2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 OH8600012 BRYAN … · 2020-04-17 ·...
Transcript of 2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 OH8600012 BRYAN … · 2020-04-17 ·...
BRYAN CITYOH8600012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659808EP001
Facility Name: BRYAN CITY
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 2Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
BRYAN CITYOH8600012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BRYAN CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BRYAN CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1DS201 107 DOROTHY DRIVE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
BRYAN CITYOH8600012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BRYAN CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1DS202 1407 SOUTH MAIN STREET
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: BRYAN CITY DISTRIBUTION SYSTEM Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
EDGERTON VILLAGEOH8600312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659810EP001
Facility Name: EDGERTON VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
EDGERTON VILLAGEOH8600312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDGERTON VILLAGE DISTRIBUTION SYSTEM Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDGERTON VILLAGE DISTRIBUTION SYSTEM Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
EDGERTON VILLAGEOH8600312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDGERTON VILLAGE DISTRIBUTION SYSTEM Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDGERTON VILLAGE DISTRIBUTION SYSTEM Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
EDON VILLAGEOH8600512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659812EP001
Facility Name: EDON VILLAGE WTP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
EDON VILLAGEOH8600512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 304 LEANNE STREET
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
EDON VILLAGEOH8600512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 320 PARKWAY STREET
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: EDON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
NORTH PINE ESTATESOH8600812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659814EP001
Facility Name: NORTH PINE ESTATES LLC
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
NORTH PINE ESTATESOH8600812
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTION SYSTEMDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTION SYSTEMDS201 05571 STATE ROUTE 15 LOT #10
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
NORTH PINE ESTATESOH8600812
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: DISTRIBUTION SYSTEMLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
MONTPELIER VILLAGEOH8600912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8662191EP002
Facility Name: MONTPELIER VILLAGE 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 2Facility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
MONTPELIER VILLAGEOH8600912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MONTPELIER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20205TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20205 2/1/2020 andSample(s) Required between 3/31/20205 3/1/2020 andSample(s) Required between 4/30/20205 4/1/2020 andSample(s) Required between 5/31/20205 5/1/2020 andSample(s) Required between 6/30/20205 6/1/2020 andSample(s) Required between 7/31/20205 7/1/2020 andSample(s) Required between 8/31/20205 8/1/2020 andSample(s) Required between 9/30/20205 9/1/2020 andSample(s) Required between 10/31/20205 10/1/2020 andSample(s) Required between 11/30/20205 11/1/2020 andSample(s) Required between 12/31/20205 12/1/2020 and
Sample(s) Required between 1/31/20205TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20205 2/1/2020 andSample(s) Required between 3/31/20205 3/1/2020 andSample(s) Required between 4/30/20205 4/1/2020 andSample(s) Required between 5/31/20205 5/1/2020 andSample(s) Required between 6/30/20205 6/1/2020 andSample(s) Required between 7/31/20205 7/1/2020 andSample(s) Required between 8/31/20205 8/1/2020 andSample(s) Required between 9/30/20205 9/1/2020 andSample(s) Required between 10/31/20205 10/1/2020 andSample(s) Required between 11/30/20205 11/1/2020 andSample(s) Required between 12/31/20205 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MONTPELIER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 14469 COUNTY ROAD 15
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
MONTPELIER VILLAGEOH8600912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MONTPELIER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 580 STEUBEN ST
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MONTPELIER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
AQUA OHIO - NORLICKOH8601012
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659816EP001
Facility Name: AQUA OHIO - NORLICK
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
AQUA OHIO - NORLICKOH8601012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
02/14/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - NORLICK DISTRIBUTION Facility Class: CLASS 1DS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - NORLICK DISTRIBUTION Facility Class: CLASS 1DS201 121 SCOTT DRIVE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
AQUA OHIO - NORLICKOH8601012
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
02/14/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - NORLICK DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
NORTHLAND SENIOR COMMUNITYOH8601112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659817EP001
Facility Name: NORTHLAND SR COMMUNITY
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
NORTHLAND SENIOR COMMUNITYOH8601112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTHLAND SR COMM DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTHLAND SR COMM DISTRIBUTIONDS201 ADDRESS NOT KNOWN
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
NORTHLAND SENIOR COMMUNITYOH8601112
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTHLAND SR COMM DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
OAKWOOD MHPOH8601212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659818EP001
Facility Name: OAKWOOD MHP STU 1
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
OAKWOOD MHPOH8601212
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8660632EP002
Facility Name: OAKWOOD MHP STU 2
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP002
EP002
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
OAKWOOD MHPOH8601212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAKWOOD MHP DISTRIBUTIONDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAKWOOD MHP DISTRIBUTIONDS201 LOT 77
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
OAKWOOD MHPOH8601212
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OAKWOOD MHP DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
PIONEER VILLAGEOH8601312
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659819EP001
Facility Name: PIONEER, VILLAGE OF
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
PIONEER VILLAGEOH8601312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PIONEER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PIONEER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 504 NORTH STATE ST.
