    Er Dr Yet Nai SongBuilding and Construction Authority

    Requirements on piling plan

    submissionUnder BC (Amendment) Act 2007 & Regulations 2008

  • 5/22/2018 Piling Requirements

    2/80

    2

    Types of piling submissions

    Bored cast-in

    place piles

    Barrettes

    Grouted

    micropiles

  • 5/22/2018 Piling Requirements

    3/80

    3

    Types of piling submissions

    Driven piles

    Jacked-in

    piles

  • 5/22/2018 Piling Requirements

    4/80

    4

    Objective

    To help Qualified Persons whoprepare the piling plans to

    comply with requirements of

    BC (Amendment) Act 2007 &

    Regulations 2008

  • 5/22/2018 Piling Requirements

    5/80

    5

    Overview1. Submission checklist

    2. BC Regulations 10(2)

    3. SS CP4 : 2003

    4. BCA / IES / ACES Advisory Note on

    Site investigation & Load test

    5. Piling Annexes B, C, D

    6. Good practices in design & construction

  • 5/22/2018 Piling Requirements

    6/80

    6

    (1) Submission

    checklist

  • 5/22/2018 Piling Requirements

    7/80

    7

    Submission checklistI. Piling plans endorsed by QP and AC

    II. Design reports by QP and AC

    III. Declaration forms by QP and AC

    IV. Site investigation report, endorsed & certified by a PE

    V. A plan showing the layout and location of the site, boundaryline and neighbouring buildings

    VI. Impact assessment report, where applicable (eg. for

    foundations located within influence zone of sensit ive

    structures, like MRT or CST tunnels)

    VII. Clearance letters, where applicable, from the relevant authority

  • 5/22/2018 Piling Requirements

    8/80

    8

    Certifications by QP and AC on plans

    AC

    PE

  • 5/22/2018 Piling Requirements

    9/80

    9

    Certif ications by QP(geo) and AC(geo) on plans

    AC(geo

    )

    PE(geo)

  • 5/22/2018 Piling Requirements

    10/80

    10

  • 5/22/2018 Piling Requirements

    11/80

    11

    Certification by

    PE for SI report

  • 5/22/2018 Piling Requirements

    12/80

    12

    Plan to show Site LocationPlan to show Site Location

    Proposed Construction SiteSyedA

    lwiRd

    DeskerRd

    Jala

    nBes

    ar

    site

    Serango

    on

    Road

  • 5/22/2018 Piling Requirements

    13/80

    13

    An example of project close to sensitive structures

    CST

    tunnel

    Pile Raft for a 66-storey building

    PUB

    drai

    n

    MRT

    statio

    nCST

    tunnel

    MRT lines

  • 5/22/2018 Piling Requirements

    14/80

    14

    (2) Building ControlRegulation 10(2)

  • 5/22/2018 Piling Requirements

    15/80

    15

    Regulations 2003Regulation 10(2)

  • 5/22/2018 Piling Requirements

    16/80

    16

    Regulations 2008

    Regulation 10(2)

    the estimated pile penetration depth for each design zone ;

    the location of piles and site investigation boreholes ;

  • 5/22/2018 Piling Requirements

    17/80

    17

    Regulations 2008 Reg 10A(5)(Plans of foundation 30storeys)

  • 5/22/2018 Piling Requirements

    18/80

    18

    Building Control Regulations 2008Regulation 10(2)

    the estimated pile penetration depth for each design zone ;

    the location of piles and site investigation boreholes ;

  • 5/22/2018 Piling Requirements

    19/80

    19

    (a) Pile type & material specification, pilejoints, sectional details

    I. Do the plans show the pile types and material specification ?

    II. Do the plans show pile size and pile details?

    III. Do the plans show the pile capacity ?

    (i) allowable foundation capacity, before and after accounting

    for negative skin friction,

    (ii) allowable tension load, lateral load, where applicable.

