Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER...

159
BERLIN WATER COMPANY OH3800012 ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE 01/01/2013 Effective Date: Community System Type: THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM. Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378 ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013 Chemicals Monitoring Requirements Operating Period: to 1/1 12/31 Sampling Location Facility ID: SMP ID: 3860522 EP002 Facility Source: Ground Water Facility Class: CLASS 1 Facility Name: BERLIN WATER CO. STU 2 Not Required INORGANICS Not Required NITRITE - 1041 Sample(s) Required between NITRATE - 1040 1 and 1/1/2013 5/31/2013 Not Required RADIOLOGICALS Not Required SYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 Not Required VOLATILE ORGANIC CHEMICALS (VOC)

Transcript of Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER...

Page 1: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BERLIN WATER COMPANYOH3800012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3860522

EP002 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: BERLIN WATER CO. STU 2

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 2: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BERLIN WATER COMPANYOH3800012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3860524

EP004 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: BERLIN WATER CO. STU 4

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 3: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BERLIN WATER COMPANYOH3800012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3861443

EP005 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: BERLIN WATER CO STU 5

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 4: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BERLIN WATER COMPANYOH3800012

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: BERLIN WATER COMPANY DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

Not RequiredASBESTOS - 1094

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

2 Sample(s) Required between 2/1/2013 and 2/28/2013

2 Sample(s) Required between 3/1/2013 and 3/31/2013

2 Sample(s) Required between 4/1/2013 and 4/30/2013

2 Sample(s) Required between 5/1/2013 and 5/31/2013

2 Sample(s) Required between 6/1/2013 and 6/30/2013

2 Sample(s) Required between 7/1/2013 and 7/31/2013

2 Sample(s) Required between 8/1/2013 and 8/31/2013

2 Sample(s) Required between 9/1/2013 and 9/30/2013

2 Sample(s) Required between 10/1/2013 and 10/31/2013

2 Sample(s) Required between 11/1/2013 and 11/30/2013

2 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

2 Sample(s) Required between 2/1/2013 and 2/28/2013

2 Sample(s) Required between 3/1/2013 and 3/31/2013

2 Sample(s) Required between 4/1/2013 and 4/30/2013

2 Sample(s) Required between 5/1/2013 and 5/31/2013

2 Sample(s) Required between 6/1/2013 and 6/30/2013

2 Sample(s) Required between 7/1/2013 and 7/31/2013

2 Sample(s) Required between 8/1/2013 and 8/31/2013

2 Sample(s) Required between 9/1/2013 and 9/30/2013

2 Sample(s) Required between 10/1/2013 and 10/31/2013

2 Sample(s) Required between 11/1/2013 and 11/30/2013

2 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: BERLIN WATER COMPANY DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 5: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BERLIN WATER COMPANYOH3800012

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: BERLIN WATER COMPANY DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 6: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BIG PRAIRIE WATER CO.OH3800112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855116

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: BIG PRAIRIE MUTUAL WATER CO

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 7: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BIG PRAIRIE WATER CO.OH3800112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: BIG PRAIRIE WATER CO. DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: BIG PRAIRIE WATER CO. DISTRIBUTION

ADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 8: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GLENMONT VILLAGE PWSOH3800312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855117

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: GLENMONT WTP

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and4/1/2013 6/30/2013

Page 9: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GLENMONT VILLAGE PWSOH3800312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: GLENMONT,VILLAGE OF DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

Not RequiredASBESTOS - 1094

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: GLENMONT,VILLAGE OF DISTRIBUTION

ADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 10: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HILLTOP GROUP HOME INC. PWSOH3800412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855118

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HILLTOP GROUP HOME, INC

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 11: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HILLTOP GROUP HOME INC. PWSOH3800412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HILLTOP GROUP HOME INC. DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: HILLTOP GROUP HOME INC. DISTRIBUTION

ADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 12: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES COUNTY JAILOH3800512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855119

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HOLMES COUNTY JAIL

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 13: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES COUNTY JAILOH3800512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HOLMES COUNTY JAIL DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: HOLMES COUNTY JAIL DISTRIBUTION

8105 T.R. 574

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 14: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KILLBUCK VILLAGE PWSOH3800712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855120

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: KILLBUCK VILLAGE

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2013 3/31/2013

Sample(s) Required between1 and4/1/2013 6/30/2013

Sample(s) Required between1 and7/1/2013 9/30/2013

Sample(s) Required between1 and10/1/2013 12/31/2013

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 15: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KILLBUCK VILLAGE PWSOH3800712

