BUILDING INFORMATION MODELING - WordPress.com · 2012-03-27 · building information modeling...

Post on 02-Aug-2020

0 views 0 download

Transcript of BUILDING INFORMATION MODELING - WordPress.com · 2012-03-27 · building information modeling...

FEBRUARY 22, 2012

BUILDING INFORMATION

MODELING

Monday, March 26, 12

ROBERT A. VAN HET HOF

BARCH FROM THE UNIVERSITY OF ILLINOIS AT CHICAGO, 1994

3D AUTOCAD, ARCHICAD, REVIT

HELPED LAUNCH A CHICAGO BIM USER GROUP

CURRENTLY PROJECT MANAGER AT WARE MALCOMB

TEACH REVIT COURSES AT TRITON AND HARPER COLLEGES

FROM THE NETHERLANDS

Monday, March 26, 12

OUTLINE

HISTORY OF THE ARCHITECTURAL PROFESSION

INFUSION AND DEVELOPMENT OF TECHNOLOGY

IMPACT TECHNOLOGY HAS ON THE PROFESSION

ADDITIONAL FACETS THE TECHNOLOGY OFFERS

WHAT THE FUTURE MAY HOLD...

Monday, March 26, 12

HISTORY

Monday, March 26, 12

“ARCHITECT”

LATIN:ARCHITECTURA

GREEK:ARKHITEKTON

“CHIEF BUILDER, CARPENTER,

MASON”

Monday, March 26, 12

TIMELINE

4000 BC 2000 AD

Monday, March 26, 12

TIMELINE

4000 BC 2000 AD

CA

D (

198

0) >

< B

IM (

200

0)

MASTER BUILDER

ARCHITECT+

CONTRACTOR

Monday, March 26, 12

TECHNOLOGY

Monday, March 26, 12

CAD

WAS INTRODUCED AS EARLY AS THE 1960’S BUT DID NOT BECOME WIDELY USED UNTIL THE 1980’S

ALLOWED EASY REPRODUCTION

ALLOWED EASY REVISIONS

WAS MORE ACCURATE THAN HAND-DRAFTING

MUCH LESS ARCHIVAL SPACE WAS REQUIRED

FILES COULD BE USED IN MACHINING/FABRICATION

Monday, March 26, 12

DRAFTER 1 DRAFTER 2

DRAFTER 3 DRAFTER 4

Monday, March 26, 12

LEGACY DELIVERABLES

Monday, March 26, 12

“3D”

