Post on 06-Sep-2018
PRE FEASIBITITY REP
FOR
KHUDAUTALT STONE (CRUSHER) QUARRYAREA OF 4.OOO HESTARE
STRICTLY AS PER MOEF GI'IDEI,INES DATED3Ol l2l2olo, rN TERMS OF THE PROVTSTONS OF ErA
NOTTFICATION, 2A06
AT
VILLAGETEHSILDISTRICTSTATEMINERALKHASARA NO.
KHUDAUTALIKARERASHTVPI'RIMADHYA PRAT}ESHGITTILTEO|sl I
PROJECT PROPONENTSHRI. SHUBHAM BANSAL
S/O SHRI. JAGDISH BANSALR/O GAUTAM VIHAR COLONY,
SHIYPI'RI MP.
S No. TITLE1 EXCUTIVE SUMMARY !-2(r) Salient features of the project
2 GENERAL 3-4
(r)Identification of project and projectproponent
(II) Brief Description of nature of project(rr) Need for the project and its importance(IV) Demand - Supply(v) Import VS. Indigenous production(VI) Export possibility
(vrr) Employment Generation (Direct andIndirect) due to the rrroiect
3 PROJECT DESCRIPTION 5-6(r) lVpe of project(r) Location(rrr) Details of alternate site
(IV) Size / Magnitude of operation,(v) Geologr(VD Raw material required(ur) Resource optimization(vrrr) Availability of water(IX) Equipments and Machineries4 SITE ANALYSIS 7(r) Connectivity(II) Land form, land use and land ownership(rr) Land Use Pattern(IV) Existing Infrastructure(v) S o cial- Infrastructure
5. PLANING BRIEF 8(D Planning Concept(u) Population Projection:(rr) Land use Planning(IV) Assessment of Infrastructure demand(v) Amenities/ Facilities6. PROPOSED INFRASTRUCTURE 9
7. REHABILITATIONPLAN
AND RESATTLEMENT10
8. PROJECT SCHEDULE 10(r) Proposed Schedule(II) Project Cost Fstimation
9. Analysis of Proposalrecommendation)
(Final10
(D Financial and social benefitsi
I
1 | P a g e
PRE- FEASIBILITY REPORT
KHUDAWALI STONE (CRUSHER) QUARRY
This Pre-Feasibility report has been prepared as per guidelines
of MoEF and sample application available on website of the
department of environment and forest. The contents of the report are
geological, legal, operating, economic, social, environmental and other
relevant factors associate with the activities and are considered in
sufficient details in representative forms. We have tried to provide
necessary information that it could be reasonably serve as the basic
for the final decision by competent authority to issue environmental
clearance to the proposed project.
1. EXECUTIVE SUMMARY
The proposed stone quarry site is covering an area of 4.00 hect.
at village Khudawali , Tehsil Karera, Distt Shivpuri, M.P. Lease area is
well connected with Village Khudawali is about 1.4 Km from lease
area. Khudawali is located at a distance of 8 km from National
Highway and is about 27 Km from Tehsil headquarter, 77 km from
district headquarter and 40 km from nearest Railway Station Jhansi.
The lease area is less that 25 hectare hence belonging to B2 category.
The Mining Plan has been approved by Regional Head Directorate of
Geology and Mining, Regional Office Gwalior M.P. vide letter no
105dated 17-01-2018. There is no any other quarry lease falling
within a radius of 500m.
(I) SALIENT FEATURES OF THE PROJECT:
Particulars Details
Name of project Khudawali Stone (Crusher)Quarry
Village Khudawali
Tehsil Karera
District Shivpuri
Quarry lease area 4.00 hectare
Khasra No. 1780/3/1
Geographical Cordinates
Latitude N 25°31’01.3’’ to N 25°31’08.7’’
Longitude E 78°16’11.0’’ to E 78°16’21.8’’
Toposheet No. 54K/6
2 | P a g e
River/ Nala No major river/ nala is located within
the 500m of lease area.
Forest (NP, Sanctuary, BIO Div.) Mining area does not fall within 10 Km.
from boundary of National Park,
Sanctuary, BIO Diversity area.
Mineral Gitti
Land Use Govt. Revenue Land
Lease Validity 10 years
Production capacity 37050 cub. meter/ year
Estimated Project Cost Rs 20 lakh
EMP Cost 1.00 lac
Man Power 12 Skilled/ Unskilled
Machinery Crusher Unit, Jack Hammer Drill, JBC
Machine, Truck, Dumper, Generator set.
Water requirement and supply Drinking water 0.50kld, Plantation and
environment management 2.50 kld. Thus
total 3.50 Kld water will be required and
will be arrange on personal
agreement/purchase basis.