    Items to be shown on piling plan

  • 5/22/2018 Piling Requirements

    20/80

    20

    Pile capacity & Pile reinforcement

    Pile diameterWorking load

    Pile reinforcement

  • 5/22/2018 Piling Requirements

    21/80

    21

    Details of PilereinforcementAnchorage length

    Lap length

    Full depth cage /12m cageSectional details

  • 5/22/2018 Piling Requirements

    22/80

    22

    Details of RC pile

    Sectional detailsJoint details

    Pilecap connection details

  • 5/22/2018 Piling Requirements

    23/80

    23

    (b) Site investigation borehole

    I. Do the plans show location of site

    investigation boreholes?

    II. Is there any borehole within the footprint ofeach block ?

    III. Do number of boreholes exceed minimum ?

    IV. Is depth of any borehole beyond proposedpile penetration depth ? (see BCA/IES/ACES

    advisory note 2003)

    Items to be shown on piling plan

    For buildings of 10-storeys or more

  • 5/22/2018 Piling Requirements

    24/80

    24

    Site investigationboreholes (1)

    Footprint of

    tower block

    Total = 5 boreholes

  • 5/22/2018 Piling Requirements

    25/80

    25

    Total = 10 boreholes

    Site investigation

    boreholes (2)

  • 5/22/2018 Piling Requirements

    26/80

    26

    Site investigation boreholes (3)

    Total = 26 boreholes

  • 5/22/2018 Piling Requirements

    27/80

    27

    (c) Pile depth & (d) Pile founding criteria

    I. Do the plans show pile design zones (based on

    site investigation information) ?

    II. Do the plans show the following information ?

    (i) pile founding criteria (eg. pile founding depth /minimum embedment into competent stratum / pile

    set criteria / magnitude of jack in load)

    (ii) a description of soil / rock for founding layer.

    Items to be shown on piling plan

  • 5/22/2018 Piling Requirements

    28/80

    28

    Pile design zones based on boreholes

  • 5/22/2018 Piling Requirements

    29/80

    29

    Example 1

    Pile founding criteria (in hard soil)

  • 5/22/2018 Piling Requirements

    30/80

    30

    Example 2

    Pile founding criteria(in hard soil & rock)

  • 5/22/2018 Piling Requirements

    31/80

    31

    Example 3

    Pile founding criteria (pile set)

  • 5/22/2018 Piling Requirements

    32/80

    32

    (e) Geotechnical parameters

    I. Do the plans contain unit shaft friction and unit

    pile base resistance used for pile design ?

    II. Are soil strata / rock type given for the above ?

    Items to be shown on piling plan

  • 5/22/2018 Piling Requirements

    33/80

    33

    Unit shaft friction & base resistanceused in pile design

  • 5/22/2018 Piling Requirements

    34/80

    34

    (f) Negative skin friction

    I. Is there a design evaluation of the

    possibil ity of negative skin fr iction ?

    (i.e. whether the soil is sti ll undergoing

    consolidation at its final stress state ?)

    II. Has negative skin friction been considered

    in the design ?

    Items to be shown on piling plan

  • 5/22/2018 Piling Requirements

    35/80

    35

    (g) Allowable settlements

    I. Are allowable total and differential foundation

    settlements shown on plan ?

    II. Are these allowable foundation settlements

    consistent with the design calculation ?

  • 5/22/2018 Piling Requirements

    36/80

    36

    Sample variation of building settlementwith time during superstructure erection

    Settlement increases with building height.

    10th 1.5mm

    20th 3.0mm

    30th 4.5mm

    40th 6.5mm

    43rd 8.0mm

  • 5/22/2018 Piling Requirements

    37/80

    37

    (h) Vibration limits

    I. Are allowable vibration limits specified on

    the plan ?