ALLOWED ARCHITECTS TO EASILY COMMUNICATE WITH CLIENTS AND CONTRACTORS

ALLOWED MULTIPLE VIEWS

ALLOWED EASY REVISIONS

DID NOT CONTAIN PERTINENT INFORMATION

DID NOT PRODUCE CONSTRUCTION DOCUMENTS

Monday, March 26, 12

Monday, March 26, 12

BIM

PUTS THE EMPHASIS ON THE VIRTUAL MODEL RATHER THAN DOCUMENTATION

CONSTRUCTION DOCUMENTS ARE PRODUCED FROM THE VIRTUAL MODEL

VIEWS ARE LINKED AND DATA IS CONSISTENT

CHANGES ARE UNIVERSAL

INSTANT FEEDBACK

ALL INFORMATION CONTAINED IN A SINGLE DATABASE

Monday, March 26, 12

BUILDING DESIGN COURTESY OF DLA, LTD. © 2011

Monday, March 26, 12

BUILDING DESIGN COURTESY OF DLA, LTD. © 2011

Monday, March 26, 12

BUILDING DESIGN COURTESY OF DLA, LTD. © 2011

Monday, March 26, 12

BUILDING DESIGN COURTESY OF DLA, LTD. © 2011

Monday, March 26, 12

BUILDING DESIGN COURTESY OF DLA, LTD. © 2011

Monday, March 26, 12

IMPACT

Monday, March 26, 12

CHANGES

SHIFTING OF WORKFLOW BASED ON EXPERTISE

SHIFTING OF WORK LOAD

NEED TO (RE)DEFINE SCOPE OF WORK AND CONTRACTS

DEMAND ON COMPUTER HARDWARE AND SOFTWARE

DEMAND ON (NETWORK) CONNECTIVITY

Monday, March 26, 12

0

12.5

25

37.5

50

SD DD CD CA

CAD BIM

Monday, March 26, 12

MACLEAMY CURVEPATRICK MACLEAMY, FAIA

Monday, March 26, 12

LEVELS OF DEVELOPMENT

LEVEL 100 - CONCEPTUAL DESIGN. BASIC MASSING AND PROGRAMMING. VOLUMES ARE DEFINED BUT HAVE NO SUBDIVISIONS.

LEVEL 200 - DESIGN DEVELOPMENT. CIRCULATION, BUILDING COMPONENTS, AND SYSTEMS ARE DEFINED.

LEVEL 300 - CONSTRUCTION DOCUMENTS. ELEMENTS ARE DEFINED AND ALL NECESSARY INFORMATION FOR CONSTRUCTION IS PRESENT.

LEVEL 400 - FABRICATION. ALL INFORMATION REQUIRED TO FABRICATE OR INSTALL COMPONENTS IS INCLUDED.

LEVEL 500 - AS-BUILT. THIS IS A COMPLETE DOCUMENTATION OF NOT WHAT WAS PROPOSED, BUT ACTUALLY INSTALLED.

Monday, March 26, 12

COLLABORATION

MODELER 2 MODELER 1 MODELER 3

Monday, March 26, 12

COMPONENTS

2D (PLANS, ELEVATIONS, SECTIONS, DETAILS)

3D (VIRTUAL MODELS WITH X, Y, Z DIMENSIONS)

4D (TIME)

5D (COST)

6D (SUSTAINABILITY)

7D (FACILITY MANAGEMENT)

Monday, March 26, 12

TIMELINE

4000 BC 2000 AD

MASTER BUILDER

ARCHITECT+

CONTRACTOR

IPD

Monday, March 26, 12

Monday, March 26, 12

CAPABILITIES

Monday, March 26, 12

BENEFITS

IMMEDIATE VISUAL FEEDBACK TO CLIENTS

IMMEDIATE QUANTITATIVE FEEDBACK TO CLIENTS

IMMEDIATE QUANTITATIVE FEEDBACK TO CONTRACTORS

CONFLICT RESOLUTION BEFORE CHANGE ORDERS

COORDINATED DRAWINGS, DETAILS, SCHEDULES

Monday, March 26, 12

BUILDING DESIGN COURTESY OF DLA, LTD. © 2011

Monday, March 26, 12

ADDITIONAL FACETS

ENERGY MODELING

COST ESTIMATING

SPECIFICATION WRITING

FACILITY MANAGEMENT

FEASIBILITY STUDIES

MATERIAL TAKE-OFFS

ETC...

Monday, March 26, 12

FUTURE

Monday, March 26, 12

Monday, March 26, 12

Monday, March 26, 12

Monday, March 26, 12

Monday, March 26, 12

CONCLUSION

WE HAVE SEEN A SHIFT AWAY FROM THE “MASTER BUILDER” BUT ARE STARTING TO SEE A MOVE BACK IN THAT DIRECTION

BIM TECHNOLOGY GOES FAR BEYOND TRADITIONAL BUILDING DOCUMENTATION

BIM TECHNOLOGY ALLOWS US TO DESIGN BUILDINGS WE COULD NOT WITH TRADITIONAL MEANS

THE POSSIBILITIES ARE ENDLESS ONCE A VIRTUAL MODEL/DATABASE HAS BEEN CREATED

Monday, March 26, 12

QUESTIONS ?

THANK YOU...

Monday, March 26, 12