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
PIONEER VILLAGEOH8601312
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PIONEER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 600 SOUTH STATE ST.
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PIONEER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
AQUA OHIO - SENECAOH8601512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659820EP001
Facility Name: AQUA OHIO - SENECA
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
AQUA OHIO - SENECAOH8601512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - SENECA DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - SENECA DISTRIBUTION Facility Class: CLASS 1DS201 233 SENECA DRIVE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
AQUA OHIO - SENECAOH8601512
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - SENECA DISTRIBUTION Facility Class: CLASS 1DS202 708 SENECA DRIVE
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: AQUA OHIO - SENECA DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
STRYKER VILLAGEOH8601712
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659822EP001
Facility Name: STRYKER VILLAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
STRYKER VILLAGEOH8601712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: STRYKER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: STRYKER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 203 NORTH DEPOT STREET
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
STRYKER VILLAGEOH8601712
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: STRYKER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 206 NORTH DEFIANCE STREET
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: STRYKER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
WEST UNITY VILLAGEOH8601812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659823EP001
Facility Name: WEST UNITY WTP
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WEST UNITY VILLAGEOH8601812
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WEST UNITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000
Not RequiredASBESTOS - 1094
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WEST UNITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 104 LE ANN LANE
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
WEST UNITY VILLAGEOH8601812
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WEST UNITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 210 NORTH ST
Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WEST UNITY, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
WILLIAMS CO/HILLSIDE COUNTRY LIVINGOH8601912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
CommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659824EP001
Facility Name: WILLIAMS CO/HILLSIDE CTRY LIVING
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WILLIAMS CO/HILLSIDE COUNTRY LIVINGOH8601912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLIAMS CO/HILLSIDE CTRY LIVING DISTDS000
Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLIAMS CO/HILLSIDE CTRY LIVING DISTDS201 HERITAGE KITCHEN HANDWASH SINK
Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
WILLIAMS CO/HILLSIDE COUNTRY LIVINGOH8601912
2020 DISTRIBUTION SCHEDULE
CommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLIAMS CO/HILLSIDE CTRY LIVING DISTLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
PULASKI HEAD STARTOH8631912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659837EP001
Facility Name: PULASKI HEAD START
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
PULASKI HEAD STARTOH8631912
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PULASKI HEAD START DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: PULASKI HEAD START DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
SAMS PLACE TAVERN
2020 MONITORING SCHEDULE
OH8632312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SAMS PLACE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SAMS PLACE TAVERN
2020 MONITORING SCHEDULE
OH8632312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SAMS PLACEGround Water
8659841
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
D & L TOWN AND COUNTRY
2020 MONITORING SCHEDULE
OH8633512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: D & LTOWN CO DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
D & L TOWN AND COUNTRY
2020 MONITORING SCHEDULE
OH8633512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: D & L TOWN AND COUNTRYGround Water
8659850
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
ANDERSON VREELANDOH8633612
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659851EP001
Facility Name: ANDERSON VREELAND
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
ANDERSON VREELANDOH8633612
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ANDERSON VREELAND DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: ANDERSON VREELAND DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
PIONEER SCOUT RESERVE [BSA]-CAMP
2020 MONITORING SCHEDULE
OH8633912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PIONEER SCOUT RES-CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PIONEER SCOUT RESERVE [BSA]-CAMP
