· 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term...

82
1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastructure to extend the frontiers of knowledge, train the next generation of researchers and enable technology development and transfer as well as knowledge interchange Output Name: Research infrastructure grants Date: 31 March 2015 1. Overview of the objective, output, measure / indicator and target to be reported on Programme # Programme 4 Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans To ensure availability of and access to internationally comparable research and innovation infrastructure in order to generate new knowledge and train new researchers Indicator title Number of research infrastructure grants awarded as per award letters Purpose of indicator To ensure the availability of appropriate infrastructure for enhancement of RDI Type of indicator Input indicator

Transcript of  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term...

Page 1:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

1

PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT

INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastructure to extend the frontiers of knowledge, train the next generation of researchers and enable technology development and transfer as well as knowledge interchange

Output Name: Research infrastructure grants

Date: 31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To ensure availability of and access to internationally comparable research and innovation infrastructure in order to generate new knowledge and train new researchers

Indicator title Number of research infrastructure grants awarded as per award letters

Purpose of indicator To ensure the availability of appropriate infrastructure for enhancement of RDI

Type of indicator

Input indicator

Page 2:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

2

competitiveness

Measure / Indicator Definition

Number of research infrastructure grants awarded as per award letters by the National Research Foundation to the research community Research infrastructure refers to the equipment that will be used to train the researchers

Measure / Indicator Formula

We use the ratio 1:5, one equipment will train 5 researchers and 1:10 for research to students access, That is, 300 researchers and 3000 students accessing the infrastructure by 31 March 2015

New Indicator Target continues from the previous year

Desired performance

Measure / Indicator Owner

Charles Mokonoto, Director: Infrastructure

Worked example To award 60 research infrastructure across the system and 20% increment is envisaged hence the number of awarded grants has increased from 50 to 60.

Page 3:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

3

Target set for current year

Annual target: 60 research infrastructure grants awarded as per award letters by 31 March 2015

Q1- no target Q2- call for proposals on awarding of research infrastructure grants issued by 30 September 20014 Q3- no target Q4- 60 research infrastructure grants awarded as per award letters by 31 March 2105

Target achieved Q1 -. Q2 – Q3 - .

Data limitations

The collection of data is done by the implementing agency and the process not in the control of the DST. However, the DST has the opportunity to interrogate the data presented to them

Reasons for variances

Page 4:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

4

between the target set and actual achieved

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Contracts with implementing agency (NRF) Quarterly and annual report from implementing agency (NRF) BAS payment form to transfer funds to implementing agencies Award letters

Collection Frequency of Source data Data is collected quarterly and annually

Archiving of Source Data Data is stored on Alfresco

Type of information to be extracted from the source data

Data on the human capital developed and a result of the equipment placement and bibliometric data such as publications, citations and patents (Human capital development is an important indicator as one of the key outputs over and above publications and citations– how many students have been trained using the equipment, and how many have graduated as a result of the new equipment).

IT Systems/ Tools used to capture extracted data

The data is presented to the DST in the form of report which are then stored and saved on Alfresco

Source Data Capturing Frequency Quarterly and Annually

Page 5:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

5

Individual(s) responsible for collecting the source data

D: Infrastructure Individual(s) responsible for filing/ archiving the collected source data

DD: Infrastructure

Individual(s) responsible for extracting the required information from the source data

D: Infrastructure Individual(s) responsible for verifying the accuracy and completeness of the extracted information

DD: Infrastructure

Individual(s) responsible for capturing the extracted information onto the IT System

D: Infrastructure Individual(s) responsible for verifying the accuracy and completeness of the captured information

DD: Infrastructure

Page 6:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

6

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco

Type of performance information to be extracted/ used

Type of an equipment, amount or grant awarded for the equipment, institution where the equipment has been placed, principal researcher, number of students.

Calculations required on extracted information Number of grants awarded

Archiving of Extracted / Recalculated Information

Reports filed and saved on Alfresco

Return Format Word documents

Reporting Frequency Quarterly and Annually

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Director: Infrastructure

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director: Infrastructure

Individual(s) responsible for archiving the extracted/ recalculated performance information

Director: Infrastructure

Individual(s) responsible for sending the information in the required return format to the ------------

Director: Infrastructure

Page 7:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

7

Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastructure to extend the frontiers of knowledge, train the next generation of researchers and enable technology development and transfer as well as knowledge interchange

Output Name: A Gigabit per second capacity broadband network providing transmission of data to all research and academic institutions

Date: 31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To ensure availability of and access to internationally-comparable research and innovation infrastructure in order to generate new knowledge and train new researchers

Indicator title Average amount of bandwidth per SANReN site per annum

Purpose of indicator To ensure sufficient amount of bandwidth per SANReN site to maximize the transmission of research data

Type of indicator

This is an impact indicator which also assesses performance such as efficiency.

Measure / Indicator Average amount Measure / Average bandwidth per site = total bandwidth across all the sites

Page 8:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

8

Definition of bandwidth per SANReN site per annum

Increased availability of broadband connectivity for Research and Development Initiatives

Indicator Formula connected/ number of sites connected

New Indicator Target continues from the previous year

Desired performance

Higher performance, as it measures also the capacity provided to the site.

Measure / Indicator Owner

Charles Mokonoto, Director: Infrastructure

Worked example N/A

Target set for current year

Annual target: 2 800 Mbps average bandwidth capacity available per SANReN site by 31 March 2015 Q1 – No target

Target achieved Q1 - Q2 – Q3 -.

Page 9:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

9

Q2 - Revised sites connectivity plan concluded by 30 September 2014 Q3 – No target Q4 - 2 800 mbps average bandwidth capacity availability per SANReN site by 31 March 2015

Data limitations

The collection of data is done by the CSIR and the process not in the control of the DST. However, the DST has the opportunity to interrogate the data presented to them in the form of presentations and analysis report.

