M a r c h 2 0 1 9 U p d a t e
2018 BOND PROGRAM
2018 BOND PROJECT OVERVIEW
1 High School Additions & Renovations Construction Documents
2 Walnut Springs Elementary Relocation Kick off Meeting – 3/26/19
3 Elementary School # 5 (phase 2)
4 Dripping Springs Administration Relocation (phase 2)
5 Technology Upgrades (by district)
6 Dripping Springs Middle School Renovations Kick off Meeting – 3/26/19
7 Transportation Site & Building Improvements Programming
8 Dripping Springs Elementary Renovations GMP
9 Athletic Improvements (turf/track replacements) Construction Documents
10 Rooster Springs Elementary Renovations GMP
11 Furniture (by district) Requesting Board Approval
12 Land Procurement (by district)
SCHEDULE OVERVIEW
today
2018 2019 2020 2021
sep
oct
nov
dec jan
feb
mar
apr
may
jun
jul
aug
sep
oct
nov
dec jan
feb
mar
apr
may
jun
jul
aug
sep
oct
nov
dec jan
feb
mar
apr
may
jun
jul
aug
sep
oct
nov
dec
1 HIGH SCHOOL ADDITIONS & RENOVATIONS (Construction)
2 WALNUT SPRINGS ELEMENTARY RELOCATION (Construction)
3 ELEMENTARY SCHOOL # 5 (Construction)
4 DRIPPING SPRINGS ADMINISTRATION RELOCATION (Construction)
5 TECHNOLOGY UPGRADES (BY DISTRICT)
6 DRIPPING SPRINGS MIDDLE SCHOOL RENOVATIONS (Construction) (Construction)
7 TRANSPORTATION IMPROVEMENTS (Construction)
8 DRIPPING SPRINGS ELEMENTARY RENOVATONS (Construction)
9 ATHLETIC IMPROVEMENTS (Construction) (Construction)-tbd
10 ROOSTER SPRINGS ELEMENTARY RENOVATIONS (Construction)
11 DRIPPING SPRINGS ELEMENTARY FURNITURE REPLACEMENT
12 LAND PROCUREMENT (BY DISTRICT)
PROJECT 1: HIGH SCHOOL ADDITIONS & RENOVATIONS
• Expand student capacity to 2500 total
students with additional classrooms
• Address approved assessment report
upgrades
• Courtyard building addition; including
engineering, floral design, business/
marketing, audio visual, and physics
• Add new flexible gym
• Expand ag barn
• Corgan and consultant team
continued working on Construction
Document Phase of Design
• Construction Documents - 50%
Complete
• Technology consultant and district
technology/construction teams
reviewed design progress
ACTIVITIES THIS MONTH (DSHS):
• 3/28: Construction Documents – 75%
Complete
• 4/1: Corgan and Civil Engineer continue
to work on Site Development Package for
the City of DS
• 4/9: Meet with HS Staff to review HS
Project Program
• 4/18: Construction Documents – 95%
Complete
UPCOMING EVENTS (DSHS):
Dripping Springs High School(Design Development Rendering – Final Design Work in Progress)
Dripping Springs High School – Design Development Plan - 1st Floor
DN
DN
DN
UP
UP
UP
UP
UP
UP
UP
Building Support
Business
Circulation
Classroom
Ed Support
Engineering
Floral
other
Sciences
Storage
OUTDOOR CLASSROOM
(PLATFORM. ABOVE)
AUTO/ FAB YARD
FAB LAB
ENGINEERINGCLASSROOM
ELECTRONICSLAB
ENGINEERINGCLASSROOM
FLORAL
STG.
FLORAL
AQUATICCLASS
AQUATIC LAB
AQUATICCLASS
GENERALCLASSROOM
MENS
WOMENS
BUSINESSCLASSROOM
LARGEBUSINESS
CLASSROOM
LARGEBUSINESS
CLASSROOM
BUSINESSCLASSROOM
TEACH. WORK
SECUREVESTIBULE
ELEV
CONF,
COLLABCORRIDOR
STAIR
SECURITY
SRO
BREAKOUT
BREAKOUT
BREAKOUT
BREAKOUT
ENGINEERINGSTORAGE
EXISTING DSHS
As indicated
LEVEL 1 - CTE ADDITION FLOORPLAN - DRIPPING SPRINGS HIGH SCHOOL
03/01/19
SUSAN SMITH.
