1. Productivity benchmarking & gap analysis
2. Productivity improvement roadmap development
3. Number of Initiatives implemented (OPEX & CAPEX)
4. Results achieved (vs) targets planned
5. Riplicability of the idea implemented within the sector /outside the sector
6. Learnings of the initiative
7. Recognition and Awards
Trusted Technology – Solid Strength
Trusted Technology - Solid Strength
PRODUCTS
MINE SITE
GULBARGA
PLANT SITE
Mining Crushing Stacking & Reclaiming
Clinkerisation
ClinkerGrinding
Packing
Delivery Truck
Coal Grinding
Delivery Rack
Delivery Bulk
Raw MealGrinding
Stacking & Reclaiming
Trusted Technology - Solid Strength
Company and Energy Policy
Management KPI are formed on every start of FY And are achieved
Trusted Technology - Solid Strength
Other Policy’s which we follow
1. Water Policy.
2. TPM Policy.
3. JH Pillar Policy
4. Planned Maintenance Pillar Policy.
5. Quality Maintenance Pillar Policy.
6. KK ( Focused Improvement) Pillar
Policy.
7. Administrative & Support Pillar Policy.
8. Education & Training Pillar Policy .
9. Safety , Health & Environment Pillar
Policy.
10. Mission on Sustainable Growth –
Declaration
11. Green Procurement Policy .
12. Green Transport Policy.
13. Guide Lines for Purchase.
14. Initiative for Green Supply chain
Procurement.
15. Recruitment Policy .
Trusted Technology - Solid Strength
1. Productivity benchmarking & gap analysis
We are having key performance indicator (KPI) for each and every individual section performance and is being monitored by HOD & Plant Head – For Example Mechanical department has following :• Spare consumption in Rs./MT• Lubricant Consumption Renewal in Liters• Lubricant Consumption Top up in Ltrs / 100 Rhrs.• Grease Consumption in Kg/100 Rhrs .• Percentage of Break down• Mean time Between Stoppages in Hrs.• Number of Stoppages.• Contract Manpower in Man days ( Department wise) • Permanent workmen Over Time in Rs. (Department wise)
Trusted Technology - Solid Strength
1. Productivity benchmarking & gap analysisa) Regular comparison of our achieved values with National & International best
values are compared and operated
b) On basis of which every department has been assigned with the benchmarksIn their key areas.
c) The benchmarking figures are reviewed every month by plant head in thepresence of all department HOD’s & section in charges.
d) Any deviation if found, is discussed in the meeting with detail analysis.
e) The benchmarking figures are set every year with target and goal Value.
f) A regular review of important parameters are done in production meeting.AOP and KPI’s are reviewed at the end of each year & new targets & KPI’s aregiven at the start of each financial year.
g) A sample of benchmarking presentation is shown in next few slides.
h) Sample copy of Benchmarking sheet & AOP sheet.
Trusted Technology - Solid Strength
BENCH MARK VALUE 106.83TARGET VALUE 110.0GOAL VALUE 115.54
CLINKER PRODUCTION IN TPH OF UNIT-1
BETTER
TPH
Trusted Technology - Solid Strength
COAL MILL PRODUCTION IN TPH OF UNIT-1
TPH BENCH MARK VALUE 20
TARGET VALUE 20.60 GOAL VALUE 21.63
BENCH MARK VALUE 158
TARGET VALUE 162.74
GOAL VALUE 170.88
RAW MILL PRODUCTION IN TPH OF UNIT-1
BETTER
TPH
Trusted Technology - Solid Strength
BENCH MARK VALUE 244
TARGET VALUE 251.32
GOAL VALUE 263.89
CEMENT MILL PRODUCTION IN TPH OF UNIT-1 ( 43 GRADE)
BETTER
TPH
Trusted Technology - Solid Strength
BENCH MARK VALUE 235
TARGET VALUE 242.05
GOAL VALUE 254.15
CEMENT MILL PRODUCTION IN TPH OF UNIT-1 ( 53 GRADE)
BETTER
TPH
Trusted Technology - Solid Strength
BENCH MARK VALUE 272
TARGET VALUE 280.16
GOAL VALUE 294.17
CEMENT MILL PRODUCTION IN TPH OF UNIT-1 ( PPC GRADE)
BETTER
TPH
Trusted Technology - Solid Strength
BENCH MARK VALUE 709
TARGET VALUE 688GOAL VALUE 655
SPECIFIC HEAT CONSUMPTION IN Kcal/Kg CLINKER( Unit-I)
BETTER
kCal
/Kg
Trusted Technology - Solid Strength
BENCH MARK VALUE 0.16
TARGET VALUE 0.16GOAL VALUE 0.15
REFRACTORY COSUMPTION ( IN KG/MT OF CLINKER)
BETTERKG
/MT
Trusted Technology - Solid Strength
Trusted Technology - Solid Strength
1.2 EMPLOYEE SCORE CARDSAMPLE COPY OF PERFORMANCE APPRAISAL
KESORAM INDUSTRIES LTD.
CEMENT DIVISION
KPI Assessment Form (2017-2018)
Name: R.K GUPTA Department: ElectricalDOJ:
25/06/2017
Employee Code: 202769 Reporting Manager Name & Designation: Chander Kumar Jain – HMO
Designation : Sr. GM (E&I) Location: Vasavadatta cement – sedam
Part I - Functional (70%)
S.No KPI Target Timelines - By when KPI Weightage Action Plan to achieve Target achievement - self
score (%)
Target Achievement - self
comments
Target achievement - Appraiser Score
(%)
Target achievement - appraiser
commentsWeighted score
1
Reduction of Electrical Specific power consumption of cement plant.
69.85 Kwh / Ton of Cement.
31/03/2018 25%
1. Implementation of Energy saving suggestions/Kaizens. 2. Reduction of Breakdowns. 3. Optimization of equipment run hours.4. Installation of energy saving equipments.
2Reduction of Electrical & Instrumentation Stoppages of Cement Plant and Power Plant.
192 to 150 Nos. 31/03/2016 20%
1. Planned & Preventive Maintenance. 2. Condition monitoring of equipments. 3.Overhauling of HT / LT Motors, Transformers, Breakers on condition bases and as per EAM schedule. 4.Maintaining adequate healthy power supply. 5. Maintenance of HT / LT Panels , Breaker, LRS / GRR as per EAM Schedule. 6.Preparing why why analysis for stoppages and found route cause to avoid repeated stoppages. 7. Calibration of Protection Relays once in a Year.8. Review of Relay Co-ordination.
3 Driving TPM KK Pillar as Chairman for getting more no of Kaizens. 500 Nos. 31/03/2016 25%
1. Conduct Weekly Review Meeting with all department Co-ordinators. 2. Collecting Kaizens. 3. Preparing Status of Kaizens. 4. Planning of Audit Schedule. 5. Organizing Kaizen Presentations.6. Rewarding Kaizens for encouragement.
4 Laisoning & Statutory Compliance. 100% Accurate. As per Time line of Each Statutory Compliance. 15%
1. Weights & Measures compliance.2. Nucleonic devices compliance.3.Annual inspection by CEIG.4. Co-Ordination of M&V Energy Audit and submission of report to BEE under PAT scheme.5. Co-Ordination of Mandatory Energy Audit and submit report to BEE. 6. Obtaining approvals for new Electrical installations.
5Driving ISO 50001 Energy Management System as Management Representative.
No NCR. 31/10/2015 15%
1. Review of procedures and documents. 2. Conducting Internal and External Audits once in Six Month. 3. Coordination with all Team leaders. 4. Management Review Meeting Once in Six Months.
