Sahana logistics use cases may25

download Sahana logistics use cases may25

If you can't read please download the document

  • date post

    01-Jul-2015
  • Category

    Technology

  • view

    719
  • download

    3

Embed Size (px)

description

Logistics Use Cases for Sahana Logistics Management System design

Transcript of Sahana logistics use cases may25

  • 1. Logistics Management Systems
    Use Cases

2. Tanzania 1994
Estimated 200,000+ Rwandan Refugees enter Tanzania in a single day.
3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Turkey 1999
Kocaeli Earthquake and resulting influx of international donations of drugs and medical supplies cripple Turkish Ministry of Healths ability to respond.
14. 15. 16. 17. 18. 19. 20. 21. Organizing the Warehouse
22. 23. 24. 25. 26. Deploying the System
27. 28. 29. 30. 31. 32. 33. Commodity Tracking System Architecture
for Turkish Ministry of Health
34. 35. 36. Bhuj, India
January, 2001
Gujarat Earthquake M7.9

  • Affected Population:16,972,606 37. Human Fatalities:30,000 + 38. Injured Persons: 68,478 39. Destroyed Houses: 228,906 40. Damaged Buildings397,538

Gujarat, India 2001
41. The Mission: Logistics Management
42. Gujarat Earthquake Relief:Receipt, Packaging and Distribution of SuppliesNote: KITTING
43. Deploying CommTrack System:Ahmadabad, India, 7 February 2000
44. 45. Cell phone towers still operating
Bachau, India,
5 February 2000
46. Bhuj, India
47. 48. 49. 50. 51. Bhuj Relief Warehouse
52. 53. 54. 55. Our Pony Express
56. Anjar, India13 February 2000
57. Semankyali Checkpoint, India
58. 59. Adasar Checkpoint, India
60. 61. 62. 63. The Indian Ocean Tsunami
64. India: Sunil Raghavan
65. India: Tsunami Management System:Victim Tracking, Logistics, Information System
Open source,Linux Operating System,MYSQL Database
66. India: Warehouse Management
67. India: Logistics System
68. India: Information System
69. Indonesia
Banda Aceh
7 Days after tsunami
70. SIMBA
SistemInformasiManajemenBencana Aceh (SIMBA)
Information Management System for Aceh Disaster
71. First create a new POSKO, double-click on Create new Posko
SIMBA
Programming Team in Aceh
Requirements meeting with Government
72. Kashmir Earthquake 2005
73. Islamabad Airport
74. 75. 76. 77. 78. 79. 80. 81. 82. 83. 84. 85. 86. 87. 88. 89. 90. 91. Muzzafarabad
92. Mansehra
93. 94. 95. 96. Sahana needs a Logistics Management System
Emergency experience demonstrates need
No disaster management system is complete without it
Logistics efforts can account up to 80% of disaster relief spending and thus, efficient and effective logistics activities become crucial for successful humanitarian operations. ISCRAM 2009
97. Logistics
Basic Principle: Get things and people to right place, at right time, for right price.
Must organize:
Procurement
Transport
Warehousing
Distribution
Must provide:
Accountability
Reporting
98. Design for Sahana Logistics (1)
99. Design for Sahana Logistics (2)