2020 MONITORING SCHEDULE
OH8633912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: PIONEER SCOUT RES - POOL PLANTGround Water
8659868
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PIONEER SCOUT RESERVE [BSA]-CAMP
2020 MONITORING SCHEDULE
OH8633912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PIONEER SCOUT RES - CAMPGround Water
8659854
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BRIDGEWATER COMMUNITY CHURCH
2020 MONITORING SCHEDULE
OH8634112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BRIDGEWATER COMMUNITY CH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BRIDGEWATER COMMUNITY CHURCH
2020 MONITORING SCHEDULE
OH8634112 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BRIDGEWATER COMMUNITY CHURCHGround Water
8659855
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP DICLAIR
2020 MONITORING SCHEDULE
OH8634512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: CAMP DICLAIR DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP DICLAIR
2020 MONITORING SCHEDULE
OH8634512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP DICLAIR DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
CAMP DICLAIR
2020 MONITORING SCHEDULE
OH8634512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP DICLAIRGround Water
8659856
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WILLIAMS COUNTY ENGINEER OFFICEOH8634812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659858EP001
Facility Name: WILLIAMS COUNTY GARAGE
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
WILLIAMS COUNTY ENGINEER OFFICEOH8634812
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLIAMS COUNTY GARAGE DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: WILLIAMS COUNTY GARAGE DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
LOVEBERRYS FUNNY FARM CAMPGROUND
2020 MONITORING SCHEDULE
OH8635512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: LOVEBERRYS FUNNY FARM CAMPGROUND DISTRIBGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LOVEBERRYS FUNNY FARM CAMPGROUND
2020 MONITORING SCHEDULE
OH8635512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LOVEBERRYS FUNNY FARM CAMPGROUND DISTRIBGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/27/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LOVEBERRYS FUNNY FARM CAMPGROUND
2020 MONITORING SCHEDULE
OH8635512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP002 Facility Source:
Facility Name: LOVEBERRYS FUNNY FARM CAMPGROUND STU 2Ground Water
8660634
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LOVEBERRYS FUNNY FARM CAMPGROUND
2020 MONITORING SCHEDULE
OH8635512 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LOVEBERRYS FUNNY FARM CAMPGROUND STU 1Ground Water
8659860
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAZY RIVER CAMPGROUND-PIONEER
2020 MONITORING SCHEDULE
OH8636212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: LAZY RIVER CAMP DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAZY RIVER CAMPGROUND-PIONEER
2020 MONITORING SCHEDULE
OH8636212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LAZY RIVER CAMP DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 5/8/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LAZY RIVER CAMPGROUND-PIONEER
2020 MONITORING SCHEDULE
OH8636212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 9/30
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LAZY RIVER CAMPGround Water
8659862
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LOCKPORT MENNONITE CHURCH
2020 MONITORING SCHEDULE
OH8636312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LOCKPORT MENNONITE CH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
LOCKPORT MENNONITE CHURCH
2020 MONITORING SCHEDULE
OH8636312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LOCKPORT MENNONITE CHURCHGround Water
8659863
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
MANUFACTURED HOUSING ENTERPRISEOH8636412
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659864EP001
Facility Name: MANUFACT HSING ENT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
MANUFACTURED HOUSING ENTERPRISEOH8636412
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MANUFACTURED HSING ENT DISTBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: MANUFACTURED HSING ENT DISTBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
NEW LIFE WORSHIP CENTER- BRYAN
2020 MONITORING SCHEDULE
OH8636812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NEW LIFE TEMPLE DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW LIFE WORSHIP CENTER- BRYAN
2020 MONITORING SCHEDULE
OH8636812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NEW LIFE WORSHIP CENTERGround Water
8659866
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PULASKI UNITED METHODIST CH-BRYAN
2020 MONITORING SCHEDULE
OH8637312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PULASKI UM CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PULASKI UNITED METHODIST CH-BRYAN
2020 MONITORING SCHEDULE
OH8637312 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PULASKI UNITED METHODIST CHURCHGround Water