  • 5/22/2018 Piling Requirements

    38/80

    38

    DIN 4150 : Part 3 Structural vibration in

    buildings Guideline on Limit of vibration

    Type 1

    Type 2

    Type 3

  • 5/22/2018 Piling Requirements

    39/80

    39

    (i) Verification testsI. Do the plans contain the following information ?

    (i) number of tests,

    (ii) types of pile tests.

    II. Are types and number of tests provided complied with

    BCA/IES/ACES advisory note 2003 ?

    III. Is location of ultimate pile load test shown on plan, andcorrelated with borelog ?

    IV. Will the preliminary piles for the ultimate pile load test be

    instrumented, to verify the geotechnical parameters ?

    (Applicable to piles where strain gauges could be installed

    along the pile, eg. bored piles, hollow spun pile)

  • 5/22/2018 Piling Requirements

    40/80

    40

    2ULT+5WLT+9PDA

    Exceededminimum!

  • 5/22/2018 Piling Requirements

    41/80

    41

    Preliminary pile to be instrumented

  • 5/22/2018 Piling Requirements

    42/80

    42

    Items to be shown on pil ing plan

    a) Pile type & material specification,

    pile joints, sectional details

    b) Site investigation boreholes

    c) Estimated pile length for each

    design zone

    d) Minimum embedded depth into

    competent stratum

    e) Skin fr iction & End

    bearing for pile design

    f) Pile capacity before &

    after negative skin friction

    g) Allowable settlements

    h) Allowable vibration limits

    i) Pile load test & location

    Arecap

  • 5/22/2018 Piling Requirements

    43/80

    43

    (3) SS CP4 : 2003

    (Code of Practice for Foundations)

  • 5/22/2018 Piling Requirements

    44/80

    44

    Code of Practice

    CP4 : 2003

  • 5/22/2018 Piling Requirements

    45/80

    45

    Design for pile foundations

    [CP4 Clause 7.3.1]

    Every pile design has to satisfy 3 conditions:

    1. Adequate safety factor against failure

    2. Settlement of foundation under working

    load should not affect the serviceability ofstructure

    3. Safety of nearby buildings should not be

    put at risk

  • 5/22/2018 Piling Requirements

    46/80

    46

    Pile Group Effect

    (CP4 Clause 7.3.4)

    I. Group settlement is

    greater than

    settlement of

    individual pile

    II. Differential

    settlement between

    two pile groups

  • 5/22/2018 Piling Requirements

    47/80

    47

    300 nos 1.8m

    piles within60mx60m

    footprint

    An example where pile group effect is dominant

    with overlapping of stress bulbs of individual piles

    Effect of lateral forces during basement excavation

  • 5/22/2018 Piling Requirements

    48/80

    48

    Effect of lateral forces during basement excavation

    (CP4 Clause 7.4.5.3.2)

    If bored piles are subject to lateral forces,

    reinforcement should be adequately

    provided for bending moments. to full pile length or

    to where bending moment is negligible.

  • 5/22/2018 Piling Requirements

    49/80

    49

    An example of effect of basementexcavation on foundation piles

    15m excav

    Marine clay

    Dwall GMP

    4 struts

  • 5/22/2018 Piling Requirements

    50/80

    50

    Table 1 Pile Ecc and Maximum Forces at Final Stage of Excavation

    Pile Position from Max ecc Max N Max BM Max SF

    Dwall [m] [mm] [kN] [kNm] [kN] Remarks

    L1 4 20 2029 615 -595 in GMP

    L2 12 18 1782 488 -346 in GMP

    L3 20 7 1753 229 -372 in GMPR1 4 36 2340 820 1030 in GMP

    R2 12 30 3592 -740 357 in GMP

    R3 20 24 3255 -645 236 in GMP

    Foundation piles move by 36mm, and

    experience bending moment of 820 kNm !

    Foundation piles should be designed for

    the effect of basement excavation.

