOILET1007

P.E.OFFICE

1208

HEALTHCLASSROOM

1023

NURSE1006

NURSE'SOFFICE

1004

CLOSET1005

BOYSROOM1021

GIRLSROOM1022

CORRIDOR1011

CORRIDOR1012

STORAGE1028

CORRIDOR1036

6THGRADE

CLASSROOM1108

6THGRADE

SCIENCECLASSROOM

1134

RESOURCE1125

STAIR1

1250

SMALLGROUPROOM1120

TEACHERS'WORKROOM1105

GUIDANCE1106

SMALLGROUPROOM

1130

STORAGE1121

CORRIDOR1129

CORRIDOR1131

JANITORCLOSET

1133

CORRIDOR1103

CORRIDOR1132

CORRIDOR1102

CORRIDOR1101

6THGRADE

CLASSROOM1109

6THGRADE

CLASSROOM1107

6THGRADE

SCIENCECLASSROOM

1122

6THGRADE

CLASSROOM

1123

6THGRADE

CLASSROOM

1124

6THGRADE

CLASSROOM1128

6THGRADE

CLASSROOM1127

COMPOSITE1016

SPEECH1015

SPEECH1014

CONFERENCE1013

COMPOSITE1020

SPECIALEDUCATION

1018

VESTIBULE1017

CLOSET1018A

STAIR1010

TOILET1009

CORRIDOR1008

STAIR1030

STOR.1042

LIGHTWELL

LANDING1035

STORAGE1126 ELEVATOR

1135

VESTIBULE1110

CLOSET1020AVESTIBULE

1017A

CLOSET1023A

CORRIDOR1213

ENTRY1034

STORAGE1009a

GUIDANCESECRETARY

1106a

HALL1026

STAIR

1070

COMPUTER

CLASSROOM

1224

COMPUTER

CLASSROOM

1223

BOYS

1210

BOYS'LOCKERROOM1203

GIRLS'

LOCKERROOM

1204

OFFICE

1220

SERVER

1221

GIRLS

1040

BOYS

1039

STAGE

1060

GYMOFFICE

1052

VESTIBULE

1051

CORRIDOR

1225

RESOURCE

1228

SMALL

GROUPROOM1240

STAIR3

1270

TOILET

1230

JAN.

1229

CORRIDOR

1241

CORRIDOR

1245

CORRIDOR

1262

CORRIDOR

1267

CORRIDOR

1268

5TH/6THGRADE

CLASSROOM

1227

5TH/6THGRADE

CLASSROOM

1242

5THGRADE

CLASSROOM1243

5THGRADE

SCIENCECLASSROOM

1244

STOR.

1246

TEACHERWORKROOM

1247

5THGRADE

CLASSROOM

1261

5THGRADE

CLASSROOM

1263

5THGRADE

CLASSROOM

1264

5THGRADE

CLASSROOM

1265

5THGRADE

CLASSROOM

1266

GYM.STORAGE

1053

STAIR

1050

GYM.STORAGE

1054

CORRIDOR

1041

SMALL

GROUPROOM

1260

STAGE

VESTIBULE

1062

STORAGE

1061A

GYM

1058

STORAGE

1056

STORAGE

1061

VESTIBULE

1212

RUBBER TILE/ C. TILETRANSITION STRIP

RUBBER TILE/ C. TILETRANSITION STRIP

RUBBER TILE/ C. TILETRANSITION STRIP

APPROXIMATE LOCATIONOF COMPASS ROSE PATTERN

CERAMIC TILE FLOORING(DOES NOT INDICATE DIRECTION OF TILE)APPROX. 7,546 SF SHOWN THIS LEVEL

RUBBER TILE FLOORING, TREADS, AND RISERS(DOES NOT INDICATE DIRECTION OF TILE)APPROX. 750 SF SHOWN THIS LEVEL

Graphic Scale

AUBURN PORTLAND PORTSMOUTHBOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Plo

t D

ate

:

Revision DescriptionRev Date

MARCH 6, 2019

3/6

/20

19

10

:53:4

7 A

M

YORK, MAINE

18427

A10.2

DRE

DRE

SECOND FLOOR PLAN

2019

YORK MIDDLE SCHOOLFLOORING REPLACEMENT

SCALE: 1" = 5/64"A1

SECOND FLOOR PLAN

ASDF

CONSTRUCTION DOCUMENTS

NOT TO SCALE

Page 4: AUBURN BOSTON PORTLAND PORTSMOUTH YORK MIDDLE … · 2019-03-08 · AUBURN BOSTON PORTLAND PORTSMOUTH Graphic Scale Graphic Scale Graphic Scale Graphic Scale Graphic Scale Key Plan

CORRIDOR

2225

RESOURCE

2228

SMALL

GROUPROOM

2260

SMALL

GROUPROOM

2240

FUTUREADULT

ED.

2224

COMPUTERCLASSROOM

2223BOYS

2210GIRLS

2211

STAIR3

2270

OFFICE

2206

STORAGE

2205

TOILET

2230

JAN.

2229

CORRIDOR

2241

CORRIDOR

2245

CORRIDOR

2262

CORRIDOR

2267

CORRIDOR

2268

HEADEND

ROOM

2204

STORAGE/OFFICE

2203

BROADCASTSTUDIO

2202

TEACHERWORKROOM

2231

CLASSROOM

2226

7TH/8THGRADE

CLASSROOM

2227

7TH/8THGRADE

CLASSROOM2242

7TH/8THGRADE

CLASSROOM2243

7TH/ 8THGRADE

SCIENCECLASSROOM

2244

STOR.

