ADU construction

46
Siting on the lot Building envelope and systems Heating & Cooling system Home size Air Sealing Insulation The three most significant factors to reduce the energy footprint of a home’s occupants: Location Microneighborhood Walkability

Transcript of ADU construction

Page 1: ADU construction

Siting on the lot

Building envelope and systems

Heating & Cooling system

Home size

Air Sealing Insulation

The three most significant factors to reduce the energy footprint of a home’s occupants:

Location

Microneighborhood

Walkability

Page 2: ADU construction

Accessory Dwelling Unit:

Construction

Start to FinishApril 2011-Septemeber 2011

Page 3: ADU construction
Page 4: ADU construction

Integrated Design Process

For an ADU, the IDP should ideally include people who play the following roles:homeowner, architect, builder, plumber, electrician, mechanical, landscaper

Page 5: ADU construction

3D Model

Contact Nathan Korhmann ([email protected])

Page 6: ADU construction

Excavation

Page 7: ADU construction

Concrete Forms

Page 8: ADU construction

Concrete Foundation Walls

Page 9: ADU construction

Gravel

Page 10: ADU construction

Vapor Barrier

Page 11: ADU construction

Rigid Foam, Rebar, and Pex Tubing for Radiant Heat

Page 12: ADU construction

Concrete Slab

Page 13: ADU construction

Utilities: Sewer and drainage pipes

Sewer extends from main house for ADUs

Page 14: ADU construction

Utilities: Water

Water extends from main house for ADUs

Page 15: ADU construction

Utilities: Electrical

Electric varies: sometimes you may add a subpanel to the main house to serve the ADU. Sometime, you’ll have to add a new “service drop” directly from the street to serve to the ADU

Page 16: ADU construction

Utilities: Gas

For gas, your gas company will add a 2nd meter and you’ll have to run a new gas line from it to serve the ADU

Page 17: ADU construction

Framing

Page 18: ADU construction

Framing: Windows and doors

Page 19: ADU construction

Framing: Stairs

Page 20: ADU construction

Framing: Roof

Page 21: ADU construction

Framing: Sheathing

Page 22: ADU construction

Roofing

Page 23: ADU construction

Weather and Air Resistant Barrier

Page 24: ADU construction

Rough Plumbing

Page 25: ADU construction

Mechanical: (eg. Heat Recovery Ventilator)

Page 26: ADU construction

Mechanical: Tankless Water Heater

COLD WATER IN

HOT WATER OUT

Page 27: ADU construction

Mechanical: Radon Mitigation

Page 28: ADU construction

Lighting and Electric

Page 29: ADU construction

Air Sealing

Page 30: ADU construction

Insulation: Batts

Page 31: ADU construction

Insulation: Closed Cell Spray Foam

Page 32: ADU construction

Insulation: Blown in

Page 33: ADU construction

Drywall (aka Sheetrock)

Page 34: ADU construction

Drywall: Mudding, Sanding, Priming

Page 35: ADU construction

Shingles & Rain Screen

Page 36: ADU construction

Siding

Page 37: ADU construction

Staining and Sealing Concrete Flooring

Page 38: ADU construction

Reused Flooring

Page 39: ADU construction

Tiling

Page 40: ADU construction

Painting

Page 41: ADU construction

Cabinets & Shelving

Page 42: ADU construction

Finish Plumbing

Page 43: ADU construction

Finish Electrical and Lighting

Page 44: ADU construction

Certificate of Occupancyand Moving In

Page 45: ADU construction

Modifications

Page 46: ADU construction

Questions