2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 ......OH7500012 ANNA ENTRY POINT MONITORING...

Post on 17-Oct-2020

3 views 0 download

Transcript of 2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 ......OH7500012 ANNA ENTRY POINT MONITORING...

ANNAOH7500012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558193EP001

Facility Name: ANNA VILLAGE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

ANNAOH7500012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANNA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANNA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

ANNAOH7500012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANNA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: ANNA, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SHELBY COUNTY WATER AND SEWER PWSOH7500112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558194EP001

Facility Name: SHELBY CO W & SD

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

SHELBY COUNTY WATER AND SEWER PWSOH7500112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SHELBY CO. WTR. AND SWR. DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SHELBY CO. WTR. AND SWR. DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

SHELBY COUNTY WATER AND SEWER PWSOH7500112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SHELBY CO. WTR. AND SWR. DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

BOTKINS VILLAGE PWSOH7500212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558195EP001

Facility Name: BOTKINS WTP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BOTKINS VILLAGE PWSOH7500212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOTKINS,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOTKINS,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

BOTKINS VILLAGE PWSOH7500212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOTKINS,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOTKINS,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

FORT LORAMIE, VILLAGE OF PWSOH7500312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7562499EP002

Facility Name: FORT LORAMIE WTP STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

FORT LORAMIE, VILLAGE OF PWSOH7500312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FORT LORAMIE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FORT LORAMIE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

FORT LORAMIE, VILLAGE OF PWSOH7500312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FORT LORAMIE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FORT LORAMIE,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

HIDDEN VALLEY MHP PWSOH7500412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558197EP001

Facility Name: HIDDEN VALLEY MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

HIDDEN VALLEY MHP PWSOH7500412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HIDDEN VALLEY MHP DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HIDDEN VALLEY MHP DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

HIDDEN VALLEY MHP PWSOH7500412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HIDDEN VALLEY MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

JACKSON CENTER VILLAGE PWSOH7500512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558198EP001

Facility Name: JACKSON CENTER WATER DEPT

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

JACKSON CENTER VILLAGE PWSOH7500512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JACKSON CENTER,VLG.OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JACKSON CENTER,VLG.OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

JACKSON CENTER VILLAGE PWSOH7500512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JACKSON CENTER,VLG.OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JACKSON CENTER,VLG.OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

KETTLERSVILLE WELL ASSOCIATION PWSOH7500612

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558199EP001

Facility Name: KETTLERSVILLE WELL ASSOCIATION

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

KETTLERSVILLE WELL ASSOCIATION PWSOH7500612

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: KETTLERSVILLE WELL ASSOC DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: KETTLERSVILLE WELL ASSOC DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

OHIO LIVING DOROTHY LOVE PWSOH7500712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558200EP001

Facility Name: OHIO LIVING DOROTHY LOVE-TP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

OHIO LIVING DOROTHY LOVE PWSOH7500712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: OHIO LIVING DOROTHY LOVE DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: OHIO LIVING DOROTHY LOVE DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

OHIO LIVING DOROTHY LOVE PWSOH7500712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: OHIO LIVING DOROTHY LOVE DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: OHIO LIVING DOROTHY LOVE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MCCARTYVILLE WELL ASSOCIATION PWSOH7500812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558201EP001

Facility Name: MCCARTYVILLE WELL ASSOC STU 1

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MCCARTYVILLE WELL ASSOCIATION PWSOH7500812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7560596EP002

Facility Name: MCCARTYVILLE WELL ASSOC. STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MCCARTYVILLE WELL ASSOCIATION PWSOH7500812

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MCCARTYVILLE WELL ASSOC. DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MCCARTYVILLE WELL ASSOC. DISTRIBUTION Facility Class: CLASS 1DS201 9333 STATE ROUTE 119

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

MCCARTYVILLE WELL ASSOCIATION PWSOH7500812

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MCCARTYVILLE WELL ASSOC. DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

NORTHVIEW UTILITY CORPORATION PWSOH7500912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7562500EP002