8659870
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SHADY SHORE CAMPGROUND
2020 MONITORING SCHEDULE
OH8637712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: SHADY SHORE CAMPGROUND DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SHADY SHORE CAMPGROUND
2020 MONITORING SCHEDULE
OH8637712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SHADY SHORE CAMPGROUND DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/18/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SHADY SHORE CAMPGROUND
2020 MONITORING SCHEDULE
OH8637712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SHADY SHORE CAMPGROUNDGround Water
8659872
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SILVER CREEK CH OF THE BRETHREN
2020 MONITORING SCHEDULE
OH8637812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SILVER CREEK CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SILVER CREEK CH OF THE BRETHREN
2020 MONITORING SCHEDULE
OH8637812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SILVER CREEK CHURCHGround Water
8659873
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SUBURBAN GOLF CLUB
2020 MONITORING SCHEDULE
OH8637912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: SUBURBAN GOLF DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SUBURBAN GOLF CLUB
2020 MONITORING SCHEDULE
OH8637912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SUBURBAN GOLF DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 4/6/2020 and 4/30/2020
Sample(s) Required between1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
SUBURBAN GOLF CLUB
2020 MONITORING SCHEDULE
OH8637912 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to4/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SUBURBAN GOLFGround Water
8659874
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
M AND D SUBURBAN INN
2020 MONITORING SCHEDULE
OH8638012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: M&D SUBURBAN INN DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
M AND D SUBURBAN INN
2020 MONITORING SCHEDULE
OH8638012 Transient NoncommunitySystem Type:
Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: M & D SUBURBAN INNGround Water
8659875
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WEST BETHESDA PRESBYTERIAN CHURCH
2020 MONITORING SCHEDULE
OH8638512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WEST BETHESDA PRESBYTERI DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
WEST BETHESDA PRESBYTERIAN CHURCH
2020 MONITORING SCHEDULE
OH8638512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WEST BETHESDA CHURCHGround Water
8659877
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
RIVER OF LIFE WORSHIP CENTEROH8639512
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659883EP001
Facility Name: RIVER OF LIFE WORSHIP CENTER
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
RIVER OF LIFE WORSHIP CENTEROH8639512
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RIVER OF LIFE WORSHIP CNTR DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: RIVER OF LIFE WORSHIP CNTR DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
BRYAN FUEL STOP
2020 MONITORING SCHEDULE
OH8639812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
04/17/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BRYAN FUEL STOP DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
BRYAN FUEL STOP
2020 MONITORING SCHEDULE
OH8639812 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BRYAN FUEL STOPGround Water
8659886
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
OTC-KUNKLE MAINTENANCE BUILDINGOH8640112
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8659889EP001
Facility Name: OTC - KUNKLE MAINT BUILDING
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
OTC-KUNKLE MAINTENANCE BUILDINGOH8640112
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OTC-KUNKLE MAINT BLDG DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: OTC-KUNKLE MAINT BLDG DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Not RequiredLEAD - 1030 AND COPPER - 1022
PATRIOT HILLS GOLF COURSE
2020 MONITORING SCHEDULE
OH8640412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PATRIOT HILLS GOLF COURSE
2020 MONITORING SCHEDULE
OH8640412 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PATRIOT HILLS GOLF COURSEGround Water
8659892
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VICTORY BARN CHURCH
2020 MONITORING SCHEDULE
OH8640612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: VICTORY BARN CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
VICTORY BARN CHURCH
2020 MONITORING SCHEDULE
OH8640612 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: VICTORY BARN CHURCHGround Water
8659894
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN VALLEY CAMPGROUND-ARCHBOLD
2020 MONITORING SCHEDULE
OH8641212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: SUP01 Facility Source:
Facility Name: HIDDEN VALLEY DISTRIBUTIONGround Water
DS1
At least 1 negative Total ColiformBacteria sample prior to servingwater to the public
TOTAL COLIFORM - SEASONAL STARTUP
*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN VALLEY CAMPGROUND-ARCHBOLD