Total
Rating A
Weighted Avg Score Rating Definition
110 and above 5 Excellent
101 to 109 4 Very Good
90 to 100 3 Good
75to 89 2 Average
Below 75 1 Poor
Additional Tasks handled beyond KPIs
Employee sign off Reporting Manager Sign off Reviewer 1 Sign off Reviewer 1 Sign off HOD sign offPresident Sign off (only for Sr. Mgrs &
above)
Name, Signature & Date
Trusted Technology - Solid Strength
1.2 EMPLOYEE SCORE CARDSAMPLE COPY OF PERFORMANCE APPRAISAL
KESORAM INDUSTRIES LTD.
CEMENT DIVISION
KPI Assessment Form (2017-18)Name:Uday Mugali Department:Process DOJ:16-07-2007Employee Code:210637 Reporting Manager Name & Designation: VP(P&QC)
Designation :AVP-Process Location:Sedam
Part I - Functional (70%)
S.No KPI Target Timelines - By when KPI Weightage Action Plan to achieve Target achievement - self score
(%)Target Achievement - self comments Target achievement - Appraiser Score (%) Target achievement - appraiser comments Weighted score
1
Production
Performance rate:
Clinker(Unt-1,2,3&4)
(Average actual
Production(t/h)/standa
rd production rate(t/h)
X 100(%)
Standard Production
rate:
Unit-1: 100tph(2400TPD)
Unit-2:150tph(3600TPD)
Unit-3 & 4:
196tph(4700TPD)
Unit-1: 100%
Unit-2: 100%
Unit-3: 100%
Unit-4: 100%
31st
March201835%
1. Monitoring & Preparing of daily production
deviation report communicating to CMO & will be
discussed in Production meeting.
2.Monitoring & Submitting report to HMO monthly
production performance.3.Keeping Close Co-
Ordination & good ommunication with QC & other
department and inform abnormalities to the
concerned..4.Improvement of the operation
practices for a better productivity & achive
targets.5.Monitor the quality of the products- Raw
meal, Clinker and Cement- and maintain the quality
within the range as defined in the QMS
procedures(residue,litre weight, blaine).
2
Productivity 1.Stores Spares
Cost(Rs/MT
Cement)
2.Contractor Man
Power Cost
1. Rs.09.00/MT
of Cement
2. Rs.01.50/MT
of Cement
31st
March201820%
1.Selection of Refractories
Quality.2.Identyfying refr.quantity used &
their cost.3.Evaluating refr. consumption
pattern. 4.Identifying potential areas for
reduction of refractory consumption &
their by cost.5.Reduction of thermal
shocks cooling down & heating up
6.Minimizing leakages & spillages.
3
Thermal energy ;
Specific Fuel heat
consumption
(Kcal/Kg Clinker)
Unit-1: 712
Unit-2: 709
Unit-3: 705
Unit-4: 705
Kcal/Kg Clinker
31st
March201815%
1.Optimize the kiln operations to avoid upset &
optimize kiln exit gas losses.2.Operate at optimal
oxygen levels (control combustion air input & air
infiltration).3.Optimize burner flame
shape.4.Optimizing cooler operation to retaining
more heat within the pyroprocessing system & lower
the clinker & stack temperature.5.Lower cold air
leakage (Close unnecessary openings).6.Monitoring
Heat Balance.
4
Electrical energy:Reduction of Unit-2
RM fan
power(KWH)
100KWH31st Nov
201715%
1.Optimising nozzle velocity.2.Optimistaion
of raw mill residue.
3.Identfying leakages & plugging in
cordination with mechanical
department.4.Closely monitoring LS size.5.
Optimisation of fan flow by controlling speed.
5 Safety: Reportable accidents in process activity. Zero(0) numbers 31st March2015 15%
1. Develop safety consiuos among the staff & workmen.2. Measures to prevent behavior oriented accidents3. Measures to prevent equipment oriented accidents 4. Ensuring safety interlock of equipments & Line clearance of
equipments during maintenance. 5. Identifying safety rsik activities & training SOPs. 6. Ensuring usage of PPEs during performing risk activities.
Total 100%
Rating A
Weighted Avg Score Rating Definition
110 and above 5 Excellent
101 to 109 4 Very Good
90 to 100 3 Good
75to 89 2 Average
Below 75 1 Poor
Additional Tasks handled beyond KPIs
Employee sign off Reporting Manager Sign off Reviewer 1 Sign off Reviewer 1 Sign off HOD sign off President Sign off (only for Sr. Mgrs & above)
Name, Signature & Date
Trusted Technology - Solid Strength
Yellow – Abnormal Green – Normal
1.3 Sample Comparison Statement for power monitoring
Trusted Technology - Solid Strength
1.4 REVIEW BY MANAGEMENT
FREQUENCY REPORT/SYSTEM RESPONSIBILITY
24 Hrs X 7days
“Prevention is better than Cure” So On line SP power Monitoring facility provided for Unit-3 & 4 at CCR.
Energy consumptions reviewed in Production Meeting headed by HMO.
Daily review meeting with power plant O & M teamby HOD to optimize plant performance by monitoringand controlling of parameters like auxiliary power,coal, water and plant heat rate.
Energy consumptions reviewed in Cross functional Meeting headed by HMO.
Stoppage , OEE & Benchmark Presentation (Specific Power Consumption, Details of Stoppages, Heat Balance ,Power plant performance )
CCR Operator
Daily HMO
HOD
HMOWeekly
Monthly
Daily
HMO
Trusted Technology - Solid Strength
REVIEW BY MANAGEMENT.
FREQUENCY REPORT/SYSTEM RESPONSIBILITY
Review of Energy Management System ISO-50001Section Wise.
Review of Packing Plant Power consumption.
Review of Cement Mills Power consumption.
Review of equipments running Idle.
Review of steam leakages detection
Review of Water consumption trends.
Review of AOP headed by President/ HMO.
Review of Energy Management System ISO-50001 with Top management , MR & Team Leaders .
Surveillance Audit by external Auditor.
TEAM LEADER
Half Yearly HMO
Monthly
PRESIDENT / HMO
Trusted Technology - Solid Strength
Total Sp. Power Consumption Overall (All Grades)
(Kwh/Ton of Cement )
10-11 11-12 12-13 13-14
Kw
h/T
on
of
Ce
me
nt
14-15 15-16 16 - 17
High production in pet coke
Trusted Technology - Solid Strength
Sp. Power Consumption up to Clinkerisation(Kwh/Ton of Clinker )
Kw
h/T
on
of
Clin
ker
14-15 15-16 16 - 17
Trusted Technology - Solid Strength
Sp. Power Consumption on cement grinding(Kwh/Ton of Cement )
Kw
h/T
on
of
Ce
me
nt
14-15 15-16 16 - 17
Trusted Technology - Solid Strength
Sp. Power Consumption on cement Packing(Kwh/Ton of Cement )
Kw
h/T
on
of
Ce
me
nt
14-15 15-16 16 - 17
Trusted Technology - Solid Strength
SP. POWER CONSUMPTION ON PPC GRADE(Kwh/Ton of Cement )
Kw
h/T
on
of
Ce
me
nt
Year
Even after Use of pet
coke &Premium
cement Trials with 18% FA
Trusted Technology - Solid Strength
Specific Thermal Energy Consumption
K.C
al/K
g C
lk
Year
Low Sp.