Facility Name: NORTHVIEW UTILITY CORP WTP STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

NORTHVIEW UTILITY CORPORATION PWSOH7500912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTHVIEW UTILITY CORP DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTHVIEW UTILITY CORP DISTRIBUTION Facility Class: CLASS 1DS201 12116 ST. RT. 363

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

NORTHVIEW UTILITY CORPORATION PWSOH7500912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NORTHVIEW UTILITY CORP DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

FAIR HAVEN SHELBY COUNTY HOMEOH7501112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558204EP001

Facility Name: FAIR HAVEN-SHELBY CO HOME

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

FAIR HAVEN SHELBY COUNTY HOMEOH7501112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIR HAVEN-SHELBY CO HOME DISTRIBUTIONFacility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIR HAVEN-SHELBY CO HOME DISTRIBUTIONFacility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

FAIR HAVEN SHELBY COUNTY HOMEOH7501112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIR HAVEN-SHELBY CO HOME DISTRIBUTIONFacility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SIDNEY CITY PWSOH7501214

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558205EP001

Facility Name: SIDNEY CITY

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

EP001

Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 7/1/2020 and 9/30/2020

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020

A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.

SIDNEY CITY PWSOH7501214

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558205EP001/LT2001

Facility Name: SIDNEY CITY

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

LT2001

Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1

Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.

*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.

SIDNEY CITY PWSOH7501214

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558205LT2001

Facility Name: SIDNEY CITY

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

LT200

LT2001

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020

Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.

SIDNEY CITY PWSOH7501214

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SIDNEY, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202020TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202020 2/1/2020 andSample(s) Required between 3/31/202020 3/1/2020 andSample(s) Required between 4/30/202020 4/1/2020 andSample(s) Required between 5/31/202020 5/1/2020 andSample(s) Required between 6/30/202020 6/1/2020 andSample(s) Required between 7/31/202020 7/1/2020 andSample(s) Required between 8/31/202020 8/1/2020 andSample(s) Required between 9/30/202020 9/1/2020 andSample(s) Required between 10/31/202020 10/1/2020 andSample(s) Required between 11/30/202020 11/1/2020 andSample(s) Required between 12/31/202020 12/1/2020 and

Sample(s) Required between 1/31/202020TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202020 2/1/2020 andSample(s) Required between 3/31/202020 3/1/2020 andSample(s) Required between 4/30/202020 4/1/2020 andSample(s) Required between 5/31/202020 5/1/2020 andSample(s) Required between 6/30/202020 6/1/2020 andSample(s) Required between 7/31/202020 7/1/2020 andSample(s) Required between 8/31/202020 8/1/2020 andSample(s) Required between 9/30/202020 9/1/2020 andSample(s) Required between 10/31/202020 10/1/2020 andSample(s) Required between 11/30/202020 11/1/2020 andSample(s) Required between 12/31/202020 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SIDNEY, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 620 ARROWHEAD DRIVE

Dual Sample Required between 1/7/2020at: DS201DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2014/1/2020 andDual Sample Required between 7/7/2020at: DS2017/1/2020 and

SIDNEY CITY PWSOH7501214

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SIDNEY, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 620 ARROWHEAD DRIVE

Dual Sample Required between 10/7/2020at: DS201DISINFECTION BYPRODUCTS 10/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SIDNEY, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 890 COUNTRYSIDE STREET

Dual Sample Required between 1/7/2020at: DS202DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2024/1/2020 andDual Sample Required between 7/7/2020at: DS2027/1/2020 andDual Sample Required between 10/7/2020at: DS20210/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SIDNEY, CITY OF DISTRIBUTION Facility Class: CLASS 1DS203 1898 CREEKSIDE COURT

Dual Sample Required between 1/7/2020at: DS203DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2034/1/2020 andDual Sample Required between 7/7/2020at: DS2037/1/2020 andDual Sample Required between 10/7/2020at: DS20310/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SIDNEY, CITY OF DISTRIBUTION Facility Class: CLASS 1DS204 710 COURTER AVENUE