Reasons for variances between the target set and actual achieved

To be completed as milestone reached

Page 10:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

10

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Audited reports from the CSIR (SANReN report)

Collection Frequency of Source data Data is collected Quarterly and Annually

Archiving of Source Data The CSIR audited reports are stored in Alfresco

Type of information to be extracted from the source data

Average amount of bandwidth per SANReN site extracted from the SANReN audited report.

IT Systems/ Tools used to capture extracted data

Reports are prepared in word and stored on Alfresco

Source Data Capturing Frequency Quarterly and Annually.

Individual(s) responsible for collecting the source data

-D: Infrastructure Individual(s) responsible for filing/ archiving the collected source data

DD: Cyber Infrastructure

Individual(s) responsible for extracting the required information from the source data

D: Infrastructure Individual(s) responsible for verifying the accuracy and completeness of the extracted information

DD: Cyber Infrastructure

Individual(s) responsible for capturing the

D: Infrastructure Individual(s) responsible for verifying the

DD: Cyber Infrastructure

Page 11:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

11

extracted information onto the IT System

accuracy and completeness of the captured information

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco

Type of performance information to be extracted/ used

The amount of bandwidth required per SANReN site.

Calculations required on extracted information

Amount of bandwidth required per SANReN site

Archiving of Extracted / Recalculated Information

Reports filed and saved on Alfresco

Return Format Word documents

Reporting Frequency Quarterly and Annually.

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Director: Infrastructure

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director: Infrastructure

Page 12:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

12

Individual(s) responsible for archiving the extracted/ recalculated performance information

Director: Infrastructure

Individual(s) responsible for sending the information in the required return format to the ------------

Director: Infrastructure

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

Strategy documents

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To strategically develop priority science areas in which South Africa enjoys a competitive advantage, by promoting internationally competitive research and training activities and outputs.

Indicator title Number of strategy documents approved by the DST Executive Committee

Page 13:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

13

Purpose of indicator To develop a Basic sciences development framework to strategically steer and direct the support of this component of the science system

Type of indicator

Output indicator

Measure / Indicator Definition

Number of strategy documents approved by the DST Executive Committee. These are the number of strategy documents that will have to be achieved in a given time

Measure / Indicator Formula

Summation of the strategy documents that are approved by the DST Exco

New Indicator New indicator Desired performance

Draft basic sciences development framework completed and approved by Exco

Measure / Indicator Owner

Charles Mokonoto Director:

Worked example Summation of the strategy documents that are approved by the DST Exco

Page 14:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

14

Infrastructure

Target set for current year

Annual: Draft basic sciences development framework approved by DST EXCO by 31 March 2015 Quarterly: Q1 - Process plan for the preparation of the draft framework approved by the DDG by 30 June 2014 Q2 - Stakeholder consultations on basic sciences conceptual framework completed by 30 September 2014 Q3 - Draft basic

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 15:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

15

sciences conceptual framework presented to DDG by 31 December 2014 Q4 - Draft basic sciences development framework approved by DST EXCO by 31 March 2015

Data limitations

N/A

Reasons for variances between the target set and actual achieved

To be completed when milestone is reached.

Page 16:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

16

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Project plan for the preparation of the draft basic Sciences Framework. Draft Basic Sciences development framework. EXCO document and EXCO minutes for the approval of the draft framework

Collection Frequency of Source data Quarterly

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Data available from various databases on the support to Basic Sciences. This data will be used to inform the future framework. Data necessary to develop an evidence –based on the draft framework

IT Systems/ Tools used to capture extracted data

Alfresco.

Source Data Capturing Frequency Quarterly and annually.

Individual(s) responsible for collecting the source data

DD: Basic Sciences

Individual(s) responsible for filing/ archiving the collected source data

Director: Infrastructure ownership for this activity

Individual(s) responsible for extracting the required information from the source data

DD: Basic Sciences

Individual(s) responsible for verifying the accuracy and completeness of the extracted information

Director: Infrastructure

Page 17:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

17

Individual(s) responsible for capturing the extracted information onto the IT System

DD: Basic Sciences

Individual(s) responsible for verifying the accuracy and completeness of the captured information

Director: Infrastructure

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco

Type of performance information to be extracted/ used

Draft basic sciences conceptual framework and EXCO documents on the presentation of the framework

Calculations required on extracted information

N/A.

Archiving of Extracted / Recalculated Information

Alfresco

Return Format MS Word

Reporting Frequency quarterly

Individual(s) responsible for extracting, calculating and consolidating the reported performance

DD: Basic Sciences

Individual(s) responsible for verifying the accuracy and completeness of the extracted

D: Infrastructure

Page 18:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

18

information performance information

Individual(s) responsible for archiving the extracted/ recalculated performance information

DD: Basic Sciences

Individual(s) responsible for sending the information in the required return format to the ------------

CD: Basic Sciences and Infrastructure

Page 19:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

19

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

Strategy documents

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To strategically develop priority science areas in which South Africa enjoys a competitive advantage, by promoting internationally competitive research and training activities and outputs.

Indicator title Number of strategy documents approved by the DST Executive Committee

Purpose of indicator Number of strategy documents approved by the DST Executive Committee Measures the number of strategy

Type of indicator

Output indicator

Page 20:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

20

documents that will be developed and approved by the DST Exco

Measure / Indicator Definition

Strategy documents refers to the documents that will have to be achieved in a given time

Measure / Indicator Formula

Summation of the strategy documents that are approved by the DST Exco

New Indicator Target continues from the previous year

Desired performance

A Bill to be presented in Parliament

Measure / Indicator Owner

Director: Advocacy, Policy and Institutional Collaboration

Worked example One Bill on the Protection, Promotion, Development and Management of Indigenous Knowledge Systems approved by Parliament.