Heat value even after regular pet
coke use
Trusted Technology - Solid Strength
Clinker Factor for OPC cement
Year
Trusted Technology - Solid Strength
S.No Energy UnitNational
best
International
best
VC Value
1Thermal
energy
Kcal / kg
clinker682
667 (Japan) (values for 16-17)
706.94
(Avg of all four
units)
2Electrical
energy
KWH /MT
Cement
(Actual)
(100 %
PPC)
65.67 65 (Japan) 56.98
1.5 Bench Mark Comparison with other Industry:
Data From CII
Trusted Technology - Solid Strength
2.0 PAT Requirement• VC has been given a PAT target of 4.82 % reduction i.e from 1098.82 to 1045.86 K.Cal /Kg
Equivalent major Cement Product in the year 2014-15.
• New Target of 4.53 % reduction from 949 to 906 K.Cal /Kg Equivalent major Cement
Product given to us
• M/s. Zenith Energy Ltd. has carried out M&V audit, VC has Earned 50741 E-Certs
BaseLine
value 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16
Heat Value
KCal / Kg of Equ of cement
1098.82 1102.30 1097.56 1076.05 996.606 910.00 734.00
Trusted Technology - Solid Strength
3.0 Utilization of renewable Energy sources
1. Solar heating system for Industrial Canteen.2. Installed Steam Cooking in our Canteen3. Solar Lighting at New ADM building.4. Wind Mill for Bag filters installed for two bag filters
1. Techno-feasibility studies completed for Installation ofWaste heat recovery system on cooler and PH exitgases.
2. There is possibility of 17MW power generation withWHRS.
3. In Advanced stage for installation of 5MW solarpower generation.
Initiative
implemented
Action
Planned
For future
Trusted Technology - Solid Strength
VC purchased the renewable energy certificates on 30th May 2018
Trusted Technology - Solid Strength
VC purchased recently the renewable energy certificates on 27th June 2018
Trusted Technology - Solid Strength
4.0 Utilization of Waste as fuel (Alternate Fuel Utilization)
AFR Consumed MT
2015-16 2016-17 2017-18
Consumed, MT
Coal Saved
Consumed, MT
Coal Saved
Consumed, MT
Coal Saved
Benzo Feron 249 121 261 169 27 10
Tire Chips 7430 10484 21 24.7 Nil Nil
Carbon Black 9865 10139 18429 19010 14336 15292
PU Waste 94 102 Nil Nil Nil Nil
Rubber Chips 129 159 Nil Nil Nil Nil
Plastic Waste 4618 3225 5688 2193 7384 772
Municipal Waste Nil Nil 77 22 29 22
Total 22386 24230 24475 21416 21776 16097
Trusted Technology - Solid Strength
5.0 Number of Initiatives implemented Projects With Very Less In House Investments
S.No
Project Description Investment RsLac
Saving(Rs.Lac )
1 Optimization of running hours of 91 No's Air Dryers of IR compressors by introducing Interlock with Compressor.
0 58.50
2 Silencer Removed And Inlet Cone Fabricated For Suitable Condition For Cooler Fans Inlet Duct(Line -3)
0 10.20
4 Addition of Bed ash in clinker cooler 0 7.50
5 Avoiding Idle running of Compressors At Different Locations (Pre Heater / Raw Mill / Cement Mill)
0 4.79
6 optimization the HR recirculation fan in Cement Mill 0 6.00
7 Replacement of conventional light fittings with LED light fittings at various locations
5 15.62
Trusted Technology - Solid Strength
Projects With Very Less In House Investments S.
NoProject Description Year Investment
Rs lacSaving
( Rs.Lac )
7 Avoided the idle running of 1L12BC (Gypsum belt)
17-18 0 1.532
8 Reduce the false air in Polycom 4 circuit & optimise Operation of HR Bag house.
17-18 0 15.25
9 Removed 1N11BF fan from the circuit 17-18 0 1.123
10 Energy conservation by stopping 2N23ABC, 2N23BBC, 2N22RA & 2N28BF
17-18 0 14.68
11 Reduction of false air in coal mills 16-17 0 4.79
12 Removed 2N33BF fan & its RAL from the circuit 17-18 0 2.139
Trusted Technology - Solid Strength
Projects With Cost Benefits
S.No Project Description SavingRs Lac or Kcal
1 Compressor air line integration between U-3 to U-2. 19.8 Lacs
2 Installation of 75 KW VFD Drive for PC Firing ROS Blower (Unit II Kiln Section)
4.75 lacs
3 Main PA fan 132 KW motor replaced with existing spare 90KW motor. (Unit 3 Kiln)
5.180 lacs
4 Replacement of Unit-1 Cooler fan-2 motor with energy efficient motor
1.40
5 Avoid the running of higher capacity compressor for Raw mill 1&2 hopper top bag filters.
5.52
6 Provided VFD Drives for Packer bag filters. 4.90
7 Reduction in pressure drop across damper in CM – 4 HR, BH & Sepol fan
82.2 Lacs
Theme : Utilization of bed ash in clinker
Section: Quality Control in Pyro - processing
Period of Implementation: Immediate.
Trusted Technology – Solid Strength
Innovative Project-1
Why-Why Analysis:
Q. Why Bed ash cannot be added as raw
material in kiln?
Bed ash is a siliceous material which is a by
product from power plant & use of it in
grinding will effect on cement quality.
Q. Why it effects cement quality?
As it is high in silica (around 60%) & low in
lime, it is as good as grinding very high
siliceous clinker to make cement.
Trusted Technology – Solid Strength
Idea:
Consume bed ash by adding it in clinker
cooler , so that we feed it in uniform way
and consume accordingly with clinker @
1.00 %
Trusted Technology – Solid Strength
Trusted Technology – Solid Strength
Counter Measures:
Consuming bed ash by adding it in clinker
cooler.
Proper feeding systems are provided to consume
it on regular basis by Mechanical dept.
Clinker samples were collected on regular basis
to ensure consistent quality of clinker and no
deteoration in quality of clinker.
Clinker chemistry Before addition :
Trusted Technology – Solid Strength
% SiO2 Al2O3 Fe2O3 CaO MgO K2O Na2O SO3 LOI SUM LSF SM AM C3S C2S C3A C4AF LIQUID
Clinker 0.99 22.20 5.30 4.20 65.5 1.23 0.35 0.14 0.30 0.30 99.22 92.07 2.34 1.26 50.25 25.76 6.95 12.78 25.47
Bed Ash 0.01 60.00 26.00 4.00 0.50 0.80 0.30 0.15 0.25 8.00 99.75 0.25 2.00 6.50
TOTAL 1 22.58 5.51 4.20 64.8 1.23 0.35 0.14 0.30 0.38 99.23 89.52 2.33 1.31 43.34 32.05 7.50 12.77 26.20
% SiO2 Al2O3 Fe2O3 CaO MgO K2O Na2O SO3 LOI SUM LSF SM AM C3S C2S C3A C4AF LIQUID
Clinker 1 22.20 5.30 4.20 65.5 1.23 0.35 0.14 0.30 0.30 99.22 92.07 2.34 1.26 50.25 25.76 6.95 12.78 25.47
After Addition of Bed Ash :
Results:
Clinker replacement by addition of
bed ash : 50 MT/ day
Cost of clinker production : Rs1904/MT clinker
Total quantity consumed till ov’17 : 3100 MT
Therefore, : 1904 * 3100 MT
: Rs. 59 Lacs
Considering saving of Rs 7 Lacs/month, savings from
Dec’17 to March’18 will be : Rs 28 Lacs
Therefore total savings will be : Rs 87 Lacs
Trusted Technology – Solid Strength
Benefits:
1. Reduction in clinker consumption.
2. Reduction in power consumption ( not considered in
the savings).
3. Waste utilization generated by thermal plants 100 %
& eco friendly to nation & society.