Dual Sample Required between 1/7/2020at: DS204DISINFECTION BYPRODUCTS 1/1/2020 andDual Sample Required between 4/7/2020at: DS2044/1/2020 andDual Sample Required between 7/7/2020at: DS2047/1/2020 and

SIDNEY CITY PWSOH7501214

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SIDNEY, CITY OF DISTRIBUTION Facility Class: CLASS 1DS204 710 COURTER AVENUE

Dual Sample Required between 10/7/2020at: DS204DISINFECTION BYPRODUCTS 10/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: SIDNEY, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

LAKE VIEW VILLAGE MHPOH7501312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558206EP001

Facility Name: LAKE VIEW VILLAGE

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LAKE VIEW VILLAGE MHPOH7501312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE VIEW VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKE VIEW VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

THE WAY INTERNATIONALOH7501412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558207EP001

Facility Name: THE WAY INTERNATIONAL STU 1

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

THE WAY INTERNATIONALOH7501412

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7560597EP002

Facility Name: THE WAY INTERNATIONAL STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

THE WAY INTERNATIONALOH7501412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: THE WAY INTERNATIONAL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: THE WAY INTERNATIONAL DISTRIBUTION Facility Class: CLASS 1DS201 19100 EAST SHELBY ROAD

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

THE WAY INTERNATIONALOH7501412

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: THE WAY INTERNATIONAL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

WEST LAKE VILLAGE MHP PWSOH7501512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558208EP001

Facility Name: WEST LAKE VILLAGE MHP INC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

WEST LAKE VILLAGE MHP PWSOH7501512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WEST LAKE VILLAGE M.H.P. DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WEST LAKE VILLAGE M.H.P. DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

WEST LAKE VILLAGE MHP PWSOH7501512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WEST LAKE VILLAGE M.H.P. DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

LEHMKUHLS LANDING EAST PWS

2020 MONITORING SCHEDULE

OH7501612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LEHMKUHLS LANDING EAST DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LEHMKUHLS LANDING EAST PWS

2020 MONITORING SCHEDULE

OH7501612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LEHMKUHLS LANDING EASTGround Water

7558209

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LEHMKUHLS LANDING-NORTH PWS

2020 MONITORING SCHEDULE

OH7501712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LEHMKUHLS LANDING-NORTH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LEHMKUHLS LANDING-NORTH PWS

2020 MONITORING SCHEDULE

OH7501712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LEHMKUHLS LANDING NORTHGround Water

7558210

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ARROWHEAD PARK GOLF CLUB

2020 MONITORING SCHEDULE

OH7530112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ARROWHEAD PARK GOLF CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ARROWHEAD PARK GOLF CLUB

2020 MONITORING SCHEDULE

OH7530112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ARROWHEAD PARK GOLF CLUBGround Water

7558212

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AUTOVUE DRIVE IN THEATRE

2020 MONITORING SCHEDULE

OH7530212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: AUTOVUE DRIVE IN DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AUTOVUE DRIVE IN THEATRE

2020 MONITORING SCHEDULE

OH7530212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 11/30

06/19/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: AUTOVUE DRIVE IN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/5/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

AUTOVUE DRIVE IN THEATRE

2020 MONITORING SCHEDULE

OH7530212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: AUTOVIEW DRIVE IN THEATREGround Water

7558213

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SHARPS BAR AND GRILL

2020 MONITORING SCHEDULE

OH7530412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SHARPS BAR AND GRILL

2020 MONITORING SCHEDULE

OH7530412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SHARPS BAR AND GRILL PLANTGround Water

7558214

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP QTOKEE

2020 MONITORING SCHEDULE

OH7530712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CAMP QTOKEE DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP QTOKEE

2020 MONITORING SCHEDULE

OH7530712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP QTOKEE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP QTOKEE

2020 MONITORING SCHEDULE

OH7530712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP QTOKEEGround Water

7558216

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KEYHOLE TAVERN

2020 MONITORING SCHEDULE

OH7532312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KEYHOLE TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KEYHOLE TAVERN

