Final phase

Post on 10-May-2015

105 views 2 download

Tags:

description

Last of the rebuild at 1326 Cunningham Rd.

Transcript of Final phase

Final Phase

It’s a wrap!

It is Finished

It has been a long journey but the house is now finished and ready for new owners. Much has been accomplished since the last slideshow featuring the basement.I took some outdoor shots that show the new porch and the driveway.

Outside PicturesThe driveway is much wider than I thought. While it is not in great shape I seal coated it so it will look fresh. A foot of sod was removed from each side of the drive to expose all of the asphalt.

From the StreetI replaced the solar light on the post with a bigger one and it does work. I also added house numbers to the post and both sides of the mailbox.

Another Look

New House Number Board mounted to Wall

The PorchTotally rebuilt. The header, beams and posts were rotted. Rain took its toll over the years. White siding matches the new soffit and fascia put around the entire house.

Added these protective chimney caps to keep varmints out.

Look from the KitchenAll new drywall and trim. The windows are new and seal well.

A walk through ..All of the carpets were cleaned by Stanley Steemer.

Master Bedroom

Bedroom off Kitchen

Kitchen

The New Basement

The handrail works well

View from the Stairs

From the Fireplace Room

Door Short but works. New outside light.

Closet in fireplace room

Main Window with storage under

Fireplace Room Window

Looking up the stairs

Running a dehumidifier to keep things dry. Auto drains into floor drain of the future laundry. No empting required.

Still need a cover for the electrical panel. One is coming. Will be White and look like a cupboard door.

That’s It

That’s it. Now for a buyer. Total invested in the job…. Anyone want to venture a guess?

Best guess without going over wins the license plate house numbers attached to the coat hanger that was hung from the front door light.Email guesses to ron@midwestjackson.com