ADU Construction Process (in pictures)

48
Accessory Dwelling Unit: Construction Start to Finish April 2011- Septemeber 2011

description

Building an Accessory Dwelling Unit is not procedurally different than building a new house. This slideshow shows the building process step by step.

Transcript of ADU Construction Process (in pictures)

Page 1: ADU Construction Process (in pictures)

Accessory Dwelling Unit:

Construction

Start to FinishApril 2011-Septemeber 2011

Page 2: ADU Construction Process (in pictures)

3D Model

Page 3: ADU Construction Process (in pictures)

Excavation

Page 4: ADU Construction Process (in pictures)

Excavation

Page 5: ADU Construction Process (in pictures)

Excavation

Page 6: ADU Construction Process (in pictures)

Excavation

Page 7: ADU Construction Process (in pictures)

Concrete Forms

Page 8: ADU Construction Process (in pictures)

Concrete Foundation Walls

Page 9: ADU Construction Process (in pictures)

Gravel

Page 10: ADU Construction Process (in pictures)

Vapor Barrier

Page 11: ADU Construction Process (in pictures)

Rigid Foam, Rebar, and Pex Tubing for Radiant Heat

Page 12: ADU Construction Process (in pictures)

Concrete Slab

Page 13: ADU Construction Process (in pictures)

Utilities: Sewer and drainage pipes

Page 14: ADU Construction Process (in pictures)

Utilities: Water

Page 15: ADU Construction Process (in pictures)

Utilities: Electrical

Page 16: ADU Construction Process (in pictures)

Utilities: Gas

Page 17: ADU Construction Process (in pictures)

Platform Framing

Page 18: ADU Construction Process (in pictures)

Balloon Framing

Page 19: ADU Construction Process (in pictures)

Framing: Windows

Page 20: ADU Construction Process (in pictures)

Framing: Stairs

Page 21: ADU Construction Process (in pictures)

Framing: Roof

Page 22: ADU Construction Process (in pictures)

Framing: Sheathing

Page 23: ADU Construction Process (in pictures)

Roofing

Page 24: ADU Construction Process (in pictures)

Weather and Air Resistant Barrier

Page 25: ADU Construction Process (in pictures)

Rough Plumbing

Page 26: ADU Construction Process (in pictures)

Mechanical: (eg. Heat Recovery Ventilator)

Page 27: ADU Construction Process (in pictures)

Mechanical: Tankless Water Heater

COLD WATER IN

HOT WATER OUT

Page 28: ADU Construction Process (in pictures)

Mechanical: Radon Mitigation

Page 29: ADU Construction Process (in pictures)

Lighting and Electric

Page 30: ADU Construction Process (in pictures)

Air Sealing

Page 31: ADU Construction Process (in pictures)

Insulation: Batts

Page 32: ADU Construction Process (in pictures)

Insulation: Closed Cell Spray Foam

Page 33: ADU Construction Process (in pictures)

Insulation: Blown in

Page 34: ADU Construction Process (in pictures)

Drywall (aka Sheetrock)

Page 35: ADU Construction Process (in pictures)

Drywall: Mudding, Sanding, Priming

Page 36: ADU Construction Process (in pictures)

Shingles & Rain Screen

Page 37: ADU Construction Process (in pictures)

Siding

Page 38: ADU Construction Process (in pictures)

Staining and Sealing Concrete Flooring

Page 39: ADU Construction Process (in pictures)

Reused Flooring

Page 40: ADU Construction Process (in pictures)

Tiling

Page 41: ADU Construction Process (in pictures)

Painting

Page 42: ADU Construction Process (in pictures)

Cabinets & Shelving

Page 43: ADU Construction Process (in pictures)

Finish Plumbing

Page 44: ADU Construction Process (in pictures)

Finish Electrical and Lighting

Page 45: ADU Construction Process (in pictures)

Certificate of Occupancyand Moving In

Page 46: ADU Construction Process (in pictures)

Modifications

Page 47: ADU Construction Process (in pictures)

Questions

Page 48: ADU Construction Process (in pictures)

Questions