Sahana logistics use cases may25

Post on 01-Jul-2015

726 views 3 download

description

Logistics Use Cases for Sahana Logistics Management System design

Transcript of Sahana logistics use cases may25

1http://www.SahanaFoundation.org

May 2010

Logistics Management Systems

Use Cases

2http://www.SahanaFoundation.org

May 2010

Tanzania 1994Estimated 200,000+ Rwandan Refugees enter Tanzania in a single day.

4http://www.SahanaFoundation.org

May 2010

5http://www.SahanaFoundation.org

May 2010

6http://www.SahanaFoundation.org

May 2010

7http://www.SahanaFoundation.org

May 2010

11http://www.SahanaFoundation.org

May 2010

13http://www.SahanaFoundation.org

May 2010

Turkey 1999Kocaeli Earthquake and resulting influx of international donations of drugs and medical supplies cripple Turkish Ministry of Health’s ability to respond.

14http://www.SahanaFoundation.org

May 2010

15http://www.SahanaFoundation.org

May 2010

16http://www.SahanaFoundation.org

May 2010

17http://www.SahanaFoundation.org

May 2010

18http://www.SahanaFoundation.org

May 2010

19http://www.SahanaFoundation.org

May 2010

20http://www.SahanaFoundation.org

May 2010

21http://www.SahanaFoundation.org

May 2010

Organizing the Warehouse

22http://www.SahanaFoundation.org

May 2010

23http://www.SahanaFoundation.org

May 2010

24http://www.SahanaFoundation.org

May 2010

25http://www.SahanaFoundation.org

May 2010

26http://www.SahanaFoundation.org

May 2010

Deploying the System

27http://www.SahanaFoundation.org

May 2010

28http://www.SahanaFoundation.org

May 2010

29http://www.SahanaFoundation.org

May 2010

30http://www.SahanaFoundation.org

May 2010

31http://www.SahanaFoundation.org

May 2010

32http://www.SahanaFoundation.org

May 2010

33http://www.SahanaFoundation.org

May 2010

Development & Staging Servers

COE Hawaii

Production Server

IBM Istanbul

MOH WarehouseIstanbulSERVER

6 Clients

MOH HospitalAdapazzari

MOH HospitalGolcuk

MOH HospitalIzmit

MOH HQAnkara

Commodity Tracking System Architecture

for Turkish Ministry of Health

34http://www.SahanaFoundation.org

May 2010

35http://www.SahanaFoundation.org

May 2010

36http://www.SahanaFoundation.org

May 2010

• Affected Population: 16,972,606• Human Fatalities: 30,000 +• Injured Persons: 68,478• Destroyed Houses: 228,906• Damaged Buildings 397,538

Bhuj, IndiaJanuary, 2001Gujarat Earthquake M7.9

Gujarat, India 2001

37http://www.SahanaFoundation.org

May 2010

The Mission: Logistics Management

38http://www.SahanaFoundation.org

May 2010

Gujarat Earthquake Relief:Receipt, Packaging and Distribution of Supplies

Note: KITTING

39http://www.SahanaFoundation.org

May 2010

Deploying CommTrack System:Ahmadabad, India, 7 February 2000

40http://www.SahanaFoundation.org

May 2010

41http://www.SahanaFoundation.org

May 2010

Cell phone towers still operatingBachau, India, 5 February 2000

42http://www.SahanaFoundation.org

May 2010

Bhuj, India

43http://www.SahanaFoundation.org

May 2010

44http://www.SahanaFoundation.org

May 2010

45http://www.SahanaFoundation.org

May 2010

46http://www.SahanaFoundation.org

May 2010

47http://www.SahanaFoundation.org

May 2010

Bhuj Relief Warehouse

48http://www.SahanaFoundation.org

May 2010

49http://www.SahanaFoundation.org

May 2010

50http://www.SahanaFoundation.org

May 2010

51http://www.SahanaFoundation.org

May 2010

Our Pony Express

52http://www.SahanaFoundation.org

May 2010

Anjar, India13 February 2000

53http://www.SahanaFoundation.org

May 2010

Semankyali Checkpoint, India

54http://www.SahanaFoundation.org

May 2010

55http://www.SahanaFoundation.org

May 2010

Adasar Checkpoint, India

56http://www.SahanaFoundation.org

May 2010

57http://www.SahanaFoundation.org

May 2010

58http://www.SahanaFoundation.org

May 2010

59http://www.SahanaFoundation.org

May 2010

The Indian Ocean Tsunami

60http://www.SahanaFoundation.org

May 2010

India: Sunil Raghavan

61http://www.SahanaFoundation.org

May 2010

India: Tsunami Management System:Victim Tracking, Logistics, Information System

Open source, Linux Operating System, MYSQL Database

62http://www.SahanaFoundation.org

May 2010

India: Warehouse Management

63http://www.SahanaFoundation.org

May 2010

India: Logistics System

64http://www.SahanaFoundation.org

May 2010

India: Information System

65http://www.SahanaFoundation.org

May 2010

IndonesiaBanda Aceh7 Days after tsunami

66http://www.SahanaFoundation.org

May 2010

SIMBA

Sistem Informasi Manajemen Bencana Aceh (SIMBA)

Information Management System for Aceh Disaster

67http://www.SahanaFoundation.org

May 2010

First create a new POSKO, “double-click” on ‘Create new Posko’

SIMBA

Requirements meeting with Government

Programming Team in Aceh

68http://www.SahanaFoundation.org

May 2010

Kashmir Earthquake 2005

69http://www.SahanaFoundation.org

May 2010

Islamabad Airport

87http://www.SahanaFoundation.org

May 2010

Muzzafarabad

88http://www.SahanaFoundation.org

May 2010

Mansehra

92http://www.SahanaFoundation.org

May 2010

Sahana needs a Logistics Management System

• Emergency experience demonstrates need

• No disaster management system is complete without it

• “Logistics efforts can account up to 80% of disaster relief spending and thus, efficient and effective logistics activities become crucial for successful humanitarian operations.” – ISCRAM 2009

93http://www.SahanaFoundation.org

May 2010

Logistics• Basic Principle: Get things and people

to right place, at right time, for right price.

• Must organize: Procurement Transport Warehousing Distribution

• Must provide: Accountability Reporting

94http://www.SahanaFoundation.org

May 2010

Design for Sahana Logistics (1)

95http://www.SahanaFoundation.org

May 2010

Design for Sahana Logistics (2)