PRE FEASIBITITY REP FOR KHUDAUTALT STONE (CRUSHER) QUARRY AREA OF 4.OOO HESTARE STRICTLY AS PER MOEF GI'IDEI,INES DATED 3Ol l2l2olo, rN TERMS OF THE PROVTSTONS OF ErA NOTTFICATION, 2A06 AT VILLAGE TEHSIL DISTRICT STATE MINERAL KHASARA NO. KHUDAUTALI KARERA SHTVPI'RI MADHYA PRAT}ESH GITTI LTEO|sl I PROJECT PROPONENT SHRI. SHUBHAM BANSAL S/O SHRI. JAGDISH BANSAL R/O GAUTAM VIHAR COLONY, SHIYPI'RI MP.

Transcript of PRE FEASIBITITY REP -...

Page 1: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

PRE FEASIBITITY REP

FOR

KHUDAUTALT STONE (CRUSHER) QUARRYAREA OF 4.OOO HESTARE

STRICTLY AS PER MOEF GI'IDEI,INES DATED3Ol l2l2olo, rN TERMS OF THE PROVTSTONS OF ErA

NOTTFICATION, 2A06

AT

VILLAGETEHSILDISTRICTSTATEMINERALKHASARA NO.

KHUDAUTALIKARERASHTVPI'RIMADHYA PRAT}ESHGITTILTEO|sl I

PROJECT PROPONENTSHRI. SHUBHAM BANSAL

S/O SHRI. JAGDISH BANSALR/O GAUTAM VIHAR COLONY,

SHIYPI'RI MP.

Page 2: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

S No. TITLE1 EXCUTIVE SUMMARY !-2(r) Salient features of the project

2 GENERAL 3-4

(r)Identification of project and projectproponent

(II) Brief Description of nature of project(rr) Need for the project and its importance(IV) Demand - Supply(v) Import VS. Indigenous production(VI) Export possibility

(vrr) Employment Generation (Direct andIndirect) due to the rrroiect

3 PROJECT DESCRIPTION 5-6(r) lVpe of project(r) Location(rrr) Details of alternate site

(IV) Size / Magnitude of operation,(v) Geologr(VD Raw material required(ur) Resource optimization(vrrr) Availability of water(IX) Equipments and Machineries4 SITE ANALYSIS 7(r) Connectivity(II) Land form, land use and land ownership(rr) Land Use Pattern(IV) Existing Infrastructure(v) S o cial- Infrastructure

Page 3: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

5. PLANING BRIEF 8(D Planning Concept(u) Population Projection:(rr) Land use Planning(IV) Assessment of Infrastructure demand(v) Amenities/ Facilities6. PROPOSED INFRASTRUCTURE 9

7. REHABILITATIONPLAN

AND RESATTLEMENT10

8. PROJECT SCHEDULE 10(r) Proposed Schedule(II) Project Cost Fstimation

9. Analysis of Proposalrecommendation)

(Final10

(D Financial and social benefitsi

I

Page 4: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

1 | P a g e

PRE- FEASIBILITY REPORT

KHUDAWALI STONE (CRUSHER) QUARRY

This Pre-Feasibility report has been prepared as per guidelines

of MoEF and sample application available on website of the

department of environment and forest. The contents of the report are

geological, legal, operating, economic, social, environmental and other

relevant factors associate with the activities and are considered in

sufficient details in representative forms. We have tried to provide

necessary information that it could be reasonably serve as the basic

for the final decision by competent authority to issue environmental

clearance to the proposed project.

1. EXECUTIVE SUMMARY

The proposed stone quarry site is covering an area of 4.00 hect.

at village Khudawali , Tehsil Karera, Distt Shivpuri, M.P. Lease area is

well connected with Village Khudawali is about 1.4 Km from lease

area. Khudawali is located at a distance of 8 km from National

Highway and is about 27 Km from Tehsil headquarter, 77 km from

district headquarter and 40 km from nearest Railway Station Jhansi.

The lease area is less that 25 hectare hence belonging to B2 category.

The Mining Plan has been approved by Regional Head Directorate of

Geology and Mining, Regional Office Gwalior M.P. vide letter no

105dated 17-01-2018. There is no any other quarry lease falling

within a radius of 500m.

(I) SALIENT FEATURES OF THE PROJECT:

Particulars Details

Name of project Khudawali Stone (Crusher)Quarry

Village Khudawali

Tehsil Karera

District Shivpuri

Quarry lease area 4.00 hectare

Khasra No. 1780/3/1

Geographical Cordinates

Latitude N 25°31’01.3’’ to N 25°31’08.7’’

Longitude E 78°16’11.0’’ to E 78°16’21.8’’

Toposheet No. 54K/6

Page 5: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

2 | P a g e

River/ Nala No major river/ nala is located within

the 500m of lease area.

Forest (NP, Sanctuary, BIO Div.) Mining area does not fall within 10 Km.

from boundary of National Park,

Sanctuary, BIO Diversity area.