  • 5/22/2018 Piling Requirements

    51/80

    51

    (4) BCA / IES / ACESAdvisory note

    (for buildings of 10-storeys or more)

  • 5/22/2018 Piling Requirements

    52/80

    52

    Requirements for Site Investigation

    - 5 metre into hard stratum with N>100

    - 3 times pile diameters beyond pile

    founding level.

    (b) Depth of boreholes

    - 1 borehole per 300 m2

    - 1 borehole at 10 to 30m spacing

    - Minimum 3 boreholes

    (a) Number of boreholes

    Minimum requirement

    to establish the soil strata and ground variation

    (1) Rockhead varies from RL 102m to RL88m

  • 5/22/2018 Piling Requirements

    53/80

    53

    xample of soil profile for Bukit Timah Formatio

    (1) Rockhead varies from RL 102m to RL88m

    (2) The quality of bedrock varies greatly.

    Min. 5m into

    hard stratum

  • 5/22/2018 Piling Requirements

    54/80

    54

    Example of soil profile for Jurong Formation

    Min. 3 pile diameters below

    intended pile founding level

    Requirements for pile load tests

  • 5/22/2018 Piling Requirements

    55/80

    55

    q p

    2 numbers or 2% of working piles

    installed, whichever is greater.

    (c) Non-destructive integrity

    test. (Note: This is for the

    purpose of quality control,

    and high-strain type shouldbe used for bored piles)

    2 numbers or 1% of working piles

    installed or 1 for every 50 metres

    length of proposed building,

    whichever is greater.

    (b) Working load test

    1 number or 0.5% of the total piles

    whichever is greater.

    (a) Ultimate load test on

    preliminary pile (preferably

    instrumented)

    Pile Test ScheduleType of Load Test

  • 5/22/2018 Piling Requirements

    56/80

    56

    Load measurement for pile load tests(CP4 Clause 7.5.5.2.1)

    Load should be measured by a calibrated

    load gauge & a calibrated pressure gauge

  • 5/22/2018 Piling Requirements

    57/80

    57

    (5) Piling Annexes(for buildings of 10-storeys or more)

  • 5/22/2018 Piling Requirements

    58/80

    58

    Piling Annex B

    Certificate of

    supervision of pile

    load test

    QP

    Builder

    Sitesupe

    rvisor

    QP(geo)

  • 5/22/2018 Piling Requirements

    59/80

    59

    Piling Annex CInterim certificate of

    supervision of piling

    works

    QP

    Builder

    Sitesuperviso

    r

    QP(geo)

  • 5/22/2018 Piling Requirements

    60/80

    60

    Piling Annex DCertificate for

    monitoring building

    settlement

    Sign

    edby

    QP

    Signed

    byQP

    (geo)

  • 5/22/2018 Piling Requirements

    61/80

    61

    (6) Some good practices inpile design construction

  • 5/22/2018 Piling Requirements

    62/80

    62

    a) Reduce over-reliance on pile base resistance1) Applying a minimum safety factor to skin friction,

    for bored piles, where soft toe may occur

  • 5/22/2018 Piling Requirements

    63/80

    63

    a) Reduce over-reliance on pile base resistance2) In erractic soil condition, eg limestone area

    35m

    3-m thick cavity

    limestone

    limestone

  • 5/22/2018 Piling Requirements

    64/80

    64

    (b) Preliminary pile at borehole locationBoreholeUltimate test p ile

    ( ) J di i l ti f t i

  • 5/22/2018 Piling Requirements

    65/80

    65

    (c) Judicious location of strain gauges

    Taking into account :