Project Number: 18201.0000
This Document was produced by or under the authority of This document is incomplete and may not be used for regulatory approval, permit or construction.
PROGRAM LEGEND
DRIPPING SPRINGS HIGH SCHOOL KEY PLAN
1/16 = 1' 0"
N
N
Dripping Springs High School – Design Development Plan - 2nd Floor
UPUP
PHYSICS
PHYSICS
PHYSICS
GENERALCLASSROOM
GENERALCLASSROOM
GENERALCLASSROOM
GENERALCLASSROOM
GENERALCLASSROOM
PHYSICS
PHYSICS
PHYSICS
PR
EP
PR
EP
PR
EP
MENS
WOMENS
Audio Visual
Building Support
Circulation
Classroom
IDF
Sciences
Storage
JOURNALISM
A/VCLASSROOM
A/VCLASSROOM
PRODUCTION
AVWAREHOUSE
TV
RADIO
STG.
STG.
FAB LAB BELOW
OUTDOOR CLASSROOM
PLATFORM.
CO
LL
AB
CO
RR
IDO
R
ELEV
PROGRAM LEGEND
EXISTING DSHS
As indicated
LEVEL 2 - CTE ADDITION FLOORPLAN - DRIPPING SPRINGS HIGH SCHOOL
03/01/19
SUSAN SMITH.
Project Number: 18201.0000
This Document was produced by or under the authority of This document is incomplete and may not be used for regulatory approval, permit or construction.
DRIPPING SPRINGS HIGH SCHOOL KEY PLAN
1/16 = 1' 0"
N
N
Dripping Springs High School – Design Development Plan - Flex Gym
PROJECT 8: DRIPPING SPRINGS ELEMENTARY RENOVATIONS
• Address approved assessment report
items (HVAC central plant, plumbing,
exterior wall panels, paint, etc.)
• Replace stage curtains
• Renovate space shuttle
• Guaranteed Maximum Price (GMP)
Contract Amendment approved by Board
(3/11 Board Meeting)
• General Contractor began submittal
process for equipment with long lead
times
ACTIVITIES THIS MONTH (DSES):
• Equipment Submittal Review by DSISD
staff and consultants
• General Contractor begins ordering
equipment with long lead times
UPCOMING EVENTS (DSES):
PROJECT 9: ATHLETIC IMPROVEMENTS (Turf/Track Replacements)
• DSMS Competition Field: Replace turf
and track.
• DSHS Track Field: Replace turf and
track.
• Tiger Stadium: Replace turf (Installation
Time-frame T.B.D. based on pricing)
• Turf and Track Replacement
Construction Documents 95% complete
• District staff, Corgan, and engineering
consultant review of Construction
Documents
ACTIVITIES THIS MONTH (Athletic Improvements):
• Late March/Early April: Turf and Track
Replacement Competitive Sealed
Proposal (CSP) out to bid
• Mid/Late April: Bid proposals due
UPCOMING EVENTS (Athletic Improvements):
PROJECT 10: ROOSTER SPRINGS ELEMENTARY RENOVATIONS
• Address approved assessment report
upgrades (interior paint, front office
carpet, etc.)
• Add ventilation to art room
• Guaranteed Maximum Price (GMP)
Contract Amendment approved by Board
(3/11 Board Meeting)
ACTIVITIES THIS MONTH (RSES):
• Equipment Submittal Review by DS staff
and consultants
UPCOMING EVENTS (RSES):
PROJECT 11: FURNITURE at DRIPPING SPRINGS ELEMENTARY
• Replace regular classroom
furniture throughout campus
• Furniture selections made
• Pricing finalized
• Requesting Board approval for new
furniture order at 3/25 meeting
PROJECT 10: ACTVITIES THIS MONTH (Furniture):
2014 Bond: Approved Projects to be Completed with Remaining Funds
• Playground Re-surface WSE & Admin
Daycare: 100% Complete
• New Field House/Old Field House
Performance Flooring: Scheduled to
begin Spring 2019
• Sycamore Parking Expansion: Civil
Engineer working on Drawings and
permitting. Construction start Summer
2019.
• DSE Windows: Possibly combining with
2018 Bond project or complete separately
• DSMS Parking Lot Lighting: Combining
with 2018 Bond project
* District-wide Security Vestibule and DSHS
Security Booth/Traffic Gates are being
completed using Fund Balance.
QUESTIONS?