Target set for current year

Annual: A bill for the protection, promotion, development and management of IKS tabled

Target achieved Actual target achieved. Q1 – Q2 – Q3 –. Q4 – YTD - :

Page 21:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

21

before parliament by 31 March 2015

Quarterly: Q1 - Publication of the Bill for the protection, promotion, development and management of IKS for public comment by 30 June 2014 Q2 - No target Q3 - Report approved on public comment on the Bill for the protection, promotion, development

Page 22:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

22

and management of IKS by 30 October 2014 Q4 - A Bill for the protection, promotion, development and management of IKS tabled before Parliament by 31 March 2015

Data limitations

Consultation and cabinet processes are long and may affect achievement of the target.

Reasons for variances between the target set and actual achieved

Page 23:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

23

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data A refined draft legislation prepared by the expert group (2 international and 2 local specialists in the field of academia and legal will constitute the expert group). Cabinet memorandum seeking approval for country wide-wide consultation Reports on consultation held

Collection Frequency of Source data Quarterly

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Draft Bill, Cabinet memo, and consultation reports

IT Systems/ Tools used to capture extracted data

The primary data is presented in form of a draft Bill, secondary data in the form of reports and policy brief are prepared and stored on Alfresco

Source Data Capturing Frequency Frequency source data is extracted and captured Quarterly and Annually.

Individual(s) responsible for collecting the source data

D: Advocacy, Policy & Institutional Collaboration

Individual(s) responsible for filing/ archiving the collected source data

DD: Institutional Collaboration

Individual(s) responsible for extracting the required information from the source data

D: Advocacy, Policy & Institutional Collaboration

Individual(s) responsible for verifying the accuracy and completeness of the extracted

DD: Institutional Collaboration

Page 24:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

24

information

Individual(s) responsible for capturing the extracted information onto the IT System

D: Advocacy, Policy & Institutional Collaboration

Individual(s) responsible for verifying the accuracy and completeness of the captured information

DD: Institutional Collaboration

Page 25:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

25

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco

Type of performance information to be extracted/ used

A Bill approved by the Minister Acceptance by stakeholders of the Bill through the consultation process.

Calculations required on extracted information

none

Archiving of Extracted / Recalculated Information

Reports filed and saved on Alfresco

Return Format Word documents

Reporting Frequency Quarterly and Annually.

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Director: Advocacy, Policy and Institutional Collaboration

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director: Advocacy, Policy and Institutional Collaboration

Individual(s) responsible for archiving the extracted/ recalculated performance information

Director: Advocacy, Policy and Institutional Collaboration

Individual(s) responsible for sending the information in the required return format to the ------------

Director: Advocacy, Policy and Institutional Collaboration

Page 26:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

26

Medium–term objectives, measure/indicator, outputs, and targets

To develop appropriate STI human capital to meet the needs of society

Output Name

Strategy documents

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To strategically develop priority science areas in which South Africa enjoys a competitive advantage, by promoting internationally competitive research and training activities and outputs.

Indicator title Number of strategy documents approved by the DST Executive Committee

Purpose of indicator Measures the number of strategy documents that will be developed and approved by the DST Exco

Type of indicator

Output indicator

Measure / Indicator Number of strategy

Measure / Indicator Formula

Summation of the strategy documents that are approved by the DST Exco

Page 27:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

27

Definition documents approved by the DST Executive Committee Strategy documents refers to the documents that will have to be achieved in a given time

New Indicator Strategy documents

Desired performance

Approved strategy and implementation plan

Measure / Indicator Owner

Director: Science Promotion.

Worked example 1 HCD strategy+ 1 Antarctic research strategy= 2 strategy documents approved by the DST Exco

Target set for current year

Annual: 1 implementation plan for the STEMI promotion and engagement strategy for the NSI approved by DST Exco by 31 March 2015

Target achieved Actual target achieved. Q1 – Q2 – Q3 –. Q4 – YTD -

Page 28:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

28

Quarterly: Q1 - No target Q2 First draft of the implementation plan developed by 30 September 2014 Q3 - First draft of the implementation plan presented to the DDG by 31 December 2014 Q4 - Implementation plan approved by EXCO by 31 March 2015

Data limitations

N/A

Reasons for variances between the target set and

To be completed as milestone reached

Page 29:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

29

actual achieved

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data EXCO document and EXCO minutes for the approval of the STEMI implementation plan for the promotion and engagement strategy for the NSI. Approved implementation plan.

Collection Frequency of Source data Quarterly and annually.

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Draft STEMI promotion and engagement strategy and Implementation Plan

IT Systems/ Tools used to capture extracted data

Reports are prepared in MS word and stored in Alfresco

Source Data Capturing Frequency Quarterly and annually

Individual(s) responsible for collecting the source data

DD. Science Promotion

Individual(s) responsible for filing/ archiving the collected source data

Director : Science Promotion

Individual(s) responsible for extracting the required information from the

DD: Science Promotion

Individual(s) responsible for verifying the accuracy and completeness of the extracted

Director : Science Promotion

Page 30:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

30

source data information

Individual(s) responsible for capturing the extracted information onto the IT System

DD: Science and Youth

Individual(s) responsible for verifying the accuracy and completeness of the captured information

Chief Director: Human Capital and Science Platforms

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco

Type of performance information to be extracted/ used

Approved STEMI implementation plan

Calculations required on extracted information

N/A.

Archiving of Extracted / Recalculated Information

Alfresco.

Return Format Microsoft word.

Reporting Frequency Quarterly.

Individual(s) responsible for extracting, calculating

DD: Science Promotion

Individual(s) responsible for verifying the accuracy

Director: Science Promotion

Page 31:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

31

and consolidating the reported performance information

and completeness of the extracted performance information

Individual(s) responsible for archiving the extracted/ recalculated performance information

DD: Science Promotion

Individual(s) responsible for sending the information in the required return format to the ------------

Director: Science Promotion

Page 32:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

32

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

Internationally accredited research articles from researchers awarded research grants through NRF-managed programmes

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To support and promote research that develops basic sciences through production of new knowledge and relevant training opportunities

Indicator title Number of Institute for Scientific Information (ISI)-accredited research articles published by NRF-funded researchers as reflected in the NRF project reports

Purpose of indicator

To measure the research outputs in the form of research articles published in internationally

Type of indicator Output

Page 33:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

33

recognised, peer- reviewed (ISI-accredited) journals by NRFfunded researchers.