2020 MONITORING SCHEDULE
OH8641212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HIDDEN VALLEY DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020
Sample(s) Required between1 6/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 7/31/2020
Sample(s) Required between1 8/1/2020 and 8/31/2020
Sample(s) Required between1 9/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 10/24/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
HIDDEN VALLEY CAMPGROUND-ARCHBOLD
2020 MONITORING SCHEDULE
OH8641212 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to5/1 10/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HIDDEN VALLEY CAMPGROUNDGround Water
8661991
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW HOPE COMMUNITY CHURCH-BRYAN
2020 MONITORING SCHEDULE
OH8641512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NEW HOPE COMMUNITY CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
NEW HOPE COMMUNITY CHURCH-BRYAN
2020 MONITORING SCHEDULE
OH8641512 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NEW HOPE COMMUNITY CHURCHGround Water Facility Class: CLASS A
8660988
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PLEASANT RIDGE DUNKARD BRETH CH
2020 MONITORING SCHEDULE
OH8641712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PLEASANT RIDGE DUNKARD BRETH CH DISTRIBUGround Water
DS1
Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020
Sample(s) Required between1 4/1/2020 and 6/30/2020
Sample(s) Required between1 7/1/2020 and 9/30/2020
Sample(s) Required between1 10/1/2020 and 12/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
PLEASANT RIDGE DUNKARD BRETH CH
2020 MONITORING SCHEDULE
OH8641712 Transient NoncommunitySystem Type:
Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PLEASANT RIDGE DUNKARD BRETH CHURCHGround Water
8662026
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Well
DistributionSystem
Where to Collect Samples For a Small Public Water System
EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples
* If system does not have treatment, EP00# is the first tap after the well.
Save a dime. Sample on time!
Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.
PressureTank
Treatment*
Raw Tap
RS00#
orLT200#
GWR00#
DS000
DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples
SUP01 = Seasonal Startup Sample. Collected before serving water to the public.
EP00#
SUP01or
TRUFAST ORGANIZATIONOH8641812
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8662117EP001
Facility Name: TRUFAST CORPORATION
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS AFacility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)
TRUFAST ORGANIZATIONOH8641812
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: TRUFAST CORPORATION DISTRIBUTIONDS000
Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: TRUFAST CORPORATION DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.
NORTHWEST TWP WATER DISTRICTOH8641912
ENTRY POINT MONITORING SCHEDULE
2020 ENTRY POINT SCHEDULE
Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
8662162EP001
Facility Name: NORTHWEST WATER DISTRICT
Effective Date: 01/01/2020
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Facility Class: CLASS 1Facility Source: Ground Water
EP001
EP001
Not RequiredINORGANICS
Not RequiredNITRITE - 1041
Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020
NORTHWEST TWP WATER DISTRICTOH8641912
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTHWEST WATER DISTRICT DISTRIBUTIONFacility Class: CLASS 1DS000
Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTHWEST WATER DISTRICT DISTRIBUTIONFacility Class: CLASS 1DS201 3102 MIDTOLL BLVD.
Dual Sample Required between 3/14/2020at: DS201DISINFECTION BYPRODUCTS 3/8/2020 andDual Sample Required between 6/14/2020at: DS2016/8/2020 andDual Sample Required between 9/14/2020at: DS2019/8/2020 andDual Sample Required between 12/14/2020at: DS20112/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTHWEST WATER DISTRICT DISTRIBUTIONFacility Class: CLASS 1DS202 14553 ST. RT. 49
Dual Sample Required between 3/14/2020at: DS202DISINFECTION BYPRODUCTS 3/8/2020 andDual Sample Required between 6/14/2020at: DS2026/8/2020 andDual Sample Required between 9/14/2020at: DS2029/8/2020 andDual Sample Required between 12/14/2020at: DS20212/8/2020 and
Sample for all the analytes listed below:
1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950
NORTHWEST TWP WATER DISTRICTOH8641912
2020 DISTRIBUTION SCHEDULE
Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System
Operating Period: to1/1 12/31
01/01/2020Effective Date:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.
Also, monitoring schedules may be revised during the year based on sampling results.
For water emergencies that occur after hours, please call 800-282-9378
DISTRIBUTION MONITORING SCHEDULE
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1 Facility Name: NORTHWEST WATER DISTRICT DISTRIBUTIONFacility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs
Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and
Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.