4. Reduction in GHG emission.
5. Reduction in cost of cement manufacturing.
Trusted Technology – Solid Strength
Duo Flex Burner tip life enhancement in Unit – 3 & 4.
Innovative Project-2
Theme : Duo Flex Burner tip life enhancement in Unit – 3 & 4.
Trusted Technology – Solid Strength
Before:
Lot of Pits observed on burner tip, even after maintenance of burner as
given by OEM recommendation (annular gap) after few days in operation &
also there was observation that flame was off centre.
To correct the flame, inner pipe of burner was retracted to make the flame
positioned at centre. The deformation in flame i.e off centre was increasing
with increasing in operation time & burner tip life was around 30-45 days
only.
Idea:
Maintain the uniform annular gap across the periphery of
burner tip in between inner & outer pipe, wedge to be
provided in all four quarters of burner.
After installation of wedges(April’18 U-4), burner tip was kept at Zero
position, flame was observed on daily basis for any deviation from
centre. Even after operating the same burner for three months
(checked in U-4 stoppage), tip was found to be in good condition.
Trusted Technology – Solid Strength
Benefits:
1. No deformation in flame shape
2. Burner flame in center.
3. Increase in Flame momentum by maintaining Burner tip
at zero position.
4. Reduction in Sp Fuel consumption & better clinker
quality.
5. No frequent adjustment inner pipe to make the flame
center.
6. Burner tip life enhancement.
7. Reduction in SEC at the time of Cooling, ramp-up &
pickup.
8. Reduction in Kiln Thermal shocks.
Trusted Technology – Solid Strength
Savings:I) In terms of coal consumed to restart the plant after Burner pipe
replacement (8-10Hrs)
Coal Consumed for plant heat-up 15-20MT
Coal Cost - Rs. 5700/MT(including grinding cost)
Saving - Rs 5700 x 18MT Coal consumed
- Rs. 102600 for one burner pipe
Considering two burner replacement due to tip wear in Unit – 3 & 4
which accounts to four stoppages to replace burner pipe
Net Saving - 4no x Rs102600
= Rs. 4,10,400
II) Welding material & man power cost for rebuild up.
For One Burner pipe - Rs 65000 x 4no
= Rs. 260000
III) Total saving annually = 410400 + 260000
= Rs 6,70,400
Trusted Technology – Solid Strength
Power Reduction in Unit-3 Bag House Fan.
Innovative Project-3
Theme : Power Reduction in Unit-3 Bag House Fan.
Trusted Technology – Solid Strength
After checking the operating parameters of RABH & fibre
glass bags, with I/L temp 240 Deg C continuously & peak
value of 260 Dec C, we have consulted different major
suppliers of Bags regarding the observation, all the
suppliers had given clearance to raise the temperature
against present operation. With this the matter was raised
with OEM.
OEM has accepted our observation & given consent to
revise the setting of RABH I/L Temp.
Before:
1. Two fresh air dampers are
operating in PID to control
RABH I/L temperature as
per set point of 175 Deg C
(as defined by OEM)
2. Third damper is provided to
further control the
temperature, if these two
dampers are in open
condition & temperature is
going beyond 175 Deg C.
Setting of Temperature was
as given below.
Full open at 180 Deg C &
Close at 160 Deg C
Trusted Technology – Solid Strength
After:
Fresh Air Dampers 1 & 2
Operating in PID, Set Point
Increased From 175 to 195
Degree Celsius.
Interlock Provide to third
damper to Open @ 208 Deg C &
Close @ 195 Deg C Instead of
Operating @ 180 & 160 Deg C
Respectively.
Benefits:
Power Saving.
Improvement in Existing System.
Before Modification:
May-2018 Specific Power of BH Fan:2.74
KWH/MT Clinker.
After Modification:
June-2018 Specific Power of BH Fan:2.48
KWH/MT Clinker.
Power Saving:
1. 0.26 KWH/MT of Clinker.
2. BH Fan Power Earliear:549.46 KWH.
3. BH Fan Power After:489.74 KWH.
4. Saving:59.72 KWH.
Trusted Technology – Solid Strength
Investm
ent:
---
ZE
RO
--
-
Trusted Technology - Solid Strength
1. Feasibility study conducted & Techno – economic feasibility reportsubmitted by Ms. Holtec for WHR system for line 1,2,3 & 4.
2. Increase in injection of Limestone % from 4% to 4.5%.
3. Use of 1.5% CPP bed ash in clinker coolers.
4. Up gradation of Unit -1 cooler.
5. Use of Membrane bags in all Bag filters.
6. Replacing all motors by Energy Efficient Motors.
7. Few more Installation of Wind mills at Out let of Bag filters.
8. Planned for solar project of 5 MW, under advanced stage.
9. Use of Day light Pipes wherever possible.
10. Use of Turbo Ventilators for TG Building of CPP.
5.1 Projects in Pipe Line
Trusted Technology - Solid Strength
Trusted Technology - Solid Strength
* Presently adding 4.5% of PI in cement mills without any modifications in circuit, and the quality is maintained well under specified BIS limits.
Trusted Technology - Solid Strength
•Efficient planning, regular monitoring and effective implementation during use of pet coke, led to achieve lower values of sp. Fuel kcal.kgclk
Trusted Technology - Solid Strength
* Less PPC production as compared to AOP value, because of market requirement.
Trusted Technology - Solid Strength
*For 2016-17 fly ash added 33.5 % , due to trial of Premium Cement (18 %) Average dropped to 33.24 %)
• 100 % utilization of fly ash & Bed Ash from CPP.
• R&D at P&QC Ensures Consistent quality.
Trusted Technology - Solid Strength
IS/ISO 9001/2008 IS/ISO 14001/2004 IS/ 18001/2007
ISO / 50001:2011
IMPLEMENTATION OF BEST PRACTICES
Trusted Technology - Solid Strength
Tool Box TalkAt each day start sectionengineer will conduct dailytool box talk for allworkmen reportingconcerned section. Speciallyfocusing on the personsafety, equipment safety,permits required, SOP willalso discuss in this tool boxtalk.
Trusted Technology - Solid Strength
Task observationTo evaluate the knowledge and safe/ correct procedureof working we carry out Task observation of workmen,staff etc. This is being carried out by• Giving information to the workmen that task
observation being done for particular activity. Aftercompletion mistakes done are informed to workmenfor improvement.
• Without giving information to the workmen that taskobservation being done for same activity. Aftercompletion mistakes done are once again informed toworkmen for improvement.
Trusted Technology - Solid Strength
Permits before starting any work (Height permit, Hot permit, confined areapermit etc)As a slogan “Safety first work next” many permits are being taken before starting of work.
In which special works are acknowledge to HOD with authorize signatory in the formats andsame is crossed checked with safety department and if required safety steward will bedeployed for the task.
Implementation of SOPs for each and everyactivity.For each activity SOP is generated like welding,cutting, hammering, belt replacement etc. thesespecific SOP are informed to workmen duringdaily tool box talk and implemented.
Regular Health checkups.Yearly health checkup is being done for each andevery employee of the plant. Also specialist fromthe various hospitals will visit to check the healthof the employee.Special health related seminar is also beingconducted by specialists.
Trusted Technology - Solid Strength
Maintenance Practice(Preventive/Proactive/Condition Monitoring)
Preventive maintenance:Daily Check list :• Each and every Section has its own equipment wise
daily checklist.• Section technician (Fitter) will take that hard copy
and checks all the equipments as per the check list. • Observations are entered in the remark column of
the check list along with target date of completion. • Minor problems are rectified in same day itself.• Other major and critical problems are being rectified
in weekly maintenance stoppages and in major shutdowns.