2020 MONITORING SCHEDULE

OH7532312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KEYHOLE TAVERNGround Water

7558222

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HUSSEYS RESTAURANT PWS

2020 MONITORING SCHEDULE

OH7532712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HUSSEYS RESTAURANT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HUSSEYS RESTAURANT PWS

2020 MONITORING SCHEDULE

OH7532712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HUSSEYS RESTAURANTGround Water

7558225

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIVERS EDGE SPORTS BAR PWS

2020 MONITORING SCHEDULE

OH7533012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RIVERS EDGE SPORTS BAR DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIVERS EDGE SPORTS BAR PWS

2020 MONITORING SCHEDULE

OH7533012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RIVERS EDGE SPORTS BARGround Water

7558227

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SCUDS LLC

2020 MONITORING SCHEDULE

OH7533512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SCUDS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SCUDS LLC

2020 MONITORING SCHEDULE

OH7533512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SCUDS LLCGround Water

7558228

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

47 BAR AND GRILL

2020 MONITORING SCHEDULE

OH7534412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: 47 BAR AND GRILL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

47 BAR AND GRILL

2020 MONITORING SCHEDULE

OH7534412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: 47 BAR AND GRILL WTPGround Water

7558231

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WESTERN BUCKEYE CHRISTIAN SERVICE CAMP

2020 MONITORING SCHEDULE

OH7535612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WESTERN BUCKEYE CHRISTIAN SERVICE CAMPGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WESTERN BUCKEYE CHRISTIAN SERVICE CAMP

2020 MONITORING SCHEDULE

OH7535612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WESTERN BUCKEYE CHRISTIAN SERVICE CAMPGround Water

7558233

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SHELBY OAKS GOLF CLUB CLUBHOUSE

2020 MONITORING SCHEDULE

OH7536512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SHELBY OAKS GC CLUBHOUSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SHELBY OAKS GOLF CLUB CLUBHOUSE

2020 MONITORING SCHEDULE

OH7536512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SHELBY OAKS GOLF CLUBHOUSEGround Water

7558238

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HONDA - ANNA ENGINE PLANTOH7537812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7558242EP001

Facility Name: HONDA-ANNA ENGINE PLANT

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredDIOXIN - 2063

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

HONDA - ANNA ENGINE PLANTOH7537812

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HONDA-ANNA DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HONDA-ANNA DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

HONDA - ANNA ENGINE PLANTOH7537812

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HONDA-ANNA DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HONDA-ANNA DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CHRIST THE KING CHURCH

2020 MONITORING SCHEDULE

OH7539112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CHRIST THE KING CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHRIST THE KING CHURCH

2020 MONITORING SCHEDULE

OH7539112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHRIST THE KING CHURCHGround Water

7558254

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JOE'S PLACE II

2020 MONITORING SCHEDULE

OH7540312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JOE'S PLACE II DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JOE'S PLACE II

2020 MONITORING SCHEDULE

OH7540312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JOE'S PLACE IIGround Water

7558264

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

STOP 99/L AND O TIRE SERVICE

2020 MONITORING SCHEDULE

OH7540412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: STOP 99/L&O TIRE SERVICE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

STOP 99/L AND O TIRE SERVICE

2020 MONITORING SCHEDULE

OH7540412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: STOP 99/L&O TIRE SERVICEGround Water

7558265

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SHELBY OAKS GOLF CLUB SHELTER HOUSE

2020 MONITORING SCHEDULE

OH7540712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: SHELBY OAKS GOLF CL-SHELTER DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SHELBY OAKS GOLF CLUB SHELTER HOUSE

2020 MONITORING SCHEDULE

OH7540712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 11/30

05/15/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SHELBY OAKS GOLF CL-SHELTER DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/15/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 11/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SHELBY OAKS GOLF CLUB SHELTER HOUSE

2020 MONITORING SCHEDULE

OH7540712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 11/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SHELBY OAKS GOLF CLUB SHELTER HOUSEGround Water