Mineral Gitti

Land Use Govt. Revenue Land

Lease Validity 10 years

Production capacity 37050 cub. meter/ year

Estimated Project Cost Rs 20 lakh

EMP Cost 1.00 lac

Man Power 12 Skilled/ Unskilled

Machinery Crusher Unit, Jack Hammer Drill, JBC

Machine, Truck, Dumper, Generator set.

Water requirement and supply Drinking water 0.50kld, Plantation and

environment management 2.50 kld. Thus

total 3.50 Kld water will be required and

will be arrange on personal

agreement/purchase basis.

Nearest Habitation / Town Khudawali 1.4 KM.

Karera- 27 Km.

Nearest Dispensary PHC – Karera- 27 Km., District Hospital –

Shivpuri 77 Km.

Nearest Airport Gwalior approx 150KM

Nearest Railway Station Jhansi Railway Station about 37km.

Nearest Highway NH-27. Which is about 8 Km . from the

mine site

Page 6: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

3 | P a g e

2. GENERAL

The proposed stone quarry area is 4.00 hectare. Stone mining

average capacity shall be 37050 cubic meters annually, mode of

excavation will be opencast semi mechanized. Explosive and blasting

parameters will be very simple and being carried out on contract basis

by blasting contractor.

Lease area Govt. Revenue land. Mining project does not require any

land acquisition nor other raw material.

(I) Identification of Project and Project Proponent

Name :Khudawali Stone (Crusher) Quarry

Village : Khudawali ,

Tehsil : Karera

Distt. : Shivpuri, M.P.

Sanctioned Area : 4.00 Hectare

Proposed Production : 37050 m3/year

Proposed depth of mining : 6.0m from lowest ground level

i.e. 373 and 12m in conceptual

period.

Address Of Proponent/ Lessee :-

Name: Shri. Shubham Bansal

S/o. Shri Jagdish Bansal

R/o Gautam Vihar Colony

Shivpuri, MP.

(II) Brief Description of Nature of Project

Area under consideration is fully covered with sheet like granite body

but highly jointed. Thin sandy soil and thick weathered granite form

about 1.00m soil. Lease area is barren government land. Mining

activity has to be done following all the security measures and

according to the proposed manner of opencast semi mechanized

method.

Total available mineable reserve is 789000m3. Proposed excavation

(ROM) is 39000 m3 for production of 37050 gitti stone annually.

During conceptual period mining is proposed up to 12.0m.

As per MoEF notification no. OM No.J-13012 /12 /2013 –IA-II (i)

dated 24th December 2013. The project comes under B2 category.

Page 7: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

4 | P a g e

Hence Pre-feasibility report has been prepared for a final decision by

competent authority in issuing environmental clearance to the

proposed project.

(III) Need for the project and its importance to the country

and/or region:

Gitti is most commonly used as building and road construction. The

basic objective of the project is effective utilization and fulfillment of

the demand of mineral in the region. Gitti Stone will be supply to

nearby area to fulfill the local requirement. After fulfillment of local

requirement it will sold in adjoining areas.

(IV) Demand – Supply:

Mineral Granite Stone is used as building and road material. Lot of

developmental work like road and building are going on in the region.

It has sufficient demand to sustain the supply of proposed mineral

production.

(V) Import VS. Indigenous production:

This is indigenous production. This will not be neither exported nor

imported.

(VI) Export Possibility:

Not expected.

(VII) Employment Generation (Direct and Indirect) due to the

project:

Total 10-12 Numbers of person, including skilled and unskilled, are

likely to be engaged in this project. Most of these persons will

deployed from nearby villages.

Page 8: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

5 | P a g e

3. PROJECT DESCRIPTION:

(I) Type of project including interlinked and interdependent

projects:

The proposed project is stone quarry in which mechanical crushing of

stone is involved. There is no any interlinked and interdependent

project.

(II) Location:

Location and the Geo Co-ordinates of the lease area already mention

in salient features of the project.

(III) Details of alternate site considered and the basis of selecting

proposed site, particularly the environmental consideration gone

into highlighted:

This is a site specific project. Hence at present situation no alternate

site is considered.

(IV) Size/ Magnitude of operation:

This is a small quarry. It is proposed to produce crushed stone/

material 37050 cubic m. annually. It is round the year operation work

the total manpower require for the proposed stone mining project will

be 12.

(V) Geology

In the lease area granite form the country rock of over which recent

and sub – recent black sandy soil and lateritic soil are developed.

Granite rock is found as sheet like body. It is fine to medium grained

hard and compact in nature, grey and pinkish in color. Joints are the

main structural features of the deposit.

(VI) Raw material required along with estimated quantity, likely

source, marketing area of final products, mode of transport of raw

material and finished product.

Raw material is not required for the stone excavation project, only

mining tools are required. The crushed material of varies in size

(20mm,40mm,60mm) will be carried out by the truck/ tractor trolley.

(VII) Resource optimization / recycling and resource envisaged in

the project, if any, should be briefly outlined:

Resource optimization has been exercised but there is no scope of

recycling and re-use in the project. Only top soil (0.-0.20cm) shall be

used in re- generation of soil quality.

