Batesville High SchoolBatesville Middle School

Master PlanJanuary 21, 2019

2012 Admin/Guidance.

1998 Academic Wing

1998 Music

Non-Colored Areas are Original 1967 Construction

BHS Master PlanAge of Construction

2

2013 Finishes

``

2017 SAC (not shown)

N

2013 FINISHES

2011ARTS

2011ITE

1998 Academic Wing

2011LABS

BHS Master PlanAge of Construction

Non-Colored Areas are Orig. 1967 Construction

3

2017 SAC (not shown)

N

2013 FINISHES

First Floor

BHS Master Plan

4

Must Priority Scope: Tier 1

Door Monitoring/Security New Mechanical Controls throughoutSelective HVAC Equipment Replacement

N

Must Priority Scope: Tier 1

Second Floor

BHS Master Plan

5

N

Re-Roof

Auditorium & Student CommonsRoof is 30+ yrs. of Age

Original Academic Area Roof is 30+ yrs. of Age

BHS Master Plan

6

Must Priority Scope: Tier 1

N

BHS Master Plan

Remodel 1998 Finishes and open up for flexible use and connection to Student Commons

Cafeteria

7

Must Priority Scope: Tier 1

N

BHS Master Plan

8

Must Priority Scope: Tier 1

Expand & reconfigure South Parking Area to 110 Cars, aNet increase of 44 Cars

N

BHS Master Plan

Remodel 1967 Restrooms by Cafeteria

Cafeteria

9

Must Priority Scope: Tier 2

Restrooms

N

1998 Music

CARPET TILE IN CLASSROOMS (9)

BHS Master Plan

10

Must Priority Scope: Tier 2

N

CARPET TILE IN CLASSROOMS (18)

BHS Master Plan

11

Must Priority Scope: Tier 2

N

First Floor

Locker Room

BHS Master Plan

12

Must Priority Scope: Tier 2Complete Shelled out

Locker from last Project

N

Batesville Middle School

13

First Floor

Old Gym

BMS Master Plan

14

Cafeteria

Gymnasium

Main Entry

N

Age of Construction1998 Gym

Non-Colored Areas are Original 1974 Construction

1998 Academic Wing

First Floor

BMS Master Plan

15

Must Priority Scope: Tier 1

Door Monitoring/Security New Mechanical Controls throughoutSelective HVAC Equipment Replacement

Cafeteria

Gymnasium

Main Entry

N

Media Center

Must Priority Scope: Tier 2

BMS Master PlanSite Plan

16

Re-Roof Old GymRoof is 30+ yrs. of Age

N

First Floor

New Construction

Band

Music Admin

Choir

Corridor

Old Gym

BMS Master Plan

17

Must Priority Scope: Tier 1

N

Music and Administration Expansion with Link to Old Gymnasium (Security)

Media Center

Cafeteria

Gymnasium

Main Entry

BMS Master PlanSite Plan

Locker Room

Support

Music and Admin Addition

18

New Construction

Cafeteria/Serving Expansion

Renovation/Right size Choir

First Floor

Band

Music Admin

ExpandCafeteria

Choir

Corridor

Old Gym

New Corridor

Expand Food Service

BMS Master Plan

19

High Priority Scope: Tiers 3 & 4

N

Future

Media Center

Gymnasium

Main Entry

First Floor

Carpet Tile in Classrooms (19)

C̀arpet Tile in Corridors

`

BMS Master Plan

20

Must Priority Scope: Tier 2

Cafeteria

Gymnasium

Main Entry

N

Media Center

Second Floor

Carpet Tile in Corridors

Carpet Tile in Academics (10)

BMS Master Plan

21

Must Priority Scope: Tier 2

N

First Floor

Secured Media Center

Old Gym

Media Center

New Wall/Doors

BMS Master Plan

22

Cafeteria

Gymnasium

Main Entry

N

Must Priority Scope: Tier 1

First Floor

Window Wall

Renovate to Student Commons

Remodel

Old Gym

Media Center

Open Student Collaboration

New Connecting Corridor

Comm.Room

STEMLab

BMS Master Plan

23

High Priority Scope: Tier 2

Cafeteria

Gymnasium

Main Entry

N

Future

Batesville High SchoolBatesville Middle School

Master Plan

24