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: KILLBUCK, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: KILLBUCK, VILLAGE OF DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 16: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KILLBUCK VILLAGE PWSOH3800712

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: KILLBUCK, VILLAGE OF DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 17: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BLOOMFIELD WATER COMPANYOH3800812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855121

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: BLOOMFIELD WATER CO

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 18: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BLOOMFIELD WATER COMPANYOH3800812

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: BLOOMFIELD WATER COMPANY DISTRIBUTIONFacility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

Not RequiredASBESTOS - 1094

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: BLOOMFIELD WATER COMPANY DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 19: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BLOOMFIELD WATER COMPANYOH3800812

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: BLOOMFIELD WATER COMPANY DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 20: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MILLERSBURG VILLAGE PWSOH3800912

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855122

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: MILLERSBURG VILLAGE

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 21: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MILLERSBURG VILLAGE PWSOH3800912

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: MILLERSBURG, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

Not RequiredASBESTOS - 1094

3 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

3 Sample(s) Required between 2/1/2013 and 2/28/2013

3 Sample(s) Required between 3/1/2013 and 3/31/2013

3 Sample(s) Required between 4/1/2013 and 4/30/2013

3 Sample(s) Required between 5/1/2013 and 5/31/2013

3 Sample(s) Required between 6/1/2013 and 6/30/2013

3 Sample(s) Required between 7/1/2013 and 7/31/2013

3 Sample(s) Required between 8/1/2013 and 8/31/2013

3 Sample(s) Required between 9/1/2013 and 9/30/2013

3 Sample(s) Required between 10/1/2013 and 10/31/2013

3 Sample(s) Required between 11/1/2013 and 11/30/2013

3 Sample(s) Required between 12/1/2013 and 12/31/2013

3 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

3 Sample(s) Required between 2/1/2013 and 2/28/2013

3 Sample(s) Required between 3/1/2013 and 3/31/2013

3 Sample(s) Required between 4/1/2013 and 4/30/2013

3 Sample(s) Required between 5/1/2013 and 5/31/2013

3 Sample(s) Required between 6/1/2013 and 6/30/2013

3 Sample(s) Required between 7/1/2013 and 7/31/2013

3 Sample(s) Required between 8/1/2013 and 8/31/2013

3 Sample(s) Required between 9/1/2013 and 9/30/2013

3 Sample(s) Required between 10/1/2013 and 10/31/2013

3 Sample(s) Required between 11/1/2013 and 11/30/2013

3 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: MILLERSBURG, VILLAGE OF DISTRIBUTION

940 EAST JACKSON STREET

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 22: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MILLERSBURG VILLAGE PWSOH3800912

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: MILLERSBURG, VILLAGE OF DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 23: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

NASHVILLE VILLAGE PWSOH3801012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855123

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: NASHVILLE VILLAGE

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 24: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

NASHVILLE VILLAGE PWSOH3801012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: NASHVILLE, VILLAGE OF DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: NASHVILLE, VILLAGE OF DISTRIBUTION

ADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 25: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CASTLE NURSING HOMES, INC PWSOH3801112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855124

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: CASTLE NURSING HOMES INC

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 26: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CASTLE NURSING HOMES, INC PWSOH3801112

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/11/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: CASTLE NURSING HOMES,INC DISTRIBUTION Facility Class: CLASS 1

10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

1 Sample(s) Required between 2/1/2013 and 2/28/2013

1 Sample(s) Required between 3/1/2013 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 4/30/2013

1 Sample(s) Required between 5/1/2013 and 5/31/2013

1 Sample(s) Required between 6/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 7/31/2013

1 Sample(s) Required between 8/1/2013 and 8/31/2013

1 Sample(s) Required between 9/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 10/31/2013

1 Sample(s) Required between 11/1/2013 and 11/30/2013

1 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: CASTLE NURSING HOMES,INC DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 27: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CASTLE NURSING HOMES, INC PWSOH3801112

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/11/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: CASTLE NURSING HOMES,INC DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 28: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WINESBURG AREA DEVELOPMENT CORPORATIONOH3801412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855125

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: WINESBURG AREA DEV CORP

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 29: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WINESBURG AREA DEVELOPMENT CORPORATIONOH3801412

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: WINESBURG AREA DEV. CORP DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