    - change of soil layers

    - thickness

    - variability

    To aid interpretation

    eg. measurement of skin frict ion

    at various soil /rock layers

  • 5/22/2018 Piling Requirements

    66/80

    66

    (d) Innovative Investigative preliminary pile

    Preliminary piles may be

    formed with voids at base or

    soft toes to determine

    ult imate shaft resistance

    CP4 Clause 7.5.4.1

    ( ) I ti ti li i il i t ll d i i i l

  • 5/22/2018 Piling Requirements

    67/80

    67

    (e) Investigative preliminary piles installed using similar

    construction method as working production piles

    Dry hole method

    Wet hole method

    CP4 Clause 7.5.4.1

    (f) Proper transfer of load to Kentledge frame

  • 5/22/2018 Piling Requirements

    68/80

    68

    (f) Proper transfer of load to Kentledge frame

    Use stiffener for effective transfer

  • 5/22/2018 Piling Requirements

    69/80

    69

    g) Minimum distance between test pile & Kentledge leg

    Distance between Kentledge leg to surface of test pile

    1.3 m (CP4 Clause 7.5.5.2.1)

  • 5/22/2018 Piling Requirements

    70/80

    70

    (h) No preloading on piles before test

    (i) C d t ki l d t t t l ti h it tt

  • 5/22/2018 Piling Requirements

    71/80

    71

    Pile Size

    Working

    Load Nos No. of Method of

    (mm) (kN) Load Test Test

    ASM - 135 0 -

    1000 5800 147 0 -

    1200 8400 99 1 Kentledge

    1500 13200 115 2 Kentledge

    1800 19000 159 3 Bi-Directional

    2000 23500 96 1 Bi-Directional

    2200 28500 88 1 Bi-Directional

    2500 36800 62 1 Bi-Directional

    2800 41600 22 1 Bi-Directional

    3000 53000 16 0 -

    Total : 939 10

    (i) Conduct working load test at location where it matters

    Examples :

    (1) Piles within the tower footprint

    (2) Piles carrying larger load

  • 5/22/2018 Piling Requirements

    72/80

    72

    (j) No preselection of pile for working load test

  • 5/22/2018 Piling Requirements

    73/80

    73

    (k) Keep rock/soil sample at site for verification

    (l) Impose quality control measure at site

  • 5/22/2018 Piling Requirements

    74/80

    74

    1) Pile bore stability

    2) Pile base cleanliness

    3) Tests on stabilizingfluids

  • 5/22/2018 Piling Requirements

    75/80

    75

    (l) Impose quality control measures at site

    4) Suff icient cooling t ime forweld to gain strength

  • 5/22/2018 Piling Requirements

    76/80

    76

    (m) Check & verify obvious change in pile depth

    Eg:

    (1) Site investigation

    (2) Load tests

    Recap of Some Good Practices

  • 5/22/2018 Piling Requirements

    77/80

    77

    a) Reduce over-reliance on pile baseresistance

    b) Preliminary pile at borehole location

    c) Judicious location of strain gauges

    d) Innovative preliminary pile

    e) Preliminary pile installed using same

    method as working piles

    f) Proper load transfer to Kentledge

    frame

    g) Minimum distance between test pi le &

    Kentledge leg

    h) No preloading on piles before test

    i) Conduct working load test at

    location where it matters

    j) No preselection of pile for working

    load test

    k) Check & verify obvious change in

    pile depth

    l) Keep soi l/rock samples at site for

    verification

    m) Impose quality control at site

    Summary

  • 5/22/2018 Piling Requirements

    78/80

    78

    1. Requirements of piling plan submission

    under recent BC amendment Act and

    Regulations

    2. Requirements for foundations of buildings

    more than 10-storeys

    3. Good practices in design, load tests &

    construction

  • 5/22/2018 Piling Requirements

    79/80

    79

    Concluding remark

    QP who prepare plans and calculations

    for piling plans have to comply with the

    requirements of BC Act and regulations

    Standard Certification by QP on plans and calculations

    I .... certify that they have been prepared in accordance with the provisions of

    the Building Control Regulations, the Building Control Act and any otherwritten law pertaining to buildings and construction for the time being in

    force.

  • 5/22/2018 Piling Requirements

    80/80

    80

    Thank you !

    THE END