ADU Construction Process (in pictures)

Post on 25-May-2015

7.423 views 0 download

Tags:

description

Building an Accessory Dwelling Unit is not procedurally different than building a new house. This slideshow shows the building process step by step.

Transcript of ADU Construction Process (in pictures)

Accessory Dwelling Unit:

Construction

Start to FinishApril 2011-Septemeber 2011

3D Model

Excavation

Excavation

Excavation

Excavation

Concrete Forms

Concrete Foundation Walls

Gravel

Vapor Barrier

Rigid Foam, Rebar, and Pex Tubing for Radiant Heat

Concrete Slab

Utilities: Sewer and drainage pipes

Utilities: Water

Utilities: Electrical

Utilities: Gas

Platform Framing

Balloon Framing

Framing: Windows

Framing: Stairs

Framing: Roof

Framing: Sheathing

Roofing

Weather and Air Resistant Barrier

Rough Plumbing

Mechanical: (eg. Heat Recovery Ventilator)

Mechanical: Tankless Water Heater

COLD WATER IN

HOT WATER OUT

Mechanical: Radon Mitigation

Lighting and Electric

Air Sealing

Insulation: Batts

Insulation: Closed Cell Spray Foam

Insulation: Blown in

Drywall (aka Sheetrock)

Drywall: Mudding, Sanding, Priming

Shingles & Rain Screen

Siding

Staining and Sealing Concrete Flooring

Reused Flooring

Tiling

Painting

Cabinets & Shelving

Finish Plumbing

Finish Electrical and Lighting

Certificate of Occupancyand Moving In