We are having preventive, predictive and corrective maintenance system at Vasavadatta cement with help of Equipment Asset life Cycle management (EAM) as per the ISO-9001 systems.
Trusted Technology - Solid Strength
Condition Based Maintenance:
• Oil analysis for all Hydraulic systems and Critical Gear box oils.
• Vibration measurement and spectrum analysis for all critical rotating
equipments.
• Thermography for Preheater cyclone ducts / feed chutes.
• Thermography for cable cellar / critical equipments / Electrical panels
• Ultra sonic thickness testing for all ducting / kiln shells/ Chimneys /
hoppers.
• UT /NDT test for all critical equipment shaft’s for crack detection
• Ultra sound leakage detection.
• Vediography of enclosed gear boxes auto garage engines.
Trusted Technology - Solid Strength
Annual shut down planning:-• Major annual shutdown for 10 to
15 days is being planned for eachand every section.
• Bar chart for individual jobs areprepared which indicatesresponsibility, material status andmanpower status andimplemented.
• After completion of theShutdowns a Review bar chart isbeing prepared for theimprovement.
Trusted Technology - Solid Strength
Corrective maintenance system: To avoid repetitive and design related problems, matter is taken up with OEM/ OPM for modifications to overcome the said problems. Modifications were carried out accordingly • Raw Mill Polycom Bearings Modification• Raw Mill Polycom Shaft• Mines Crusher Anvil block replacement arrangement.• Mines Crusher hammer Metallurgy.Why-Why analysis for Breakdown: To avoid repetitive breakdowns, why-why analysis is being carried out for each and every breakdown to find the root cause of the problem and get is signed by higher authorities.
Trusted Technology - Solid Strength
OtherTo monitor and enhance the performance of plant various cross functional teams, audits, meetings committees are formed.• Scrap Management committee• Structure audit committee• Bill checking committee.• Re processing committee.• Idle running of equipments• Truck turn over time system. • Bag weighment committee
Trusted Technology - Solid Strength
Employees and team work1. Suggestion Scheme
2. Brain Storming
3. 5s Activity
4. Kaizen Mela
5. Fugai Finding
6. Leakage Detection
Leakage Detection Area Points Detected Points Attended
Power Plant 1110 1002
Cem Mills and Pack Plant
980 948
Crusher 520 482
YearTotal
SuggestionsSuggestions
ImplementedSuggestions
Rejected
2014-15 580 318 70
2015-16 599 451 101
2016- 17 685 414 23
2017-18 860 838 22
YearNo Of
Kaizens Registered
No Of Kaizens Completed
No.of Best Kaizens
2014-15 463 451 54
2015-16 563 497 57
2016-17 613 542 56
2017-18 684 666 62
• Energy Conservation week.
• Door to Door campaign.
• Distribution of pamphlets.
• Organizing Competitions.
• Training class to near by villages
• No Vehicle Day Celebration
• Safety Gate Meeting.
• Attending all External Trainings
Trusted Technology - Solid Strength
As per the practices, ‘No
Vehicle Day’ is being
organized on first day of
every month. Employees
will not bring their vehicle
to the plant on this day. For
the month, Safety Pledge
will be taken by all the
employees, near miss
incidences / safety
suggestions given are
awarded for employees,
contract labourer’s, etc.
Our HMO, Dr. CKJain,
addresses the gathering.
Employees, Contract
Labourers and HOD’s
participates in the event.
No Vehicle Day
Implementation of 6S.
We have adopted 6S concept from pastone quarter a committee is formed withdifferent sub committees in whichinvolvement is taken to implement areaslike department offices, site offices, mainand sub stores, yards etc. In whichsymmetrical way to maintain aforesaidareas. In this drive there are manyoutcomes in visuals, housekeeping, propertracking of spares at site etc where activityis carried out like sorting, setting in order,Shining, standardizing, sustain and safety.
Trusted Technology - Solid Strength
Trusted Technology - Solid Strength
“SWACHH VC ABHIYAN” SHE Pillar
Trusted Technology - Solid Strength
ENERGY CONSERVATION WEEK -2017
ENERGY CONSERVATION RALLY
Yearly Kaizen Mela Celebration held on 21st December 2016
Trusted Technology - Solid Strength
2018-19 1st QUARTER KAIZEN MELA CELEBRATION
KAIZEN MELA IS CELEBRATED 4 TIMES EVERY YEAR EACH AT THE END OF
EVERY QUARTER.
Trusted Technology - Solid Strength
WORKSHOP – ‘AVISHKAR’
We have organized Workshop on various subjects / events like, Mime, Yoga, Dance Drama Valmiki Pratibha –Manipuri, Dance Drama – Valmiki Pratibha – Chaou, Chaou Mask Making, Eco-Craft – craft with waste materials, TheArtful Adventure – unconventional painting methods, Fashion & Styling, Cooking and Western Vocal. Employees &their family members (including Children) were the participants. The team from M/s. Swarsangam Kolkatta wereconducted classes on each subjects / events. A mega event viz ‘Avishkar’ was organized in the evening wherein theparticipants exhibited their talents which they learned during the classes. Employees & their family members wereinvited to witness the function.
The programme was unique in nature which was well received and enjoyed.
Trusted Technology - Solid Strength
Continuous Increase of Blended Cement share in total production shows our eco- friendly nature.
35.0 % of fly ash injection is achieved by continuous trials in our Laboratory and by Installing Roto
Scale for Accurate Feeding.
Addition of performance improvers in cement, resulting in fuel and natural resources conservation.
Hot Disc Installed at Unit -3 Pre heater, First in India, to consume wastes like Tyre , Paper , plastic ,
Coconut shell, and Segregated Municipal waste.( Full Fledged AFR feeding system at Unit -4 PH to
consume more and more AFR is under progress)
Lab trials for composite cement is being taken, which can reduce clinker factor drastically.
First Cement Plant to Participate in GREENCO rating Project actively conducted by M/s CII and
awarded as First GREENCO PLATINUM cement company in India.
Our Commitment Towards Green Tomorrow
Trusted Technology - Solid Strength
Recognitions and Awards by Government and other Organizations
LIST OF AWARDS:-
Trusted Technology - Solid Strength
SNo. Description of Awards Month/Year
1
Global Achievers Foundation International Gold Star Award For Industry Development Certificate of Excellence
Dr. Chander Kumar Jain For Outstanding Achievements In Chosen Field of Activity On the Occasion of
International Summit on Globalization of Economic & Social Development on 24th July 2017 at Mauritius
24th JULY 2017
2
Vasavadatta Cement have participated in 18th National Award for Excellence in Energy Management 2017. It was
3 days conference attended and presented by around 1000 participants from 200 companies across the sector
and across the country. We have also made our presentation and Vasavadatta Cement have been categorised
as Energy Efficient Unit and received Award for the same. Trophy and Certificate have been handed over to us
by Mr.Ajay Mishra, Special Chief Secretary Energy Sector, Govt. of Telangana, Mr.L.S.Ganapati, Chairman,
National Award Scheme, Mr.Ravichandran Purushottam, President, BANFOSS and other dignitary.
1st September 2017
3
Received ‘Unnatha Suraksha Puraskar’ Award from National Safety Council Karnataka Chapter on 9th Sept 2017
at Bangalore. A top most state level safety award under large scale industries category. Award was given by
Honourable Directorate of Factories and Boilers (Health & Safety Department) Karnataka State, Secretary-
National Safety Council-Karnataka, Chairman-National Safety Council-Karnataka and Deputy Chairman-National
Safety Council-Mumbai.
9th September 2017
4
Highest Achiever Award in Energy Savings for PAT Cycle I from Bureau of Energy Efficiency (BEE), Min. of
Power, Govt. of India. The Shield is presented by Shri. Abhay Bakre, Director General, BEE along with Dr.