2 Sample(s) Required between 2/1/2013 and 2/28/2013

2 Sample(s) Required between 3/1/2013 and 3/31/2013

2 Sample(s) Required between 4/1/2013 and 4/30/2013

2 Sample(s) Required between 5/1/2013 and 5/31/2013

2 Sample(s) Required between 6/1/2013 and 6/30/2013

2 Sample(s) Required between 7/1/2013 and 7/31/2013

2 Sample(s) Required between 8/1/2013 and 8/31/2013

2 Sample(s) Required between 9/1/2013 and 9/30/2013

2 Sample(s) Required between 10/1/2013 and 10/31/2013

2 Sample(s) Required between 11/1/2013 and 11/30/2013

2 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

2 Sample(s) Required between 2/1/2013 and 2/28/2013

2 Sample(s) Required between 3/1/2013 and 3/31/2013

2 Sample(s) Required between 4/1/2013 and 4/30/2013

2 Sample(s) Required between 5/1/2013 and 5/31/2013

2 Sample(s) Required between 6/1/2013 and 6/30/2013

2 Sample(s) Required between 7/1/2013 and 7/31/2013

2 Sample(s) Required between 8/1/2013 and 8/31/2013

2 Sample(s) Required between 9/1/2013 and 9/30/2013

2 Sample(s) Required between 10/1/2013 and 10/31/2013

2 Sample(s) Required between 11/1/2013 and 11/30/2013

2 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: WINESBURG AREA DEV. CORP DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 30: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WINESBURG AREA DEVELOPMENT CORPORATIONOH3801412

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: WINESBURG AREA DEV. CORP DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 31: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT CREEK WATER CO.OH3801512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855126

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: WALNUT CREEK WATER CO. STU 1

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 32: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT CREEK WATER CO.OH3801512

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: WALNUT CREEK WATER CO. DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

Not RequiredASBESTOS - 1094

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/2013

2 Sample(s) Required between 2/1/2013 and 2/28/2013

2 Sample(s) Required between 3/1/2013 and 3/31/2013

2 Sample(s) Required between 4/1/2013 and 4/30/2013

2 Sample(s) Required between 5/1/2013 and 5/31/2013

2 Sample(s) Required between 6/1/2013 and 6/30/2013

2 Sample(s) Required between 7/1/2013 and 7/31/2013

2 Sample(s) Required between 8/1/2013 and 8/31/2013

2 Sample(s) Required between 9/1/2013 and 9/30/2013

2 Sample(s) Required between 10/1/2013 and 10/31/2013

2 Sample(s) Required between 11/1/2013 and 11/30/2013

2 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/2013

2 Sample(s) Required between 2/1/2013 and 2/28/2013

2 Sample(s) Required between 3/1/2013 and 3/31/2013

2 Sample(s) Required between 4/1/2013 and 4/30/2013

2 Sample(s) Required between 5/1/2013 and 5/31/2013

2 Sample(s) Required between 6/1/2013 and 6/30/2013

2 Sample(s) Required between 7/1/2013 and 7/31/2013

2 Sample(s) Required between 8/1/2013 and 8/31/2013

2 Sample(s) Required between 9/1/2013 and 9/30/2013

2 Sample(s) Required between 10/1/2013 and 10/31/2013

2 Sample(s) Required between 11/1/2013 and 11/30/2013

2 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: WALNUT CREEK WATER CO. DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 33: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT CREEK WATER CO.OH3801512

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: WALNUT CREEK WATER CO. DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 34: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOMESTEAD RESTAURANT

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3830212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: HOMESTEAD RESTAURANT DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: HOMESTEAD RESTAURANT

Ground Water

3855131

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 35: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BUNKERHILL CHEESE CO.OH3830712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855133

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: BUNKER HILL CHEESE CO INC

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 36: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BUNKERHILL CHEESE CO.OH3830712

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: BUNKERHILL CHEESE CO. DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 37: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP TOODIK-RIVER

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3830912

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: CAMP TOODIK RIVER WELL DISTRIBUTION

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: CAMP TOODIK-RIVER

Ground Water

3855135

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 38: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP TOODIK PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3831012

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: CAMP TOODIK DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: CAMP TOODIK-WORKSHOP STU 1

Ground Water

3855134

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 39: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CLARK ELEMENTARY SCHOOLOH3831112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855137

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: CLARK ELEM SCH

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 40: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CLARK ELEMENTARY SCHOOLOH3831112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: CLARK ELEMENTARY SCHOOL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 41: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

IRON PONY SALOON PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3831312

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: IRON PONY SALOON DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: IRON PONY SALOON WELL 0001