2246

STORAGE

2247

7TH/ 8THGRADE

SCIENCECLASSROOM

2261

7TH/8THGRADE

CLASSROOM

2263

7TH/8THGRADE

CLASSROOM

2264

7TH/8THGRADE

CLASSROOM

2265

7TH/8THGRADE

CLASSROOM

2266

MEZZANINE

2056

MEZZANINE

2057

CATWALK

2058

7TH/8THGRADE

CLASSROOM

2108

7TH/ 8THGRADE

SCIENCECLASSROOM

2134

RESOURCE

2125

STAIR1

2250

SMALLGROUP

ROOM

2120

TWR

2105

GUIDANCE

2106

SMALLGROUPROOM

2130

STORAGE

2121

CORRIDOR

2129

CORRIDOR

2131

2211

STOR.

2133

CORRIDOR

2103

CORRIDOR

2132

CORRIDOR

2102

CORRIDOR

2101

LIBRARY

2201

7TH/8THGRADE

CLASSROOM

2109

7TH/8THGRADE

CLASSROOM

2107

7TH/8THGRADE

CLASSROOM

2128

7TH/ 8THGRADE

SCIENCECLASSROOM

2122

7TH/8THGRADE

CLASSROOM

2123

7TH/8THGRADE

CLASSROOM

2124

7TH/8THGRADE

CLASSROOM

2127

7TH/8THGRADE

CLASSROOM

LIBRARY

READINGROOM

2040

CLASSROOM

2024CLASSROOM

2023

MUSICCLASSROOM

2019

MUSICCLASSROOM

2018

GIFTED&

TALENTED

2020

GIFTED&

TALENTED

2013

CORRIDOR

2012

CLASSROOM

2031

CORRIDOR

2011

GIRLS'TOILET

2022

BOYS'TOILET

2021

STAIR

2010

STAIR

2030

LIGHTWELL

CORRIDOR

2014

VESTIBULE

2015

VESTIBULE

2207

CORRIDOR

2036

TOILET

2017

ELEVATOR

2135

STORAGE

2016STORAGE

2025

IDF

2026

STORAGE

2126

CARPET/ C. TILETRANSITION STRIP

RUBBER TILE/ C. TILETRANSITION STRIP

RUBBER TILE/ C. TILETRANSITION STRIP

RUBBER TILE/ C. TILETRANSITION STRIP

RUBBER TILE/ C. TILETRANSITION STRIP

CERAMIC TILE FLOORING(DOES NOT INDICATE DIRECTION OF TILE)APPROX. 5,604 SF SHOWN THIS LEVEL

RUBBER TILE FLOORING, TREADS, AND RISERS(DOES NOT INDICATE DIRECTION OF TILE)APPROX. 988 SF SHOWN THIS LEVEL

Graphic Scale

AUBURN PORTLAND PORTSMOUTHBOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic ScaleGraphic Scale

Key Plan

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Proj North

Plo

t D

ate

:

Revision DescriptionRev Date

MARCH 6, 2019

3/6

/20

19

10

:55:1

8 A

M

YORK, MAINE

18427

A10.3

DRE

DRE

THIRD FLOOR PLAN

2019

YORK MIDDLE SCHOOLFLOORING REPLACEMENT

SCALE: 1" = 5/64"A1

THIRD FLOOR PLAN

CONSTRUCTION DOCUMENTS

NOT TO SCALE

Page 5: AUBURN BOSTON PORTLAND PORTSMOUTH YORK MIDDLE … · 2019-03-08 · AUBURN BOSTON PORTLAND PORTSMOUTH Graphic Scale Graphic Scale Graphic Scale Graphic Scale Graphic Scale Key Plan

CARPET

RESILIENT TRANSITION STRIP

CERAMIC TILE

TRANSITION TO ALIGN W/ CENTERLINE OF DOOR, WHERE OCCURS

METAL EDGE, SET IN GROUT

SCHEDULED CERAMIC TILE

1/2 CUT 12"CERAMIC TILE

METAL EDGE,SET IN GROUT

CUT EXG VCT FLOORING

SCHLUTER RENO-RAMPTRANSITION STRIP, 10 MM HIGH

CERAMIC TILE

TRANSITION TO ALIGN W/ CENTERLINE OF DOOR, WHERE OCCURS

RUBBER TILE FLOORING

RESILIENT TRANSITION STRIP

CERAMIC TILE

METAL EDGE, SET IN GROUT

TRANSITION TO ALIGN W/ CENTERLINE OF DOOR, WHERE OCCURS

Graphic Scale

AUBURN PORTLAND PORTSMOUTHBOSTON

Graphic Scale

Graphic ScaleGraphic Scale

Graphic Scale

0 1" 2" 3"

6" = 1'-0"

Key Plan

Harriman Project No.

PA / PE:

Drawn By:Harriman Associates

c

Plo

t D

ate

:

Revision DescriptionRev Date

MARCH 6, 2019

3/6

/20

19

10

:58:4

2 A

M

YORK, MAINE

18427

A82.1

DRE

DRE

FLOORING DETAILS

2019

YORK MIDDLE SCHOOLFLOORING REPLACEMENT

SCALE: 6" = 1'-0"B4

CERAMIC TILE - CARPET

SCALE: 6" = 1'-0"A4

COVE BASE DETAIL AT CERAMIC TILESCALE: NTS

A3COMPASS ROSE FLOOR PATTERN TO REPLICATE

SCALE: NTSB3

SAMPLE HALLWAY PATTERN TO REPLICATE

SCALE: 6" = 1'-0"C4

CERAMIC TILE - EXISTING VCT

SCALE: 6" = 1'-0"D4

CERAMIC TILE - RUBBER TILE

CONSTRUCTION DOCUMENTS