George Maue, Head of Energy Efficiency (BMWI), German Federal Ministry for Economic Affairs and Energy in
the presence of Dr. Winfried Damm, GIZ at New Delhi on 14th December, 2017.
14th Dec’2017
5
Our Vasavadatta Cement unit has been declared as 5 Star Mines by Indian Bureau of Mines (IBM). Myself and Mr.
Rajesh Garg have received the Award in 3rd National Conclave on Mines and Minerals held at New Delhi
today. The award was given in the presence of Union Minister for Mines, Mr. Narendra Singh Tomar, Mr.
Haribhai Parthibhai Chaudhary, Minister of State for Mines, Mines Secretary, Mr. Arun Kumar, DSO Mines, Addl.
Secretary Mines, OSD, President & Secretary of FIMI
20TH March’2018
5
On 24th March ’18, Vasavadatta Cement hosted 47th National Safety Day Celebration by KRISC at SRC Ground.
Chief Guest, Mr. Manjunath Director DFBISH govt of Karnataka, Guest of Honour, Mr. DC Jagadish Joint
Director, DFBISH, Ballary & Convenor Mr. R.K. Parthasarathy DY Director of factories Kalaburagi division were
present along with all other neighbouring Industries Plant Heads. VC received zero fatal, longest injury free days
and Best HSE monitoring system award from Chief Guest.
24th March’2018
Trusted Technology - Solid Strength
SNo. Description of Awards Year
1 Federation of Indian mineral Industries have selected for Abheraj Baldota Environment Award (FIMI
Environment Award for the year 2015-16) for our Injepally mines. During desk top assessment, four
Mines were short listed for this award, out of which our Mines got winner award at all India level in the
category of large mechanised open cast mines. Award function will be in the month of October at Delhi
and shield will be given by some Union Minister. In the year 2012 we received similar award.
Oct 2016
2 QUALITY CIRCLE FORUM OF INDIA HYDERABAD CHAPTER In Collaboration
With CMA & NCCBM Is Pleased To Present This Award Is VASAVADATTA CEMENT
–SEDAM For Their Contribution To Best Practices In “CEMENT INDUSTRY’’ National
Cement Conclave 21st Oct 2016 At HICC Hyderabad.
21st Oct 2016
3 Felicitation function at bangalore organised by ministry of mines. Mr.Balbinder singh, mines secretary,
& mr.Subhash chandra joint secretary, ministry of mines, mr.R.K.Sinha, controller general , southern
zone indian bureau of mines, and other officials were present. All the mines in karnataka, goa and
tamil nadu having 4 star and 5 star rating were felicitated. The function was arranged in traditional
karanataka way by presenting shawl, mysore peta, fruits and garland .
2 November 2016
4 Vasavadatta Cement Have Received `SILVER’ MERIT CERTIFICATE In MANUFACTURING
EXCELLENCE CATEGORY In A Function Held On 9th December 2016 At Hyatt Regency, Mumbai
9th December 2016
5 VC have bagged awards in all discipline which were given at the valedictory function held on 18th Febon
the eve of “Productivity Week celebrations” organised by Andhra Pradesh Productivity Council (APPC) at
Hyderabad on 9th Feb. 2017.
18th Feb 2017
6 KRISC Function under the aegis of Deputy Director of Factories Kalaburagi Region was held on
25th March 2017 at Ultratech Cement-Malkhed. VC won various prizes in various category of
competition
25th March 2017
Trusted Technology - Solid Strength
SNo. Description of Awards Year
7 On June 16th 2016 Our Company got Green-Co Platinum Rating Award given by, Mr.Nittin Desai, Member
Council of Prime Minister Panel on Climate Change , along with dignitaries. Mr Pradeep Bhargava, Chairman,
CII Greenco rating system, Mr K S Venkatagiri, Executive Director, CII-Godrej GBC Mr Pradeep Banerjee,
Executive Director, – Supply Chain, Hindustan Unilever, Mr Sanjay Singh, Co-Chairman. Greenco Forum,
Smt.Shobana Kamineni ,President Designated CII and Ex- Chairperson Apollo Hospital. 5th Edition Greenco
Summit 2016 function held today at Hyderabad
16th June2016
8 Received Rising Star Of Asia Award Certificate Of Excellence Dr. Chander Kumar Jain
by H.E.Mr.Jayant kotobragade ambassador of India Bishkek (Kyrgyzstan) for outstanding
achievements in chosen field of activity on 21st May 2016.
21st May 2016
9 We received award and appreciation certificate for Green-Co Best Practices held on 15 june 2016 at
Hyderabad. for the Topic “GHG Emission Mitigation “Awards was given by Mr.Nitin Desai , Council
Member of Prime Minister Panel on Climate Change , along with dignitaries Mr Pradeep Bhargava,
Chairman, CII Greenco rating system, Mr Sanjay Singh, Co-Chairman. Greenco Forum, Mr.Jamshed
Godrej , Chairman CII – GBC and L.S.Ganapathi, Chairman Energy Efficiency CII .
15 June 2016
10 Our Mines got 5 star rating . Shield is given by Union Minister for steel and Mines ,Mr.Narendra Singh
Tomar and Chhattishgarh Chief Minister Dr. Raman Singh at Raipur on dated 4th July 2016. Only VC
Mines got 5 star rating in Karanataka Award receiving Photographs along with Shield is enclosed
4th July 2016
11 Kesoram Industries Ltd Unit Vasavadatta Cement have been rated and Awarded as "17th Excellent EnergyEfficient unit 2016" and our CPP is rated and awarded as "Energy Efficient powerplant" Trophy andcerticicate is being given by CII President designate Mrs Kamnani, Vice Chairperson ApolloHospital, Chairman Den Foss , Vice Chair Person Thermax, and President CII south were amongDignitaries giving Awards at Hyderabad
24th Aug 2016
12 National level competition for Excellence in Water Management 2016 organised by Confederation of
Indian Industry. our Company has been identified as `Noteworthy Water Efficient Unit in “Within the
Fence “ Category and Certificate given in Award ceremony held on 27th September 2016 at Hotel Le-
meridien, New Delhi. Ours is the only cement Unit got this Certificate.
27th Sept 2016
Trusted Technology - Solid Strength
SNo. Description of Awards Year
13 Indian Organisation for Commerce and Industry have given me `BHARAT NIRMAN AWARD’ for talented personalities for individual contribution for Social & Economic growth. The Award was given by Mr.Joginder Singh, former CBI Director on the occasion of National Seminar held on 10th
August 2015 at New Delhi.
10th August 2015
14 Indian Solidarity Council (I.S.C) have honoured me with Prestigious
`RAJIV GANDHI SAMMAN PURASKAR AWARD’
The Award was given by Dr. Bhisham Narayan Singh, Former Union Minister of Parliamentary Affairs
& Former Governor of Assam & Tamil Nadu, Dr.G.V.G.Krishnamurthy,Former Chief Election
Commissioner, Justice O.P.Verma, Former Governor of Punjab and Mr.O.P.Saxena, President, All India
Lawyers’ Forum, on the occasion of National Seminar held on 12th August 2015 at New Delhi.
12th August 2015
15 16th National Award For Excellence In Energy Management-2015
Kesoram Industries Ltd (Cement Division) &(Cement Division-Power Sector) Unit:Vasavadatta
Cement,Sedam
2&3 Sept 2015
16 VC got following awards which was given by Chief guest was Dy Director general of Mines safety (South Zone) organized at Kalburgi cement :a) Mine working - Ist Prize
b) Mine machinery management- Ist prize
c) Drilling, blasting loading and transportation 2nd prize
d) Safety management System
e) Worker got prizes in different trade test and 4 staff got prizes in quiz
competition and 1st aid.