Ground Water

3855138

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 42: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FLAT RIDGE ELEMENTARY SCHOOLOH3832412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to8/1 5/31

Sampling

Location

Facility ID:

SMP ID:

3855141

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: FLAT RIDGE ELEMENTARY SCHOOL

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 43: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FLAT RIDGE ELEMENTARY SCHOOLOH3832412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to8/1 5/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: FLAT RIDGE ELEMENTARY SC DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 44: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES COUNTY GARAGEOH3833012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855142

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HOLMES COUNTY GARAGE

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 45: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES COUNTY GARAGEOH3833012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HOLMES COUNTY GARAGE DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 46: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES LUMBER AND BUILDINGOH3833212

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855143

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HOLMES LUMBER AND BLDG CENTER

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 47: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES LUMBER AND BUILDINGOH3833212

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HOLMES LUMBER AND BLDG DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 48: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES COUNTY TRAINING CENTEROH3833312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855144

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HOLMES CO TRAINING CENTER

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013

Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 49: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES COUNTY TRAINING CENTEROH3833312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HOLMES CO. TRAIN. CENTER DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 50: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMESVILLE CHURCH OF CHRIST

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3833512

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: HOLMESVILLE CH OF CHRIST DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: HOLMESVILLE CHURCH OF CHRIST

Ground Water

3855146

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 51: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LAKEVILLE ELEMENTARY SCHOOLOH3833912

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855148

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: LAKEVILLE ELEM SCH

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 52: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LAKEVILLE ELEMENTARY SCHOOLOH3833912

Page 1 of 1

2013 DISTRIBUTION SCHEDULE02/15/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: LAKEVILLE ELEM. SCHOOL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 53: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LONG LAKE PARK AND CAMPGROUND WEST

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3834212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: LONG LAKE PARK & CAMPGRO DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: LONG LAKE PARK & CAMPGROUND W

Ground Water

3855149

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 54: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LONG LAKE PARK AND CAMPGROUND EAST

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3834312

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: LONG LAKE PARK & CAMPGRO DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: LONG LAKE PARK & CAMPGROUND E

Ground Water

3855150

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 55: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OCTOBER HILL CAMPLOT OWN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3835312

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: OCTOBER HILL CAMPLOT OWN DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: OCTOBER HILL CAMPLOT OWN ASSN

Ground Water

3855155

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 56: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

YODER LUMBER CO. - BUCKHORN DIVISION PWSOH3835412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855156

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: YODER LUMBER CO - BUCKHORN DIVISION

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 57: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

YODER LUMBER CO. - BUCKHORN DIVISION PWSOH3835412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: YODER LUMBER CO. - BUCKHORN DIVISION DISFacility Class: CLASS 1

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 58: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SMITHS PLEASANT VALLEY PWS

Page 1 of 2

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3835612

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 11/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: SMITHS PLEASANT VALLEY DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: SMITHS PLEASANT VALLEY CAMP STU 1

Ground Water Facility Class: CLASS A

3855157

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 59: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SMITHS PLEASANT VALLEY PWS

Page 2 of 2

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3835612

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 11/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: SMITHS PLEASANT VALLEY DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP002 Facility Source:

Facility Name: SMITHS PLEASANT VALLEY CAMP STU 2

Ground Water Facility Class: CLASS A

3860527

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP002

DS000

* If system does not have treatment, EP002 is the first tap after the well.

Page 60: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SKYVIEW BAPTIST RANCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3836812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: SKYVIEW BAPTIST RANCH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: SKYVIEW BAPTIST RANCH

Ground Water Facility Class: CLASS A

3855159

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 61: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

TROYERS TRAIL BOLOGNA PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3837312

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: TROYERS TRAIL BOLOGNA, DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: TROYERS TRAIL BOLOGNA INC

Ground Water

3855161

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 62: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KORNER KITCHEN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3837712

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: KORNER KITCHEN DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: KORNER KITCHEN

Ground Water

3855162

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 63: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALLY WORLD RESORTS INC

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3838012

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: WALLY WORLD RESORTS INC DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: WALLY WORLD RESORTS INC MIDDLE

Ground Water

3855163

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 64: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OVERHEAD DOOR WD MAIN PLANTOH3838312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855164

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: OVERHEAD DOOR WD MAIN PLANT

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 65: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OVERHEAD DOOR WD MAIN PLANTOH3838312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: OVERHEAD DOOR WD MAIN PLANT DISTRIBUTIONFacility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: OVERHEAD DOOR WD MAIN PLANT DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: OVERHEAD DOOR WD MAIN PLANT DISTRIBUTION

ADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 66: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WHISPERING HILLS-SOUTH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3838612

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: WHISPERING HILLS-SOUTH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: WHISPERING HILLS CAMP

Ground Water

3855165

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 67: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WEST HOLMES MIDDLE SCHOOLOH3838712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855166

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: WEST HOLMES MIDDLE SCHOOL

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 68: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WEST HOLMES MIDDLE SCHOOLOH3838712

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: WEST HOLMES MIDDLE SCHOOL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 69: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WISE ELEMENTARY SCHOOLOH3838912

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to8/1 5/31

Sampling

Location

Facility ID:

SMP ID:

3855167

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: WISE ELEMENTARY SCHOOL

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 70: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WISE ELEMENTARY SCHOOLOH3838912

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to8/1 5/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: WISE ELEMENTARY SCHOOL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 71: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ZION CHRISTIAN SCHOOLOH3839412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to9/1 5/31

Sampling

Location

Facility ID:

SMP ID:

3855169

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: ZION CHRISTIAN SCHOOL

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 72: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ZION CHRISTIAN SCHOOLOH3839412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to9/1 5/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: ZION CHRISTIAN SCHOOL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 73: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ALPINE RESORT

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3839712

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: ALPINE RESORT DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: ALPINE RESORT

Ground Water

3855172

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 74: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COUNTRY SIDE CHAPEL

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3840012

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: COUNTRY SIDE CHAPEL DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: COUNTRYSIDE CHAPEL

Ground Water

3855174

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 75: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GRAY RIDGE CHURCH PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3840212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: GRAY RIDGE CH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: GRAY RIDGE CHURCH

Ground Water

3855176

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 76: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LONGENECKER MENNONITE CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3840812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: LONGENECKER MENNONITE CH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: LONGENECKER MENNONITE CHURCH

Ground Water

3855180

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 77: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PLEASANT VIEW MENNONITE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3841212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: PLEASANT VIEW MENNONITE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: PLEASANT VIEW MENNONITE CHURCH

Ground Water

3855182

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 78: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

RIPLEY CHURCH OF CHRIST

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3841312

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: RIPLEY CHURCH OF CHRIST DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: RIPLEY CHURCH OF CHRIST

Ground Water Facility Class: CLASS A

3855183

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 79: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LIVING WORD FELLOWSHIP PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3841512

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: SHILOH FELLOWSHIP CHURCH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: LIVING WORD FELLOWSHIP

Ground Water

3855184

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 80: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ZION MENNONITE CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3841712

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: ZION MENNONITE CHURCH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: ZION MENNONITE CHURCH

Ground Water

3855186

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 81: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LAKEVILLE UNITED METHODIST

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3841912

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: LAKEVILLE UNITED METHODI DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: LAKEVILLE UNITED METHODIST CHURCH

Ground Water

3855187

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 82: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CHARM ELEMENTARY SCHOOLOH3842012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to9/1 6/30

Sampling

Location

Facility ID:

SMP ID:

3855188

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: CHARM ELEMENTARY SCHOOL

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 83: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CHARM ELEMENTARY SCHOOLOH3842012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to9/1 6/30

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: CHARM ELEMENTARY SCHOOL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 84: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PENIEL FELLOWSHIP CHURCHOH3842112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855189

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: PENIEL FELLOWSHIP CHURCH

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 85: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PENIEL FELLOWSHIP CHURCHOH3842112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: PENIEL FELLOWSHIP CHURCH DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 86: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMESVILLE ELEMENTARYOH3842212

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to9/1 6/30

Sampling

Location

Facility ID:

SMP ID:

3855190

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HOLMESVILLE ELEMENTARY

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 3/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013

Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 87: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMESVILLE ELEMENTARYOH3842212

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to9/1 6/30

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HOLMESVILLE ELEMENTARY DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 88: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

IAC HOLMESVILLE, LLC PWSOH3842412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855191

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: IAC PROD CO

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and10/1/2013 12/31/2013

Page 89: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

IAC HOLMESVILLE, LLC PWSOH3842412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: IAC DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 90: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LIGHT IN THE VALLEY CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3842512

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: LIGHT IN THE VALLEY CHUR DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: LIGHT IN THE VALLEY CHURCH

Ground Water

3855192

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 91: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AMISH AND MENNONITE HERITAGE CENTER

