Ferry boat terminal

Post on 23-Feb-2016

28 views 0 download

Tags:

description

Ferry boat terminal. Daryl toy Rensselaer polytechnic institute Fall 2013. Urban & Historical context. Pons Aemilius - 1 st stone bridge built across the Tiber River: 181 BC. Ponte P alatino built in 1886 AD. Site. Site. Site. overview. overview. TICKETING WAITING AREA. - PowerPoint PPT Presentation

Transcript of Ferry boat terminal

FERRY BOAT TERMINAL

DARYL TOYRENSSELAER POLYTECHNIC INSTITUTEFALL 2013

URBAN & HISTORICAL CONTEXTPons Aemilius - 1st stone bridge built across the Tiber River: 181 BC

Ponte Palatino built in 1886 AD

SITE

SITE

SITE

OVERVIEW

OVERVIEW

TICKETINGWAITING AREA

ENTRANCE

DOCKING AREA

PATHWAY

A. CORNER EXPERIENCE

B. VIEW ASCENDING RAMP

A.

B.

PATHWAY

A. SIDE VIEW

B. VIEW FROM WAITING AREA

A. B.

PATHWAY & RAMP

A. ASCENDING LOWER RAMP

B. WATER CHANGE & MOBILITY OF RAMPWAYS

A.

B.

.

RAMP AND CHANGING WATER LEVELS

LOW WATER

HIGH WATER

HORIZONTAL SHIFT

UPPER TRACK SYSTEM

HANDRAIL DETAIL

PLAN

HORIZONTAL SHIFTS

HORIZONTAL SHIFTS

RAMP DETAIL

EXPLODED AXON RAMP DETAIL

RIGID SUSPENSION MEM

BER DETAIL

RAMP SECTION

BEAM DESIGN

SCALE

GENERATIVE DESIGN

EXISTING BEARING CONDITIONS

TRUS

S &

SKIN

STRUCTURAL DIAGRAM

ELEVATION

SECTION