7558268

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CALVARY UNITED BAPTIST CHURCH PWS

2020 MONITORING SCHEDULE

OH7541012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CALVARY UNITED BAPTIST CHURCH DISTRIBUTIGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CALVARY UNITED BAPTIST CHURCH PWS

2020 MONITORING SCHEDULE

OH7541012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CALVARY UNITED BAPTIST CHURCHGround Water

7560778

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

VILLAGE OF RUSSIA PWSOH7541912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7561885EP001

Facility Name: RUSSIA WTP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

VILLAGE OF RUSSIA PWSOH7541912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: RUSSIA DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: RUSSIA DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 3/14/2020at: DS201DISINFECTION BYPRODUCTS 3/8/2020 andDual Sample Required between 6/14/2020at: DS2016/8/2020 andDual Sample Required between 9/14/2020at: DS2019/8/2020 andDual Sample Required between 12/14/2020at: DS20112/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

VILLAGE OF RUSSIA PWSOH7541912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: RUSSIA DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 3/14/2020at: DS202DISINFECTION BYPRODUCTS 3/8/2020 andDual Sample Required between 6/14/2020at: DS2026/8/2020 andDual Sample Required between 9/14/2020at: DS2029/8/2020 andDual Sample Required between 12/14/2020at: DS20212/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: RUSSIA DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SOLID ROCK PENTECOSTAL CHURCH PWS

2020 MONITORING SCHEDULE

OH7542012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SOLID ROCK PENTECOSTAL CHURCH DISTRIBUTIGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SOLID ROCK PENTECOSTAL CHURCH PWS

2020 MONITORING SCHEDULE

OH7542012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SOLID ROCK PENTECOSTAL CHURCHGround Water

7562060

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SIDNEY KINGDOM HALL OF JEHOVAHS WITNESSE

2020 MONITORING SCHEDULE

OH7542212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KINGDOM HALL-SIDNEY DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SIDNEY KINGDOM HALL OF JEHOVAHS WITNESSE

2020 MONITORING SCHEDULE

OH7542212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KINGDOM HALL-SIDNEYGround Water

7562194

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HOUSTON K-12 SCHOOLOH7542312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7562324EP001

Facility Name: HARDIN HOUSTON K-12

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 5/31/2020

HOUSTON K-12 SCHOOLOH7542312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARDIN HOUSTON K-12 DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARDIN HOUSTON K-12 DISTRIBUTION Facility Class: CLASS 1DS201 ROOM 212 UPSTAIRS MENS RR

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARDIN HOUSTON K-12 DISTRIBUTION Facility Class: CLASS 1DS202 ROOM 235 UPSTAIRS MENS RR

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HARDIN HOUSTON K-12 DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

NEW LIFE CHURCH PJBC PWS

2020 MONITORING SCHEDULE

OH7542412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NEW LIFE CHURCH PJBC DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NEW LIFE CHURCH PJBC PWS

2020 MONITORING SCHEDULE

OH7542412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NEW LIFE CHURCH PJBC

7562351

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

FAIRLAWN K-12 SCHOOLOH7542512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7562397EP001

Facility Name: FAIRLAWN K-12 SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

FAIRLAWN K-12 SCHOOLOH7542512

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIRLAWN K-12 SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIRLAWN K-12 SCHOOL DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIRLAWN K-12 SCHOOL DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FAIRLAWN K-12 SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SIDNEY NEW HOPE UNITED METH CHURCH

2020 MONITORING SCHEDULE

OH7542612 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NEW HOPE UNITED METH CHURCH DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SIDNEY NEW HOPE UNITED METH CHURCH

2020 MONITORING SCHEDULE

OH7542612 Transient NoncommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NEW HOPE UNITED METH CHURCHGround Water

7562409

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #20464 - HOUSTON

2020 MONITORING SCHEDULE

OH7542713 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DOLLAR GENERAL HOUSTON DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #20464 - HOUSTON

2020 MONITORING SCHEDULE

OH7542713 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL HOUSTON PLANTGround Water

7562501

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or