Measure / Indicator Definition

Number of Institute for Scientific Information (ISI)-accredited research articles published by NRF-funded researchers as reflected in the NRF project reports. Number of Research articles produced by NRF funded researchers, published in internationally recognised, peer reviewed (ISI-

Measure / Indicator Formula

Total number of research articles published = number of NRF funded researchers + research articles.

Page 34:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

34

accredited) journals

New Indicator Continues from the previous financial year

Desired performance High – research articles published in ISI accredited research articles by NRF –funded researchers

Measure / Indicator Owner

Director: High End Skills.

Worked example 200 research articles in ISI accredited research articles published by NRF-funded researchers

Target set for current year

Annual: 5 700 ISI-accredited research articles published by NRF-funded researchers by 31 March 2015 Quarterly: Q1 - No target Q2 - No target Q3 - No target Q4 - 5 700 ISI-accredited research articles published by NRF-funded researchers by 31 March 2015

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 35:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

35

Data limitations

The collection of data is done by the implementing agency and the comprehensive information is only available after the close of the financial year.

Reasons for variances between the target set and actual achieved

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Contracts entered into with the NRF on funding of researchers. BAS Forms on Funds Transferred relating to the funding of researchers. NRF progress reports on accredited ISI research papers Database or list of peer-reviewed accredited research papers

Collection Frequency of Source data Annual

Archiving of Source Data Alfresco.

Type of information to be extracted from the source data

Number of ISI-accredited research articles published by NRF-funded researchers.

IT Systems/ Tools used to capture extracted data

Alfresco

Page 36:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

36

Source Data Capturing Frequency Annually

Individual(s) responsible for collecting the source data

All Deputy Directors

Individual(s) responsible for filing/ archiving the collected source data

Deputy Directors in the HES unit

Individual(s) responsible for extracting the required information from the source data

All Deputy Directors

Individual(s) responsible for verifying the accuracy and completeness of the extracted information

Directors in the HES unit

Individual(s) responsible for capturing the extracted information onto the IT System

Deputy Directors in the HES unit

Individual(s) responsible for verifying the accuracy and completeness of the captured information

Director in the High End Skills unit

Page 37:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

37

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco/Funded researchers ISI accredited research articles

Type of performance information to be extracted/ used

Published ISI accredited research articles

Calculations required on extracted information

Sum of Institute for Scientific Information (IS)-accredited research articles published by NRF-funded researchers

Archiving of Extracted / Recalculated Information

Alfresco.

Return Format Spreadsheet.

Reporting Frequency Annual

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

All Deputy Directors

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director : High End Skills

Individual(s) responsible for archiving the extracted/ recalculated performance information

All Deputy Directors

Individual(s) responsible for sending the information in the required return format to the ------------

Director :High End Skills

Page 38:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

38

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

Graduates and students placed in DST-funded work preparation programmes in science, engineering and technology institutions (SETI)

Date

1000 graduates and students placed in DST-funded work preparation programmes in SETI institutions by 31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To contribute to the development of representative, high-level human capital able to pursue locally relevant, globally competitive research and innovation activities.

Indicator title Total number of graduates and students placed in DST-funded work preparation programmes in SETI institutions

Purpose of indicator

To measure the number of graduates and students placed in DST-funded work

Type of indicator Input indicator

Page 39:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

39

preparation programmes in order to gain the necessary work experience

Measure / Indicator Definition

Total number of graduates and students placed in DST-funded work preparation programmes (through internship programme , PDP, National Youth Service and experiential learning) in science, engineering, technology and innovation (SETI) institutions

Measure / Indicator Formula

Total number of graduates and students placed = Number of students/graduates placed through internship programme + PDP + National Youth Service + experiential learning.

New Indicator Continuing indicator but

Desired performance High – a number of graduates and students placed in DST-funded work preparation programmes

Page 40:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

40

also made smarted and inclusive of a number of workplace preparation programmes

Measure / Indicator Owner

Director: High-End Skills and Science Promotions

Worked example Total number of graduate/students placed = No. of internships supported students (140) + No. of PDP fellows supported (80) + No. of National Youth Service Students (40) + No. of Experiential learning programme students (0) = 260 total number of graduates/students

Target set for current year

Annual: 1000 graduates and students placed in DST-funded work preparation programmes in SETI institutions by 31 March 2015 Quarterly: Q1 - No target Q2 - No target Q3 - No target Q4 - 1000

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 41:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

41

graduates and students placed in DST-funded work preparation programmes in SETI institutions by 31 March 2015

Data limitations

Data focuses on students and graduates that have been placed in the programme in a given year. The success rate of employment can be determined after the internship year.

Reasons for variances between the target set and actual achieved

No variance foreseen

Page 42:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

42

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Contracts entered into with the NRF by the interns. BAS Forms on Funds Transferred relating to the workplace preparation programmes. NRF progress reports on workplace preparation programmes DST-NRF internship database interns; and DST-National Youth Service database of students

Collection Frequency of Source data Quarterly

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Number of graduates and students placed in DST-funded work preparation programmes in science, engineering, technology and innovation (SETI) institutions.

IT Systems/ Tools used to capture extracted data

Alfresco

Source Data Capturing Frequency Quarterly.