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3842612

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: AMISH AND MENNONITE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: AMISH AND MENNONITE HERITAGE CENTER

Ground Water

3855193

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 92: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GOSPEL LIGHT CHAPEL

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3842812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: GOSPEL LIGHT CHAPEL DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: GOSPEL LIGHT CHAPEL

Ground Water

3855195

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 93: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CHALET IN THE VALLEYOH3843212

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855198

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: CHALET IN THE VALLEY

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 94: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CHALET IN THE VALLEYOH3843212

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: CHALET IN THE VALLEY DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

Not RequiredDISINFECTION BYPRODUCTS

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Page 95: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FARMERSTOWN COMMUNITY LIVESTOCK AUCTION

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3843312

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: FARMERSTOWN AUCTION, INC. DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: FARMERSTOWN AUCTION, INC

Ground Water

3855199

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 96: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OVERHEAD DOOR WD HEADQUARTEROH3843612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855201

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: OVERHEAD DOOR WD CORP

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 97: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OVERHEAD DOOR WD HEADQUARTEROH3843612

Page 1 of 1

2013 DISTRIBUTION SCHEDULE02/15/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: OVERHEAD DOOR WDHEADQUARTER DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 98: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CORNERSTONE COMMUNITY CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3843812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: CORNERSTONE COMMUNITY CH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: CORNERSTONE COMMUNITY CHURCH

Ground Water

3855203

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 99: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

INN AT HONEY RUNOH3843912

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3855204

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: INN AT HONEY RUN

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 100: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

INN AT HONEY RUNOH3843912

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: INN AT HONEY RUN DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: INN AT HONEY RUN DISTRIBUTION

ADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 101: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GUGGISBERG SWISS INN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3844212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: GUGGISBERG SWISS INN DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: GUGGISBERG SWISS INN

Ground Water

3855205

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 102: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GRACE BRETHREN CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3844412

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: GRACE BRETHREN CHURCH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: GRACE BRETHREN CHURCH

Ground Water

3855207

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 103: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MILLERSBURG UNITED METHODIST CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3844812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: MILLERSBURG UN METH CH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: MILLERSBURG UNITED METH CHURCH

Ground Water

3855211

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 104: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MOHICAN RIVER INN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3844912

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: MOHICAN RIVER LODGE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: MOHICAN RIVER INN

Ground Water

3855212

Not RequiredNITRITE - 1041

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 105: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ARROWPOINT CAMPGROUND-EAST PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3845012

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: ARROWPOINT CAMPGROUND-EA DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: ARROW POINT CAMPGROUND EAST

Ground Water

3855213

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 106: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BAUERS CAMP NORTH WELL PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3845112

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: BAUERS CAMP NORTH WELL DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: BAUERS CAMP NORTH WELL

Ground Water

3855214

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 107: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BAUERS CAMP SOUTH WELL PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3845212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: BAUERS CAMP SOUTH WELL DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: BAUERS CAMP SOUTH WELL

Ground Water

3855215

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 108: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CABIN CREEK GOLF

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3845412

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: CABIN CREEK GOLF DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: CABIN CREEK GOLF

Ground Water

3855217

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 109: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP BETHANY-MAIN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3845512

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: CAMP BETHANY-MAIN DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: CAMP BETHANY

Ground Water

3855218

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 110: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CHARM COUNTRYVIEW INN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3845612

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: CHARM COUNTRYVIEW INN DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: CHARM COUNTRYVIEW INN INC

Ground Water

3855219

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 111: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FINNEYS MARATHON PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3845812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: FINNEYS MARATHON DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: FINNEYS MARATHON

Ground Water

3855221

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 112: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PAUL'S STEAKHOUSE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846012

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: PAUL'S STEAKHOUSE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: PAUL'S STEAKHOUSE TREATMENT PLANT

Ground Water

3855222

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 113: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMESVILLE BELL STORES

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846112

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: HOLMESVILL BELL STORES DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: HOLMESVILLE BELL STORES

Ground Water

3855223

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 114: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP BETHANY - BATHHOUSE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: CAMP BETHANY - BATHHOUSE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: CAMP BETHANY BATHHOUSE

Ground Water

3855224

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 115: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KILLBUCK VALLEY CHRISTIAN CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846412

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: KILLBUCK VALLEY CHRISTIA DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: KILLBUCK VALLEY CHRISTIAN CHURCH

Ground Water

3855226

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 116: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

POMERENE MEMORIAL HOSPITAL

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846612

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: POMERENE MEMORIAL HOSPITAL DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: POMERENE MEMORIAL HOSPITAL

Ground Water

3855228

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 117: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ARROWPOINT CAMPGROUND-WEST PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846712

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: ARROWPOINT CAMPGROUND-WE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: ARROWPOINT CAMPGROUND WEST

Ground Water

3855229

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 118: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WHISPERING HILLS-NORTH

Page 1 of 2

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: WHISPERING HILLS-NORTH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP002 Facility Source:

Facility Name: WHISPERING HILLS NORTH

Ground Water

3855230

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP002

DS000

* If system does not have treatment, EP002 is the first tap after the well.