Nearest Habitation / Town Khudawali 1.4 KM.
Karera- 27 Km.
Nearest Dispensary PHC – Karera- 27 Km., District Hospital –
Shivpuri 77 Km.
Nearest Airport Gwalior approx 150KM
Nearest Railway Station Jhansi Railway Station about 37km.
Nearest Highway NH-27. Which is about 8 Km . from the
mine site
3 | P a g e
2. GENERAL
The proposed stone quarry area is 4.00 hectare. Stone mining
average capacity shall be 37050 cubic meters annually, mode of
excavation will be opencast semi mechanized. Explosive and blasting
parameters will be very simple and being carried out on contract basis
by blasting contractor.
Lease area Govt. Revenue land. Mining project does not require any
land acquisition nor other raw material.
(I) Identification of Project and Project Proponent
Name :Khudawali Stone (Crusher) Quarry
Village : Khudawali ,
Tehsil : Karera
Distt. : Shivpuri, M.P.
Sanctioned Area : 4.00 Hectare
Proposed Production : 37050 m3/year
Proposed depth of mining : 6.0m from lowest ground level
i.e. 373 and 12m in conceptual
period.
Address Of Proponent/ Lessee :-
Name: Shri. Shubham Bansal
S/o. Shri Jagdish Bansal
R/o Gautam Vihar Colony
Shivpuri, MP.
(II) Brief Description of Nature of Project
Area under consideration is fully covered with sheet like granite body
but highly jointed. Thin sandy soil and thick weathered granite form
about 1.00m soil. Lease area is barren government land. Mining
activity has to be done following all the security measures and
according to the proposed manner of opencast semi mechanized
method.
Total available mineable reserve is 789000m3. Proposed excavation
(ROM) is 39000 m3 for production of 37050 gitti stone annually.
During conceptual period mining is proposed up to 12.0m.
As per MoEF notification no. OM No.J-13012 /12 /2013 –IA-II (i)
dated 24th December 2013. The project comes under B2 category.
4 | P a g e
Hence Pre-feasibility report has been prepared for a final decision by
competent authority in issuing environmental clearance to the
proposed project.
(III) Need for the project and its importance to the country
and/or region:
Gitti is most commonly used as building and road construction. The
basic objective of the project is effective utilization and fulfillment of
the demand of mineral in the region. Gitti Stone will be supply to
nearby area to fulfill the local requirement. After fulfillment of local
requirement it will sold in adjoining areas.
(IV) Demand – Supply:
Mineral Granite Stone is used as building and road material. Lot of
developmental work like road and building are going on in the region.
It has sufficient demand to sustain the supply of proposed mineral
production.
(V) Import VS. Indigenous production:
This is indigenous production. This will not be neither exported nor
imported.
(VI) Export Possibility:
Not expected.
(VII) Employment Generation (Direct and Indirect) due to the
project:
Total 10-12 Numbers of person, including skilled and unskilled, are
likely to be engaged in this project. Most of these persons will
deployed from nearby villages.
5 | P a g e
3. PROJECT DESCRIPTION:
(I) Type of project including interlinked and interdependent
projects:
The proposed project is stone quarry in which mechanical crushing of
stone is involved. There is no any interlinked and interdependent
project.
(II) Location:
Location and the Geo Co-ordinates of the lease area already mention
in salient features of the project.
(III) Details of alternate site considered and the basis of selecting
proposed site, particularly the environmental consideration gone
into highlighted:
This is a site specific project. Hence at present situation no alternate
site is considered.
(IV) Size/ Magnitude of operation:
This is a small quarry. It is proposed to produce crushed stone/
material 37050 cubic m. annually. It is round the year operation work
the total manpower require for the proposed stone mining project will
be 12.
(V) Geology
In the lease area granite form the country rock of over which recent
and sub – recent black sandy soil and lateritic soil are developed.
Granite rock is found as sheet like body. It is fine to medium grained
hard and compact in nature, grey and pinkish in color. Joints are the
main structural features of the deposit.
(VI) Raw material required along with estimated quantity, likely
source, marketing area of final products, mode of transport of raw
material and finished product.
Raw material is not required for the stone excavation project, only
mining tools are required. The crushed material of varies in size
(20mm,40mm,60mm) will be carried out by the truck/ tractor trolley.
(VII) Resource optimization / recycling and resource envisaged in
the project, if any, should be briefly outlined:
Resource optimization has been exercised but there is no scope of
recycling and re-use in the project. Only top soil (0.-0.20cm) shall be
used in re- generation of soil quality.