Individual(s) responsible for collecting the source data

Deputy Director in the HES (New Generation Researchers Programmes) and Deputy Director in Science Promotions

Individual(s) responsible for filing/ archiving the collected source data

Deputy Director: New Generation Researchers Programmes and Deputy Director in Science Promotion

Individual(s) responsible for

Deputy Director: New Generation

Individual(s) responsible for

Director in High-End Skills and Director in Science Promotions

Page 43:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

43

extracting the required information from the source data

Researchers Programmes and Deputy Director in Science Promotion

verifying the accuracy and completeness of the extracted information

Individual(s) responsible for capturing the extracted information onto the IT System

Deputy Director: New Generation Researchers Programmes and Deputy Director in Science Promotion

Individual(s) responsible for verifying the accuracy and completeness of the captured information

Director in High-End Skills and Director in Science Promotions

Page 44:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

44

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco/ funded students and graduates in work preparation programmes statistics.

Type of performance information to be extracted/ used

Number of graduates and students placed in DST-funded work preparation programmes Number of graduates and students funded at each level (bachelors, honours and masters)

Calculations required on extracted information

Number of graduates and students placed by levels (bachelors, honors and masters).

Archiving of Extracted / Recalculated Information

Alfresco

Return Format Spreadsheet

Reporting Frequency Quarterly

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Deputy Director in the HES (New Generation Researchers Programmes) and Deputy Director in Science Promotions

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director in High End Skills and Director in Science Promotions

Individual(s) responsible for archiving the extracted/

Deputy Director in the HES (New Generation

Individual(s) responsible for sending the

Director: High End Skills and Director in Science Promotions

Page 45:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

45

recalculated performance information

Researchers Programmes) and Deputy Director in Science Promotions

information in the required return format to the ------------

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

Postgraduate students and fellows awarded bursaries and fellowships through NRF managed programmes

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To contribute to the development of representative, high-level human capital able to pursue locally relevant, globally competitive research and innovation activities.

Indicator title Total number of postgraduate students (BTech and honours, Master’s and PhD students, and postdoctoral fellows) awarded bursaries as reflected in the NRF project reports

Purpose of To measure the total

Type of Input indicator

Page 46:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

46

indicator number of postgraduate research students awarded bursaries by level of study (B. Tech, Master’s and PhDs) and postdoctoral fellowships

indicator

Measure / Indicator Definition

Total number of postgraduate students (BTech and honours, Master’s and PhD students, and postdoctoral fellows) awarded bursaries as reflected in the NRF project reports Postgraduates research students

Measure / Indicator Formula

Number of students awarded bursaries through and fellowships through NRF-funded programmes (B. Tech and Honours+ Master’s + PhD + postdoctoral

Page 47:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

47

receiving bursary support and postdoctoral fellowships from the NRF

New Indicator Continues with some changes to meet SMART principle

Desired performance

High – a number of students and postdoctoral feloowships awarded bursaries

Measure / Indicator Owner

Director: High End Skills

Worked example Number of students awarded bursaries and fellows awarded postdocs, e.g. (100 B. Tech and Honours+ 150 Master’s + 50 PhD + 50 postdoctoral fellows

Target set for current year

Annual: 11 440 postgraduate students

(3 414 BTech and honours, 4 671 Master's, and 2 665 PhD students, and 690 postdoctoral fellows) awarded bursaries

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 48:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

48

through NRF-managed programmes by 31 March 2015 Quarterly: Q1 - 7 700 postgraduate students and 300 postdoctoral fellows awarded bursaries through NRF- managed programmes by 30 June 2014 Q2 - 9 000 postgraduate students and 400 postdoctoral fellows awarded bursaries through NRF- managed programmes

Page 49:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

49

by 30 September 2014 Q3 - 10 000 postgraduate students and 500 postdoctoral fellows awarded bursaries through NRF- managed programmes by 31 December 2014 Q4 - 10 750 postgraduate students and 690 postdoctoral fellows awarded bursaries through NRF- managed programmes by 31 March 2015

Page 50:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

50

Data limitations

Reasons for variances between the target set and actual achieved

To be completed as milestone reached

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Bursary agreements / contracts entered into with the NRF. BAS Forms on Funds Transferred relating to the bursaries. NRF progress reports on individual programmes. Database of postgraduate students with ID numbers, student numbers, course details etc.

Collection Frequency of Source data Quarterly

Archiving of Source Data Quarterly

Type of information to be extracted from the source data

Number of graduates and students placed in DST-funded work preparation programmes in science, engineering, technology and innovation (SETI) institutions. Host institutions and the number of graduates and students placed in each institutions and their levels

IT Systems/ Tools used to capture extracted data

Alfresco

Page 51:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

51

Source Data Capturing Frequency Quarterly

Individual(s) responsible for collecting the source data

Deputy Director: New Generation Researchers’ Programmes

Individual(s) responsible for filing/ archiving the collected source data

Deputy Director: New Generation Researchers’ Programmes

Individual(s) responsible for extracting the required information from the source data

Deputy Director: New Generation Researchers’

Individual(s) responsible for verifying the accuracy and completeness of the extracted information

Director High End Skills

Individual(s) responsible for capturing the extracted information onto the IT System

Deputy Director: New Generation Researchers’

Individual(s) responsible for verifying the accuracy and completeness of the captured information

Director: High End Skills

Page 52:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

52

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco

Type of performance information to be extracted/ used

Number of postgraduate research students (honours, Master’s and PhD students) awarded bursaries and postdocs awarded fellowships

Calculations required on extracted information

Number of post graduate research students and fellows funded at each level (honours, Masters, PhD, and Postdoc )

Archiving of Extracted / Recalculated Information

Alfresco

Return Format Word document in Alfresco

Reporting Frequency Quarterly.