Page 9: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

6 | P a g e

(VIII) Availability of water and its source, energy/ power

requirement and its sources:

The total water requirement for the project is estimated 3.00 KLD for

mining spraying and domestic uses which is available in Khudawali

village. No electricity is required even so if required in future the same

will be arranged by taking connection from MPSEB

(IX) Equipments and Machineries:

It is a small quarry having total area of 4.00 hectare. Proposed annual

production is about 37050 cubic meters. Mining method will be open

cast semi mechanized type using light duty jack hammer drill,

compressor and excavator. Crusher will be installed within the mine

site.

Page 10: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

7 | P a g e

4. SITE ANALYSIS:

(I) Connectivity

Connectivity details are already given in the salient features of the

project. :

(II) Land form, land use and land ownership:

District

and State

Tehsil Village Khasra

No.

Area In

Hectare

Status

Of

Land

Mineral

Shivpuri,

M.P.

Karera Khudawali 1780/3/1 4.000 Govt.

Land

Gitti

(III) Land use pattern:

Existing land use pattern and land use after lease period is mention

below:

(IV) Existing Infrastructure

No existing Infrastructure is present in the lease area.

(V) Social Infrastructure:

All available amenities and facilities shall be provided to the workers

like medicines, temporary shelters, safe drinking water and security

etc. as per the requirement.

To prevent or minimize adverse long term environmental impacts a

self sustaining natural eco- system will be provided to the labors and

surrounding habitation.

Area under land use Existing Land use

(hectare)

Land use pattern in

Conceptual period

Mine pit 0.000 3.204

Crusher 0.000 0.080

Dump, Office / Shelter 0.000 0.021

Approach road

(Barrier zone area)

0.000 0.000

Plantation 0.000 0.695

Unused 4.000 0.000

Total 4.000 4.000

Page 11: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

8 | P a g e

5. PLANING BRIEF

(I) Planning Concept

Stone mining along with mechanical crushing in the region is a rural

business which is categories as medium scale unit. It is classified as

semi skilled and unskilled staff oriented mining industries. The area is

not covered under any town planning or development authority. Hence

no need of any such planning by the proponent also.

(II) Population Projection:

Due to proposed mining activity there will not be influx of people from

outside as only local people will be engaged.

(III) Land Use Planning.

Mining will be done as per detail given in mining plan. Green belt shall

be developed along periphery of the lease area. Details of land use

pattern has already been given in previous chapter.

(IV) Assessment of Infrastructure Demand (Physical and Social)

It is not expected for the project under consideration, since the project

will not exert any unbearable load on any of this available

infrastructure (School, Hospital etc.).

(V) Amenities/ Facilities:

All available amenities and facilities shall be provided to workers like –

medicines, temporary shelter, safe drinking water and security etc. as

per their requirement.

Page 12: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

9 | P a g e

6. PROPOSED INFRASTRUCTURE

S. No. Particulars Details

1 Lease Area 4.000 Hectare

2 Residential Area Not Proposed

3 Road Connectivity The Lease area is situated 1.4 km from

the village Khudawali. It is well

connected by road to the Distt. HQ

Shivpuri and is at a distance of 77 km.

4 Green Belt Green belt of 7.5 m width shall be

developed along the periphery on the

lease area with locally suitable ever green

plants. It is proposed to implant 50 trees

annually.

5 Social Infrastructure Physical and social infrastructure is

provided and is necessary other facilities

will also be provided by mines proponent.

6 Water Management The total water requirement for the

project is estimated 3.00 KLD for mining

spraying and domestic uses. It is

available in own tube well.

7 Sewerage System There will be no generation of sewerage

due to the project hence no need of this

system.

8 Industrial Waste

Management

N.A.

9 Solid Waste

Management

N.A.

10 Power Requirement N.A.

Page 13: PRE FEASIBITITY REP - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/District/pfr/170120186B9... · KHUDAUTALT STONE (CRUSHER) QUARRY ... of MoEF and sample

10 | P a g e

7. REHABILITATION AND RESATTLEMENT PLAN

There is no human settlement within the mining area. Mining project

does not require any land acquisition. Hence no rehabilitation and

resettlement is proposed.

8. PROJECT SCHEDULE

(I) Proposed Schedule & approval for Implementation:

Mining will be operated only after getting the environmental clearance

from MP DEIAA

(II) Project Cost Estimation:

Estimated project cost for the proposed project is 20 lacs.

9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

(I) Financial and social benefits with special emphasis on the

benefit to the local people including tribal population, if any, in

the area.

The above proposed stone mining project is not situated in

environmental risk area. Although there is no any industry other than

stone mining within a radius of 2km from proposed site. The mining

activity will provide some employment to the local peoples. Besides

employment in mine it is also proposed to invest about Rs 40000/year

in work like water supply, sanitation, education, transport and

environmental management in adjoining area. This may be helpful in

improvement of socio-economic condition of local peoples. Area is

devoid of vegetation. Plantation in barrier zone of lease area will

improve the environment of the area.