6 | P a g e
(VIII) Availability of water and its source, energy/ power
requirement and its sources:
The total water requirement for the project is estimated 3.00 KLD for
mining spraying and domestic uses which is available in Khudawali
village. No electricity is required even so if required in future the same
will be arranged by taking connection from MPSEB
(IX) Equipments and Machineries:
It is a small quarry having total area of 4.00 hectare. Proposed annual
production is about 37050 cubic meters. Mining method will be open
cast semi mechanized type using light duty jack hammer drill,
compressor and excavator. Crusher will be installed within the mine
site.
7 | P a g e
4. SITE ANALYSIS:
(I) Connectivity
Connectivity details are already given in the salient features of the
project. :
(II) Land form, land use and land ownership:
District
and State
Tehsil Village Khasra
No.
Area In
Hectare
Status
Of
Land
Mineral
Shivpuri,
M.P.
Karera Khudawali 1780/3/1 4.000 Govt.
Land
Gitti
(III) Land use pattern:
Existing land use pattern and land use after lease period is mention
below:
(IV) Existing Infrastructure
No existing Infrastructure is present in the lease area.
(V) Social Infrastructure:
All available amenities and facilities shall be provided to the workers
like medicines, temporary shelters, safe drinking water and security
etc. as per the requirement.
To prevent or minimize adverse long term environmental impacts a
self sustaining natural eco- system will be provided to the labors and
surrounding habitation.
Area under land use Existing Land use
(hectare)
Land use pattern in
Conceptual period
Mine pit 0.000 3.204
Crusher 0.000 0.080
Dump, Office / Shelter 0.000 0.021
Approach road
(Barrier zone area)
0.000 0.000
Plantation 0.000 0.695
Unused 4.000 0.000
Total 4.000 4.000
8 | P a g e
5. PLANING BRIEF
(I) Planning Concept
Stone mining along with mechanical crushing in the region is a rural
business which is categories as medium scale unit. It is classified as
semi skilled and unskilled staff oriented mining industries. The area is
not covered under any town planning or development authority. Hence
no need of any such planning by the proponent also.
(II) Population Projection:
Due to proposed mining activity there will not be influx of people from
outside as only local people will be engaged.
(III) Land Use Planning.
Mining will be done as per detail given in mining plan. Green belt shall
be developed along periphery of the lease area. Details of land use
pattern has already been given in previous chapter.
(IV) Assessment of Infrastructure Demand (Physical and Social)
It is not expected for the project under consideration, since the project
will not exert any unbearable load on any of this available
infrastructure (School, Hospital etc.).
(V) Amenities/ Facilities:
All available amenities and facilities shall be provided to workers like –
medicines, temporary shelter, safe drinking water and security etc. as
per their requirement.
9 | P a g e
6. PROPOSED INFRASTRUCTURE
S. No. Particulars Details
1 Lease Area 4.000 Hectare
2 Residential Area Not Proposed
3 Road Connectivity The Lease area is situated 1.4 km from
the village Khudawali. It is well
connected by road to the Distt. HQ
Shivpuri and is at a distance of 77 km.
4 Green Belt Green belt of 7.5 m width shall be
developed along the periphery on the
lease area with locally suitable ever green
plants. It is proposed to implant 50 trees
annually.
5 Social Infrastructure Physical and social infrastructure is
provided and is necessary other facilities
will also be provided by mines proponent.
6 Water Management The total water requirement for the
project is estimated 3.00 KLD for mining
spraying and domestic uses. It is
available in own tube well.
7 Sewerage System There will be no generation of sewerage
due to the project hence no need of this
system.
8 Industrial Waste
Management
N.A.
9 Solid Waste
Management
N.A.
10 Power Requirement N.A.
10 | P a g e
7. REHABILITATION AND RESATTLEMENT PLAN
There is no human settlement within the mining area. Mining project
does not require any land acquisition. Hence no rehabilitation and
resettlement is proposed.
8. PROJECT SCHEDULE
(I) Proposed Schedule & approval for Implementation:
Mining will be operated only after getting the environmental clearance
from MP DEIAA
(II) Project Cost Estimation:
Estimated project cost for the proposed project is 20 lacs.
9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
(I) Financial and social benefits with special emphasis on the
benefit to the local people including tribal population, if any, in
the area.
The above proposed stone mining project is not situated in
environmental risk area. Although there is no any industry other than
stone mining within a radius of 2km from proposed site. The mining
activity will provide some employment to the local peoples. Besides
employment in mine it is also proposed to invest about Rs 40000/year
in work like water supply, sanitation, education, transport and
environmental management in adjoining area. This may be helpful in
improvement of socio-economic condition of local peoples. Area is
devoid of vegetation. Plantation in barrier zone of lease area will
improve the environment of the area.