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Deputy Director: New Generation Researchers’

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director: High End Skills

Individual(s) responsible for archiving the extracted/ recalculated performance information

Deputy Director: New Generation Researchers’

Individual(s) responsible for sending the information in the required return format to the ------------

Director: High End Skills

Page 53:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

53

Medium–term objectives, measure/indicator, outputs, and targets

To build world-class STI infrastructure to extend the frontiers of knowledge, train the next generation of researchers and enable technology development and transfer as well as knowledge interchange

Output Name

Researchers awarded research grants through NRF-managed programmes

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To support and promote research that develops basic sciences through production of new knowledge and relevant training opportunities

Indicator title Total number of researchers awarded research grants through NRF-managed programmes as reflected in the NRF project reports

Purpose of indicator To measure the total number of researchers who get research grants from NRF-managed research grant programmes

Type of indicator Input indicator

Measure / Indicator Definition

Total number of researchers

Measure / Indicator Formula

Summation of researchers that are awarded research grants

Page 54:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

54

awarded research grants through NRF-managed programmes as reflected in the NRF project reports Researchers awarded research grants to conduct research and supervise postgraduate students (e.g. including Research Chairs, rated researchers, Centre of Excellence Researchers)

New Indicator Continues from previous financial year

Desired performance High – research grants awarded to researchers

Measure / Indicator Owner

Director: High-End Skills.

Worked example This indicator is the total number of researchers who receive research grant support from the NRF through its various programmes. This is the total number of research grantholders be they from emerging researchers programmes (i.e. Thuthuka) and established researchers

Page 55:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

55

programmes (e.g. SARChIs, CoEs, rated researchers etc). Therefore the indicator is the sum of all researchers receiving NRF grants.

Target set for current year

Annual: 3 876 researchers awarded research grants through NRF-managed programmes by 31 March 2015 Quarterly: Q1 - 1 000 researchers awarded research grants through NRF-managed programmes as reflected in the NRF project reports by 30 June 2014 Q2 - 2 000 researchers awarded research grants

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 56:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

56

through NRF-managed programmes as reflected in the NRF project reports by 30 September 2014 Q3 - 3 500 researchers awarded research grants through NRF-managed programmes as reflected in the NRF project reports by 31 December 2014 Q4 - 3 876 researchers awarded research grants through NRF-managed programmes as reflected in the NRF project reports by 31 March 2015

Page 57:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

57

Data limitations

Reasons for variances between the target set and actual achieved

Variance can be caused by the size (per capita values) of individual grants

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Contracts entered into with the NRF in respect programmes aimed at the funding of researchers. BAS Forms on Funds Transferred relating to funding of researchers. NRF progress report on researchers awarded research grants. Database of researchers (with names, ID, registration numbers etc.)

Collection Frequency of Source data Quarterly

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Number of researchers awarded research grants through NRF-managed programmes

IT Systems/ Tools used to capture extracted data

Alfresco

Source Data Capturing Frequency Quarterly

Page 58:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

58

Individual(s) responsible for collecting the source data

Deputy Director: Established Researchers Programme

Individual(s) responsible for filing/ archiving the collected source data

Deputy Director: Established Researchers Programmes

Individual(s) responsible for extracting the required information from the source data

Director: Established Researchers Programme

Individual(s) responsible for verifying the accuracy and completeness of the extracted information

Director: High End Skills

Individual(s) responsible for capturing the extracted information onto the IT System

Deputy Director: Established Researchers Programme

Individual(s) responsible for verifying the accuracy and completeness of the captured information

Director: High End Skills

Page 59:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

59

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco/funded researchers statistics.

Type of performance information to be extracted/ used

Number of researchers awarded research grants through NRF-managed

Calculations required on extracted information

Number of researchers awarded research grants

Archiving of Extracted / Recalculated Information

Word document in Alfresco

Return Format Word document

Reporting Frequency Quarterly

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Deputy Director: Established Researchers Programme

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director: High End Skills

Individual(s) responsible for archiving the extracted/ recalculated performance information

Deputy Director: Established Researchers Programme

Individual(s) responsible for sending the information in the required return format to the ------------

Director: High End Skills

Page 60:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

60

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

Participants in science awareness and engagement programmes managed by the NRF and other service providers

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To promote public engagement on science, technology and innovation.

Indicator title Total number of participants in science awareness and engagement programmes as reflected in the NRF project reports and those of other service providers

Purpose of indicator Quantifies participants in science awareness and engagement programmes

Type of indicator Output indicator

Measure / Indicator Definition

Number of participants in science

Measure / Indicator Formula

Number of participants = visitors to sites hosting awareness and engagement activities (National Science Week, Science centres and science festivals) and

Page 61:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

61

awareness and engagement programmes (STEMI Olympiads and competitions, science festivals, National Science Week and science centres) as reflected in the NRF project reports and those of other service providers

learners participating in STEMI Olympiads and competitions as well as people reached through the media (learners and members of the public)

New Indicator Continues from the previous financial year

Desired performance Yearly increase

Measure / Indicator Owner

Director: Science and Youth

Worked example 10 000 people visited 31 science centres in the 2014/15 financial year. 200 learners+ 100 members of the public= 300 participants in science awareness and engagement programmes

Target set for current year

Annual: 942 160 people participated in science awareness and engagement programmes by

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 62:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

62

31 March 2015 Quarterly: Q1 - Grant funding awarded to organisations implementing the initiatives by 30 June 2014 Q2 - National Science Week conducted by 30 September 2014 Q3 - 3 science festivals & 6 STEMI Olympiads & competitions conducted by 31 December 2014 Q4 - 4 science festivals conducted & annual report on people’s participation in science centres received by 31 March 2015

Page 63:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

63

Data limitations

Complete data on participation is only available after receipt of annual or final project reports from the NRF and other relevant service providers

Reasons for variances between the target set and actual achieved

To be completed as milestone reached

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Contracts entered into with service provider where applicable Quarterly projects reports submitted by the NRF and other relevant service providers. Annual or final project reports submitted by the NRF and other service providers. Attendance registers for mass participation activities and visits to science centres. Enrolment forms for STEMI Olympiads and competitions.