22 NOV 2015
17 VC got 1st –Award for having best first aid and rescue system & 2nd best award for Safety Training Module in
45th National Safety Day Celebration under KRISD
29th March 2016
18 VC received Greenco Platinum certificate and shield on 12.05.2016. In Green Cementech Conference.
Award was given by CMA President Dr. Chouksey , others present on Dias were officials of M/s CII ,
Cement Industry , CMA secretary general.
12th May 2016
Trusted Technology - Solid Strength
SNo. Description of Awards Year
19 Indo-Nepal Friendship Award given by Economic and Human resource Development Association on the occasion
of Indo-Nepal Friendship Summit held on 2nd August’2014 at Kathmandu(Nepal)
Aug 2014
20 Greentech Safety Award in `Silver’ category for Vasavadatta Cement for the year 2013-14. The Award
was given on 13th Sep Novotel HICC at Hyderabad by Mr.Kamaleswar Sharan, President, Greentech
Foundation and Dr. Bhaskar Chatterjee, IAS (Retd) and Director General & CEO of Indian Institue of
Corporate Affairs, Ministry of Corporate Affairs-Govt. of India.
Sept 2014
21 VC have succeeded in getting `Excellent Energy Efficient Company’ Award for the year 2014 from
CII. The Trophy and Certificate were given by Dr.Pradeep, Special Chief Secretary, Commerce and
Industries, Government of Telungana and dignitaries of CII. 30.10.2014
OCT 2014
22 Received Silver Certificate of Merit award from The Economic Times India Manufacturing Excellence Awards 2014 in partnership with Frost & Sullivan. The awards function will be held at Mumbai in Trident, BKC, on 12th
December from 7:00 PM onwards.
DEC-2014
23 Received Silver Certificate Of Merit Award From The Economic Times India Manufacturing Excellence Awards
2014 In Partnership With Frost & Sullivan. We Have Received Certificate During The Award Function Held On
12th Dec. At Mumbai, Same Is Shared With You All.
12th Dec 2014
24 The Open International University for Complementary Medicines Colombo, Srilanka is organizing "HonoraryDoctorate Award" which will be held on 30 November , 2014 at The Bandaranaike Memorial InternationalConference Hall (BMICH) , Colmbo , Srilanka.
30 Nov-2014
25 On 8th February Global Achievers Foundation have organized International Achievers Summit in Bangkok atHoliday INN Hotel. Main Chief Guests were Ex-Deputy Prime Minister of Thailand and Retd. Ambassador forvarious countries Mr.Soni in addition to other prominent personalities. I have received Certificate and Trophy onthe occasion.
8th Feb-2015
26 Vasavadatta Cement have bagged 2nd Prize in the Category of Best fuel efficient boiler in the
State. The award is given by Government of Karnataka, State Safety Institute and Department
of Factories, Boilers, Industrial Safety and Health.
4th March-2015
27 On 11th –Feb 2015 we have received Award for Best “FIRST AID & RESCUE” Facility during KRISC
(Kalaburgi Region Safety Committee) Safety Day Celebration held at Chettinad Cement-Kallu
11th Feb-2015
Trusted Technology - Solid Strength
28 Safe Power Boiler Appreciation Certificate issued by Karnataka State Safety Institute and Dept. of Factories, Boilers,
Industrial Safety and Health, Bengaluru, Govt. of Karnataka on 4.3.2012
2012
29 National Safety Day – Low Accident Frequency Rate During the year 2011-2012. Award given by Asst Director of
Factories’ Gulbarga
2012
30 National Safety Day – Best Training Modules. Award -by Asst Director of Factories’ Gulbarga 2012
31 Excellent Energy Efficient Unit’ Award by Confederation of Indian Industry during Aug. 2012 @ Hyderabad 2012
32 National Safety Awards (Mines) for the year 2008, 2009 and2010. Awards were given by Hon. President of India on 21-11-
2012 at Vigyan Bhawan Delhi
2012
33 National Award for Excellent Water Efficient Unit 2012” by CII. Dec. 2012
34 State Level Safety Competition - First Prize in Best Safe Power Boiler category in the year 2012 by Karnataka State Safety Institute Mar. 2013
35 Greenco Gold Rating Award & Certificate issued during Function held at Hyderabad during 16 & 17th May 2013 by CII. May 2013
36 “Injepalli Limestone Mine” has been selected for 'Hindustan Zinc Environment Award' for the year 2012-2013 for its
outstanding environmental performance
June-2013
37 14th National Energy Award for Excellence in Energy Management 2013” conducted by CII held in Hyderabad on 19 & 20
August 2013
Aug. 2013
38 Environmental Best Practices Award 2013 by CII at Bengaluru on 28.11.2013 - Hot Disc Project has been rated as `Most
Innovative Environmental Project’ for 2013
Nov. 2013
39 Green Company of the Year 2013 in Cement Sector from KRDWG Jan. 2014
40 VC-Mines received various awards given by Sri .K. Thomas, Controller General (Incharge) and Sri S.Tiu, Controller of
Mines (South Zone) of Indian Bureau of Mines during Award distribution function held at Rajashree Cement on 30th March
2014
Mar. 2014
41 VC have been declared as winner in the Manufacturing category of the NDTV Grundfos Mission Energy
Challenge. Award Ceremony was held on 5TH June at New Delhi
June 2014
42 Sri. Chander Kumar Jain got selected for UDYOG VIBHUSHAN SAMMAN PURASKAR” by the Selection Committee of
Global Achievers Foundation. Award will be given on 12th June 2014 at New Delhi.
June 2014
Trusted Technology - Solid Strength
63Global Cement Award Lowest Specific Energy Consumption, Raw Meal Grinding -Second
2005
64Global Cement Award Lowest Specific Energy Consumption, Clinker Grinding – Third
2006
65Global Cement Award Lowest Specific Energy Consumption, Clinkerisation- Third
2006
66Global Cement Award Kiln Reliability- Honorable mention
2006
67CII-National Energy Management Award, Energy Efficient Unit
2006-07
68CII-National Energy Management Award, Energy Efficient Unit
2007-08
69Mines Environment Week – Top Soil Management – 1st Prize
2008
70Mines Environment Week – Dust Suppression arrangement – 1st Prize
2008
71Safety Week – In Drilling & Blasting --- 1ST Prize
2009
72Safety Week – Method working in Mines --- 2ST Prize
2009
73Mines Environment Week – Afforestation – 1st Prize
2010
74Mines Environment Week – Waste Dump Management- 1st Prize
2010
75Mines Environment Week – Top Soil Management
2010
76Mines Environment Week – Publicity & Propaganda – 1st Prize
2010
77Mines Environment Week – Overall Performance – 1st Prize
2010
78Mines Safety Week – Drilling and Blasting – 1st Prize
2010
79National Award by President of India - Lowest Frequency Rate in Category large Mechanised Mines for the year 2009 (Runner Up)
2010
80 “Excellent Water Efficient Unit – Within the Fence” at the 7th National Award for Excellence in Water management 2010 organised by
Chamber of Indian industries – Godrej Green Business Centre on 10 - 11 December
2010
81 Environment Excellence Award Karnataka State Pollution Control Board, during Sep. 2011. 2011
82National Safety Day – Low Accident Frequency Rate During the year 2010-2011. Award given by Asst Director of Factories’ Gulbarga
2011
83National Safety Day – Best First Aid & Rescue Facility Award -by Asst Director of Factories’ Gulbarga
2011
84 Injepalli limestone Mines bagged 1st Price in Drilling & Blasting, Environment & Health Management from Dy. Director General of Mines
Safety.