Page 119: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WHISPERING HILLS-NORTH

Page 2 of 2

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: WHISPERING HILLS-NORTH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP003 Facility Source:

Facility Name: WHISPERING HILLS NORTH STU 2

Ground Water

3861927

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP003

DS000

* If system does not have treatment, EP003 is the first tap after the well.

Page 120: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

RT. 83 RESTAURANT

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3846912

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: RT. 83 RESTAURANT DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: RT 83 RESTAURANT

Ground Water

3855231

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 121: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GRACE HAVEN FELLOWSHIP

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3847012

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: GRACE HAVEN FELLOWSHIP DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: GRACE HAVEN FELLOWSHIP CHURCH

Ground Water

3855232

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 122: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GUGGISBERG CHEESE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3847212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: GUGGISBERG CHEESE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: GUGGISBERG CHEESE

Ground Water

3855234

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 123: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WEAVER LEATHER LLCOH3847612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3860730

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: WEAVER LEATHER LLC

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013

Page 124: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WEAVER LEATHER LLCOH3847612

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: WEAVER LEATHER LLC DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 125: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES COUNTY TRAINING CENTER 2 PWSOH3847712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3860729

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HOLMES COUNTY TRAINING CENTER (2)

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013

Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 126: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES COUNTY TRAINING CENTER 2 PWSOH3847712

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HOLMES COUNTY TRAINING CENTER (2) DISTRI

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 127: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WEST HOLMES HIGH SCHOOLOH3847812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3860683

EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: WEST HOLMES HIGH SCHOOL

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

Page 128: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WEST HOLMES HIGH SCHOOLOH3847812

Page 1 of 1

2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: WEST HOLMES HIGH SCHOOL DISTRIBUTION

10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS201

Facility Name: WEST HOLMES HIGH SCHOOL DISTRIBUTION

ADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS202

Facility Name: WEST HOLMES HIGH SCHOOL DISTRIBUTION

ADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 129: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

3M ASSOCIATES, LTD. PLANT PWSOH3848112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3860743

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: 3M ASSOCIATES LTD

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013

Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013

Page 130: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

3M ASSOCIATES, LTD. PLANT PWSOH3848112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: 3M ASSOCIATES, LTD. DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 131: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BLACK DIAMOND GOLF COURSE PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3848212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: BLACK DIAMOND GOLF COURSE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: BLACK DIAMOND GOLF COURSE

Ground Water

3860755

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 132: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COMMUNITY BIBLE CHURCH PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3848312

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: COMMUNITY BIBLE CHURCH DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: COMMUNITY BIBLE CHURCH

Ground Water

3860787

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 133: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

F D HARDWOODS PWSOH3848712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3861441

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: F D HARDWOODS

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 134: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

F D HARDWOODS PWSOH3848712

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: F D HARDWOODS DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 135: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SKYVIEW BAPTIST RANCH-DINING HALL PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3848812

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: SKYVIEW BAPTIST RANCH-DINING HALL DISTRI

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: SKYVIEW BAPTIST RANCH-DINING HALL

Ground Water Facility Class: CLASS A

3861550

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 136: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES BY PRODUCTS PWSOH3849012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3861706

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HOLMES BY-PRODUCTS

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013

Page 137: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES BY PRODUCTS PWSOH3849012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HOLMES BY PRODUCTS DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 138: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

VALLEY VIEW OAK LLC PWSOH3849112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3861730

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: VALLEY VIEW OAK LLC

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 139: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

VALLEY VIEW OAK LLC PWSOH3849112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: VALLEY VIEW OAK LLC DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 140: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LOUDONVILLE BAPTIST TEMPLE PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3849312

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: LOUDONVILLE BAPTIST TEMPLE DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: LOUDONVILLE BAPTIST TEMPLE

Ground Water

3861740

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 141: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES-WAYNE ELECTRIC COOPERATIVE INC PWOH3849512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3861962

