Supervision of Foundation Works

Chua Tong Seng14th December 2011

1

Teamwork: QP-RE-RTO

2

DTL

MCEKPE

KPE-C424KPE-C423LTA

Understanding Soil Condition

DSTA,2009

3

Bukit Timah Granite Formation

4

Bkt Timah

Granite

Kallang FormationMarine Clay

UMC

LMC

Dr.Poh, TY

5

UMC

LMC

6000 years ago

E , F1 and F2

Fluvial Clay, F2

Estuarine Deposit, E

Estuarine Deposit, E

6

Fluvial Sand, F1

Old Alluvium Formation

K.W.Lee,2010

7

Sandy CLAY

Clayey SAND

Jurong Formation

Syncline

JF@Buona Vista

Geological Time, Kimura, 2011

8

Limestone Formation

Jeyatharan et al, 2003

Vietnam,Yashuda, 2011

9

?

Fort Canning Boulder Bed, FCBB

Shirlaw et al, 2003

10

LONGITUDINAL SECTION

Types of Foundation

11

Classification of Piles

End Bearing and Friction Piles Replacement,

Displacement or Low-displacement?

12

Bored Piles in Singapore

GBH

13

Sequence of Construction

14

B

Keep Accurate Installation Records

• Soil Description

• Dry hole or tremie concreting

• Stabilisation method

• Length of temporary steel casing

• Duration of drilling

• Record of anomaly, like hole

collapse

• Pile concreting record

15

Collection of Representative Samples

Collection of samples for various depths and different soil/rock layers Which sample do you choose?

16

Construction Problems

17

Chua, 1999

Stabilising Fluids

Bentonite suspension

Polymer suspension

18

Marsh Funnel

Mud Balance

Construction tolerance: VerticalityCaliper Logging (Koden)

• Singapore Standard

CP4:2003, Code of

Practice for

Foundations

1:75

Kelly Bar

Loadtest,2011

Bauer,2011

19

Eccentricity

20

Where is the centre of pile ?

75mm

Time-Lag before Concreting

CP4:2003 Code of Practice for Foundation

• The time interval between completion of the

formation of the borehole and commencement

of concreting should be minimised as ground

will deteriorate with time

21

Checking Base of Pile

LCH,2011

22

Imperfection: Soft Toe of Pile

23

Type of Rock at Founding Depth

24

Slake Tests

Case 1 Case 2

25

Reinforcements of Bored Pile

CP4: 2003, Foundations

• CP4: compression min main

reinforcement 0.5% of Ac

and not less than 10m long

below pile cut-off level

• For tension , full cage

• For pile within excavation,

reinforcement should be

adequately provided for

bending moment.

BS EN 1536:2000, Bored Piles

• Piles should be reinforced

over any length through

soft or loose soil

26

Barrette Piles

BS EN 1536:2000

Dr. Yet,N.S., 2010

27

Driven Piles

Pile Driver Pile Segments

28

Common Problems with Driven Piles

Piles shorter than design

• Driving energy less than

required i.e. low hammer

efficiency or soft cushion

• Soil strength higher than

anticipated

Piles longer than design

• Driving energy higher than required

• Soil resistance lower than anticipated

• Additional piles to compensate weaker soil i.e. due higher negative skin friction, nsf ?

• Overstressing, yielding of piles?

29

Overstressing of Steel Piles

30

HKFellinius, 1986

Type of Pile Load Test

Ultimate Load Test

• Verification of design

• Conducted to 2.5 to 3.0

times working load, or

failure

• Instrumented to determine

skin friction and end

bearing

Working Load Test

• Quality control test for

assessment of workmanship

• Tested to 1.5 to 2.0 times

working load

• Randomly chosen from

among working piles, not

pre-selected

31

(Dr. Yet NS, 2011)

BCA/IES/ACES Advisory Note 1/03 on

Load Tests and Schedule

32

Method of Pile Load Tests

Kentledge Method O-Cell

33

Foo HK,2011

Dynamic Pile Testing

High Strain Pile Dynamic Test, PDA Statnamic Test

34

Pile Intergrity Testing

Cross-hole Sonic Logging Low Strain Hammer Test

35

Guidelines for Pile Load Test using Kentledge

• Key points

� Design by PE

� Kentledge weight at least 110% of max test load

� Supervise by PE and QSS

� Design to Codes and prepare Drawings to communicate design intent

� Construction to follow design Drawings

� Instrumentation and monitor stability

� All to observe WSHA

36

Workplace Safety & Health Act, WSHA

• An ACT relating to safety, health and welfare of persons at work in workplaces

• WSH(Construction) Regulations 2007

– Piling works

– Reg. 129 Stability of adjacent structures

– Reg. 130 Inspection

– Reg. 131 Pile driver not in use

– Reg. 132 Pile testing

– Reg. 133 Footing

Lim Shiyi, 2011

37

Source of Specification

• Projects Technical Specification

• Code of Practice SS CP4:2003 Foundation

• Code of Practice SS515:2005 Supervision of Structural Works

• Code of Practice BS EN– BS EN 1536:2000 Execution of special geotechnical works –

Bored piles

– BS EN 12699:2000 Execution of special geotechnical works –Displacement piles

– BS EN 14199:2000 Execution of special geotechnical works –Micropiles

38

Conclusion

• Good for QP-RE-RTO to cultivate goodcommunication links. QP to disseminate keydesign requirements and RE-RTO to feedback onsite observations i.e. unexpected soil condition atthe site

• RE-RTO contributions are very important

• All should be familiar with relevant Codes

• Works as a Team. If there is any incident, the lineof responsibility will become irrelevant as allmembers in the team will be affected in one wayor another.

39