Collection Frequency of Source data Quarterly

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Number of participants in science awareness and engagement programmes Participation according to demographics Involvement of various institution in the National System of Innovation

IT Systems/ Tools used to capture extracted data

Alfresco/spreadsheet

Page 64:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

64

Source Data Capturing Frequency Frequency source data is extracted and captured i.e. daily, weekly, monthly, quarterly, annually.

Individual(s) responsible for collecting the source data

Deputy Director: Science and Youth (Out-of-School programme)

Individual(s) responsible for filing/ archiving the collected source data

Deputy Director: Science and Youth (Out-of-School programme)

Individual(s) responsible for extracting the required information from the source data

Deputy Director: Science and Youth (Out-of-School programme)

Individual(s) responsible for verifying the accuracy and completeness of the extracted information

Director: Science and Youth

Individual(s) responsible for capturing the extracted information onto the IT System

Deputy Director: Science and Youth (Out-of-School programme)

Individual(s) responsible for verifying the accuracy and completeness of the captured information

Director: Science and Youth

Page 65:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

65

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Quarterly and annual project reports from the NRF and relevant service providers

Type of performance information to be extracted/ used

Number of participants in science awareness and engagement programmes Participation according to demographics Involvement of various institution in the National System of Innovation

Calculations required on extracted information Number of participants in science awareness and engagement programmes

Archiving of Extracted / Recalculated Information

Alfresco

Return Format Microsoft word

Reporting Frequency Quarterly

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Deputy Director: Science and Youth (Out-of-School programme)

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director: Science and Youth

Individual(s) responsible for archiving the extracted/ recalculated performance information

Deputy Director: Science and Youth (Out-of-School programme)

Individual(s) responsible for sending the information in the required return format to the ------------

Director: Science and Youth

Page 66:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

66

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

Strategy documents

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To strategically develop priority science areas in which South Africa enjoys a competitive advantage, by promoting internationally competitive research and training activities and outputs.

Indicator title Number of strategy documents approved by the DST Executive Committee

Purpose of indicator Measures the number of strategy documents that will be developed and approved by the DST Exco

Type of indicator

Output indicator

Page 67:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

67

Measure / Indicator Definition

Number of strategy documents approved by the DST Executive Committee Strategy documents refers to the documents that will have to be achieved in a given time

Measure / Indicator Formula

Summation of the strategy documents that are approved by the DST Exco

New Indicator Continues from previous financial year

Desired performance

1 Marine and Antarctic Research Strategy approved by DST Exco by 31 March 2015

Measure / Indicator Owner

Director: Science Platforms.

Worked example 1 HCD strategy+ 1 Antarctic research strategy= 2 strategy documents approved by the DST Exco

Target set for current year

Annual: 1 Marine and Antarctic Research Strategy approved by the DST Exco by 31 March 2015

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 68:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

68

Quarterly: Q1 - First draft of the Marine and Antarctic Research Strategy completed by 30 June 2014 Q2 - Approval of first draft of Strategy by DDG for submission to DST Exco by 30 September 2014 Q3 - Presentation of the draft Marine and Antarctic Research Strategy to DST Exco by 31 December 2014 Q4 - 1 Marine and Antarctic

Page 69:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

69

Research Strategy approved by DST Exco by 31 March 2015

Data limitations

No limitations

Reasons for variances between the target set and actual achieved

No variance

Page 70:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

70

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data The EXCO document for approval of the draft Marine and Antarctic Strategy. The draft Marine and Antarctic Research Strategy EXCO minutes on the approval of the strategy

Collection Frequency of Source data Quarterly

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Approved draft Marine and Antarctic research strategy

IT Systems/ Tools used to capture extracted data

Alfresco word document.

Source Data Capturing Frequency Quarterly.

Individual(s) responsible for collecting the source data

Director: Science Platforms

Individual(s) responsible for filing/ archiving the collected source data

Deputy Director: Science Platforms

Individual(s) responsible for extracting the required information from the source data

Deputy Director: Science Platforms

Individual(s) responsible for verifying the accuracy and completeness of the extracted information

Director Science Platforms

Individual(s) responsible for

Deputy Director: Science Platforms

Individual(s) responsible for

Director: Science Platforms

Page 71:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

71

capturing the extracted information onto the IT System

verifying the accuracy and completeness of the captured information

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco.

Type of performance information to be extracted/ used

Approved Marine and Antarctic research strategy

Calculations required on extracted information

N/A.

Archiving of Extracted / Recalculated Information

Alfresco.

Return Format Word document

Reporting Frequency Quarterly.

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Deputy Director: Science Platforms

Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Director: Science Platforms

Individual(s) Deputy Director: Individual(s) Deputy Director: Science Platforms

Page 72:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

72

responsible for archiving the extracted/ recalculated performance information

Science Platforms responsible for sending the information in the required return format to the ------------

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

MeerKAT antennae installed

Date

31 March 2015

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To strategically develop priority science areas in which South Africa enjoys a competitive advantage, by promoting internationally competitive research and training activities and outputs.

Indicator title Number of MeerKAT antennae installed as per SKA specifications

Purpose of indicator To measure the number of MeerKAT

Type of indicator

Output

Page 73:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

73

antennae installed against the set target

Measure / Indicator Definition

Number of MeerKAT antennae installed at the SKA Site in Carnavon

Measure / Indicator Formula

The total number of installed MeerKAT antennae per financial year= 4 Meerkat antennae

New Indicator Yes Desired performance

Higher performance desirable – 4 MeerKAT antennae installed

Measure / Indicator Owner

DDG Worked example Number of installed Meerkat antennae

Target set for current year

Annual: 4 new MeerKAT antennae installed as per SKA specifications by 31 March 2015 Quarterly: Q1 - Acceptance testing for first 2 antennae completed by

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 74:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

74

30 June 2014 Q2 - 3rd antenna installed by 30 September 2014 Q3 - 4th antenna installed by 31 December 2014 Q4 - Array release of antennae 1 to 4 completed by 31 March 2015