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HOLMES-WAYNE ELECTRIC COOPERATIVE INC

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 142: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HOLMES-WAYNE ELECTRIC COOPERATIVE INC PWOH3849512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HOLMES-WAYNE ELECTRIC COOPERATIVE DISTRI

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 143: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KANDEL RV AND CAMPING PARK PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3849612

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: KANDEL RV AND CAMPING PARK DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: KANDEL RV AND CAMPING PARK

Ground Water

3862004

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 144: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KEIM LUMBER INC PWS 2OH3849812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3862118

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: KEIM LUMBER CO

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2013 3/31/2013

Sample(s) Required between1 and4/1/2013 6/30/2013

Sample(s) Required between1 and7/1/2013 9/30/2013

Sample(s) Required between1 and10/1/2013 12/31/2013

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 145: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KEIM LUMBER INC PWS 2OH3849812

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: KEIM LUMBER INC DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 146: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FAITH HAVEN FELLOWSHIP PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3849912

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: FAITH HAVEN FELLOWSHIP DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: FAITH HAVEN FELLOWSHIP

Ground Water

3862128

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 147: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT CREEK FLEA MARKET EXCHANGE PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/11/2013Effective Date:

OH3850012

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: WALNUT CREEK FLEA MKT EXCHG DISTRIBUTION

Ground Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: WALNUT CREEK FLEA MARKET EXCHANGE

Ground Water

3862300

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 148: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

NASHVILLE CHURCH OF CHRIST PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3850212

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: NASHVILLE CHURCH OF CHRIST DISTRIBUTION

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: NASHVILLE CHURCH OF CHRIST

3862365

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 149: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PROVIA DOOR PWSOH3850312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3862378

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: PROVIA DOOR

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013

Sample(s) Required between1 and4/1/2013 6/30/2013

Sample(s) Required between1 and7/1/2013 9/30/2013

Sample(s) Required between1 and10/1/2013 12/31/2013

Page 150: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PROVIA DOOR PWSOH3850312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: PROVIA DOOR DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 151: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MILLERSBURG WEST BELLSTORE PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH3850412

Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

DS000 Facility Source:

Facility Name: MILLERSBURG WEST BELLSTORE DISTRIBUTION

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013

Sample(s) Required between 4/1/20131 and 6/30/2013

Sample(s) Required between 7/1/20131 and 9/30/2013

Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

Sampling

Location SMP ID:

Facility ID:

EP001 Facility Source:

Facility Name: MILLERSBURG WEST BELLSTORE

Ground Water

3862380

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* Pressure

Tank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

Distribution

System

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 152: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GOSPEL HAVEN MENNONITE CHURCH PWSOH3850512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3862396

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: GOSPEL HAVEN MENNONITE CHURCH

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 153: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GOSPEL HAVEN MENNONITE CHURCH PWSOH3850512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: GOSPEL HAVEN MENNONITE CHURCH DISTRIBUTI

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 154: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT CREEK PLANING PWSOH3850612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3862407

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: WALNUT CREEK PLANING

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and

Page 155: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT CREEK PLANING PWSOH3850612

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: WALNUT CREEK PLANING DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 156: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HONEY RUN CHRISTIAN SCHOOL PWSOH3850712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3862473

EP001 Facility Source: Ground Water

Facility Name: HONEY RUN CHRISTIAN SCHOOL

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 5/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013

Sample(s) Required between1 and4/1/2013 6/30/2013

Sample(s) Required between1 and7/1/2013 9/30/2013

Sample(s) Required between1 and10/1/2013 12/31/2013

Page 157: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HONEY RUN CHRISTIAN SCHOOL PWSOH3850712

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: HONEY RUN CHRISTIAN SCHOOL DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 158: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CKS PROPERTIES INC PWSOH3850812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

Sampling

Location

Facility ID:

SMP ID:

3862509

EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: CKS PROPERTIES INC

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 159: Ohio EPA Homeepa.ohio.gov/Portals/28/documents/schedules/2013/Holmes.pdf · OH3800012 BERLIN WATER COMPANY ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CKS PROPERTIES INC PWSOH3850812

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

Sampling

Location

Sampling

Location SMP ID:

Facility ID: DS1

DS000

Facility Name: CKS PROPERTIES INC DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/2013

1 Sample(s) Required between 4/1/2013 and 6/30/2013

1 Sample(s) Required between 7/1/2013 and 9/30/2013

1 Sample(s) Required between 10/1/2013 and 12/31/2013