The E166 Experiment K. Peter Schüler e+ source options for the ILC undulator source scheme for ILC E166 – proof-of-principle demonstration of the undulator.
The Challenges of Ultra-low Emittance Damping Rings David Rubin September 6,2011 IPAC2011 – San Sebastian, Spain.
Development of the FLNR Cyclotron Complex 04-5-1004-96/2009 Priority 1 Dubna, 21.02.08.
MICE & nuSTORM V. Blackmore University of Oxford [email protected] Neutrino Oscillation Workshop September 13 th, 2014 1/30V. Blackmore: MICE.
P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.
CEPC Machine Optimization and Final Focus Design Dou Wang, Jie Gao, Ming Xiao, Sha Bai, Yiwei Wang, Feng Su (IHEP) 16-18 October 2013, CERN. Geneva, Switzerland.
Modifications to DESY-II M. Minty Nov 11, 2003. The DESY-II 7GeV Lepton Synchotron DORIS f inj = 6.25 Hz E inj = 4.5 GeV N ppb = 5 · 10 9, typical DORIS.
Hollow Channel Plasma Wakefield Acceleration Spencer Gessner 5 th SAREC Review September 15 th, 2014.
K. Floettmann30 th Nov. 2009 XFEL Injector matching The present XFEL injector foresees operation of the first four cavities of the first module to operate.
Summary of R&D Status C. Joshi UCLA As Henry VIII said to Ann Boleyn “I won’t keep you for long..”
Possibility for the production and study of heavy neutron-rich nuclei formed in multi-nucleon transfer reactions proposal for a new project at FLNR V.
Coupling of APT Transported Ion beam to Hybrid Target D. R. Welch and D. V. Rose Mission Research Corporation C. L. Olson Sandia National Laboratories.