2011
85 Safe Industrial Boiler- 2nd Prize by Karnataka State Safety Institute & Department of Factories & Boilers, Government of Karnataka. 2011
Trusted Technology - Solid Strength
86 National Award for Second Best Improvement in Energy Performance from NCCBM & Ministry of Power. 1990-01
87 National Award for Best Improvement in Energy Performance from NCCBM & Ministry of Power 1991-92
88 National Award for Best Improvement in Electrical Performance from NCCBM & Ministry of Power 1991-92
89 Award for Outstanding Contribution towards Growth of Industries from Hyderabad Karnataka Chamber of
Commerce
1993
90 National Productivity Award from Hon’ble Prime Minister 1994-05
91 Environmental Award from Dept. of Ecology & Environment, Govt. of Karnataka 1996
92 National Award for Third Best Improvement in Energy Performance from NCCBM & Ministry of Power
1994-95
93 National Award for Best Improvement in Energy Performance from NCCBM & Ministry of Power 1994-95
94 Awards from Central Institute of Professional Management
1.Best Problem Solver in Technical Support
2.Best Case Study Presentation in Production
3.Best Theme under Production
4.Best Permanent Solution under Technical Category
1994
1994
1998
1998
95 Best Improvement in Thermal Energy Performance (line-II) Award from NCBM 2003-04
96 Second Best Environmental Excellence in Limestone Mines Award from NCBM 2004-05
97 CII-National Energy Management Award, Excellent Energy Efficient Unit 2004
98 CII-National Energy Management Award, Excellent Energy Efficient Unit 2005
99 Three Leaves (Rank 10) in the Green Rating Project of the Indian Cement Industry by Center for Science and
Environment2005
AWARDS / TROPHIES WON BY VASAVADATTA CEMENT
Trusted Technology - Solid Strength
Kesoram Industries Ltd has received Green Product Certificate for Birla Shakti PPC & Shakti Plus cement. The Award / Certificate was given by Mr. C. Sekhar Reddy, Chairman – IGBC, Hyderabad Chapter & Managing Director – CSR Estates Ltd. Mr. V. Suresh, Former CMD – HUDCO, Mr. Parasuraman, Chairman – Green Product & Service Council and CII Executive Directors were present. The Award / Certificate was received by Dr. Chander Kumar Jain, HMO & Mr. Vishal Khurma, CSMO at Hyderabad
GREENPRO CERTIFICATION
Trusted Technology - Solid Strength
Highest Achiever Award in Energy Savings for PAT Cycle I from Bureau of Energy Efficiency (BEE), Min. of
Power, Govt. of India. The Shield is presented by Shri. Abhay Bakre, Director General, BEE along with Dr.
George Maue, Head of Energy Efficiency (BMWI), German Federal Ministry for Economic Affairs and Energy in
the presence of Dr. Winfried Damm, GIZ at New Delhi on 14th December, 2017.
Trusted Technology - Solid Strength
Vasavadatta Cement have participated in 18th National Award for Excellence in Energy Management 2017. It was 3 daysconference attended and presented by around 1000 participants from 200 companies across the sector and across the country. Wehave also made our presentation and Vasavadatta Cement have been categorised as Energy Efficient Unit and received Award for thesame. Trophy and Certificate have been handed over to us by Mr.Ajay Mishra, Special Chief Secretary Energy Sector, Govt. ofTelangana, Mr.L.S.Ganapati, Chairman, National Award Scheme, Mr.Ravichandran Purushottam, President, BANFOSS and otherdignitary.
Trusted Technology - Solid Strength
Global Achievers FoundationInternational Gold Star Award For Industry Development Certificate of Excellence
Dr.Chander Kumar Jain For Outstanding Achievements In Chosen Field of Activity
On the Occasion of International Summit on Globalization of Economic & Social
Development on 24th July 2017 at Mauritius
Trusted Technology - Solid Strength
Vasavadatta Cements participated in the various competitions on the eve of“Productivity Week celebrations” organised by Andhra Pradesh ProductivityCouncil (APPC) at Hyderabad on 9th Feb. 2017. VC have bagged awards inall discipline which were given at the valedictory function held on 18th Feb.
92
VASAVADATTA CEMENT HAVE RECEIVED `SILVER’ MERIT CERTIFICATE IN MANUFACTURING EXCELLENCE
CATEGORY In A Function Held On 9th December 2016 At Hyatt Regency,
Mumbai
Trusted Technology - Solid Strength
Trusted Technology - Solid Strength
QUALITY CIRCLE FORUM OF INDIA HYDERABAD CHAPTER InCollaboration With CMA & NCCBM Presented this Award toVASAVADATTA CEMENT –SEDAM For Their Contribution To BestPractices In “CEMENT INDUSTRY’’ National Cement Conclave 21st
Oct 2016 At HICC Hyderabad.
Trusted Technology - Solid Strength
Federation of Indian mineral Industries have selected for Abheraj BaldotaEnvironment Award (FIMI Environment Award for the year 2015-16) for ourInjepally mines. During desk top assessment, four Mines were short listed for thisaward, out of which our Mines got winner award at all India level in the categoryof large mechanised open cast mines. Award function will be in the month ofOctober at Delhi and shield will be given by some Union Minister. In the year2012 we received similar award.
Trusted Technology - Solid Strength
National level competition for Excellence in Water Management 2016 organised byConfederation of Indian Industry. our Company has been identified as `Noteworthy WaterEfficient Unit in “Within the Fence “ Category and Certificate given in Award ceremonyheld on 27th September 2016 at Hotel Le-meridien, New Delhi. Ours is the only cementUnit got this Certificate.The Award was given by Sri. Anil Kakodkar , Scientist in Bhabha Atomic Research (SecondPerson in India who is awardee of Bharat Ratna, Padmabhushan and Padmavibhushan)Devesh Mishra, Vice President (Mechanical) and Mr.Uday M, DGM-PQC received theCertificate on behalf of the company.
Trusted Technology - Solid Strength
Kesoram Industries Ltd Unit Vasavadatta Cement have been rated and Awarded as 17th National Award for“Excellent Energy Efficient unit 2016" and our CPP is rated and awarded as "Energy Efficient Power Plant"Trophy and certicicate is being given by CII President designate Mrs Kamnani, Vice Chairperson ApolloHospital, Chairman Den Foss , Vice Chair Person Thermax, and President CII south were amongDignitaries giving Awards at Hyderabad
Trusted Technology - Solid Strength
Trusted Technology - Solid Strength
On June 16th 2016 Our Company got Green-Co Platinum Rating Award given
by, Mr.Nittin Desai
Trusted Technology - Solid Strength
Received Rising Star Of Asia Award Certificate Of Excellence. Dr. Chander Kumar Jain by H.E. Mr.Jayantkhobragade ambassador of India Bishkek (Kyrgyzstan) for outstanding achievements in chosen field ofactivity. Individual contribution for national integration & world peace by Indian organization forcommerce and industry on 21st May 2016 at Bishkek Kyrgyzstan.
Trusted Technology - Solid Strength
Excellent In Energy Efficient Unit Award-2015
Trusted Technology - Solid Strength
Excellent In Energy Efficiency 2014
Trusted Technology - Solid Strength
Excellent In Energy Efficient Unit Award 2013
Trusted Technology - Solid Strength
CII GREENCO GOLD Rating Shield given by Hon’ble Ex-President of India for
Vasavadatta Cement on 16th July 2013 at PUNE
Still Long way to go …………. Let us Start now with new Aim