Data limitations

No Data Limitations

Reasons for variances between the target set and actual achieved

Page 75:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

75

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Official SKA Reports Signed SKA Letters

Collection Frequency of Source data Quarterly

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Indication of the number of installed MeerKAT antennae

IT Systems/ Tools used to capture extracted data

Alfresco

Source Data Capturing Frequency Quartely

Individual(s) responsible for collecting the source data

Deputy Director: Radio Astronomy Projects:

Individual(s) responsible for filing/ archiving the collected source data

Deputy Director: Radio Astronomy Projects:

Individual(s) responsible for extracting the required information from the source data

Deputy Director: Radio Astronomy Projects

Individual(s) responsible for verifying the accuracy and completeness of the extracted information

Director: Radio Astronomy Projects

Individual(s) responsible for capturing the extracted

Deputy Director: Radio Astronomy Projects:

Individual(s) responsible for verifying the accuracy

Director: Radio Astronomy Projects

Page 76:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

76

information onto the IT System

and completeness of the captured information

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco

Type of performance information to be extracted/ used

Number of installed MeerKAT antennae and data source verification number

Calculations required on extracted information Number of installed MeerKAT antennae

Archiving of Extracted / Recalculated Information

Alfresco

Return Format Word document

Reporting Frequency Quartely

Individual(s) responsible for extracting, calculating and consolidating the reported performance information

Deputy Directors Individual(s) responsible for verifying the accuracy and completeness of the extracted performance information

Directors

Individual(s) responsible for

Directors Individual(s) responsible for

Chief Directors

Page 77:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

77

archiving the extracted/ recalculated performance information

sending the information in the required return format to the ------------

Medium–term objectives, measure/indicator, outputs, and targets

To enhance South Africa's knowledge-generation capacity in order to produce world-class research outputs and turn some advanced findings into innovation products and processes

Output Name

Strategy documents

Date

31 December 2014

1. Overview of the objective, output, measure / indicator and target to be reported on

Programme # Programme 4

Programme’s Strategic Objectives (as per the Strategic Plan and the annual Performance Plans

To strategically develop priority science areas in which South Africa enjoys a competitive advantage, by promoting internationally competitive research and training activities and outputs.

Indicator title Number of strategy documents approved by the DST Executive Committee

Purpose of indicator To measure the number of DST EXCO approved

Type of indicator

Output

Page 78:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

78

strategy documents

Measure / Indicator Definition

Number of strategy documents approved by the DST Executive Committee Strategy documents refers to the documents that will have to be achieved in a given time

Measure / Indicator Formula

Summation of the strategy documents that are approved by the DST Exco

New Indicator New indicator Desired performance

Higher performance is desirable – approved Multiwavelength Astronomy Strategy

Measure / Indicator Owner

Director: Multi-wavelength Astronomy:

Worked example 1 HCD strategy+ 1 Antarctic research strategy= 2 strategy documents approved by the DST Exco.

Target set for current year

Annual: Multi-wavelength astronomy strategy approved by DST EXCO by 31 December

Target achieved Actual target achieved. Q1 – Q2 – Q3 – Q4 – YTD - :

Page 79:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

79

2014 Quarterly: Q1 - Draft multi-wavelength strategy finalized by 30 June 2014 Q2 - Consultation concluded on multi-wavelength strategy by 30 September 2014 Q3 - Multi-wavelength strategy approved by DST EXCO by 31 December 2014

Q4 - No target

Data limitations

No data limitations

Page 80:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

80

Reasons for variances between the target set and actual achieved

2. Collection of source data to enable effective reporting on the adopted output measure / indicator

Source data Draft Multi-wavelength Astronomy Strategy, Official EXCO Document and Minutes of the EXCO Meeting

Collection Frequency of Source data Quarterly

Archiving of Source Data Alfresco

Type of information to be extracted from the source data

Multi-wavelength Astronomy Strategy.

IT Systems/ Tools used to capture extracted data

Alfresco

Source Data Capturing Frequency Quarterly

Individual(s) responsible for collecting the source data

Deputy Directors Multi-wavelength Astronomy:

Individual(s) responsible for filing/ archiving the collected source data

Deputy Directors: Multi-wavelength Astronomy y

Individual(s) responsible for extracting the required

Deputy Directors: Multi-wavelength Astronomy

Individual(s) responsible for verifying the accuracy

Directors: Multi-wavelength Astronomy

Page 81:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

81

information from the source data

and completeness of the extracted information

Individual(s) responsible for capturing the extracted information onto the IT System

Deputy Directors: Multi-wavelength Astronomy:

Individual(s) responsible for verifying the accuracy and completeness of the captured information

Directors Multi-wavelength Astronomy:

3. Quarterly and Annual Reporting of Collected/ Extracted Performance Information

Performance Information Source Alfresco

Type of performance information to be extracted/ used

Multi-wavelength Astronomy Strategy

Calculations required on extracted information

N/A

Archiving of Extracted / Recalculated Information

Alfresco

Return Format Word document

Reporting Frequency Frequency the collected performance information is to be reported on i.e. quarterly or annually.

Individual(s) Deputy Directors Individual(s) Directors: Multi-wavelength Astronomy:

Page 82:  · 1 PROGRAMME 4: RESEARCH AND DEVELOPMENT SUPPORT INDICATOR DESCRIPTIONS 2014/15 Medium–term objectives, measure/indicator, outputs, and targets To build world-class STI infrastru

82

responsible for extracting, calculating and consolidating the reported performance information

Multi-wavelength Astronomy:

responsible for verifying the accuracy and completeness of the extracted performance information

Individual(s) responsible for archiving the extracted/ recalculated performance information

Directors: Multi-wavelength Astronomy

Individual(s) responsible for sending the information in the required return format to the ------------

Chief Director: Multi-wavelength Astronomy