Development of the FLNR Cyclotron Complex
04-5-1004-96/2009 Priority 1
Dubna, 21.02.08
View from Above on Accelerator PlacementView from Above on Accelerator Placement
FLEROVLAB ACCELERATORS
Program of modernization of the FLNR cyclotron complex
• 1. U400M – low energy beams.
• 2. U400 – U400R.
• 3. MT25
U400M Beam parameters (DC-U400M Beam parameters (DC-550)550)
U400M Beam parameters (DC-U400M Beam parameters (DC-550)550)
IonIon E, MeV/nE, MeV/n I, ECRI, ECR I, extracted I, extracted I, I, extractedextracted
77LiLi2+2+ 3535 100100AA 3030AA 6*106*101313 pps pps
1111BB3+3+ 3232 9090AA 3030AA 4*104*101313 pps pps1212CC4+4+ 4747 100100AA 3355AA 4*104*101313 pps pps
1414NN4+4+ 3535 100100AA 3355AA 3*103*101313 pps pps
1414NN5+5+ 5454 5050AA 1515AA 1.5*101.5*101313 pps pps
1818OO5+5+ 3333 100100AA 3030AA 2.5*102.5*101313 pps pps
2222NeNe6+6+ 3232 5050AA 1515AA 1*101*101313 pps pps2222NeNe7+7+ 4343 5050AA 1515AA 1*101*101313 pps pps3636SS10+10+ 3333 1010AA 1.71.7AA 6*106*101111 pps pps
4040ArAr12+12+ 4040 1212AA 22AA 7*107*101111 pps pps
4848CaCa10+10+ 2020 1010AA 1.71.7AA 5*105*101111 pps pps
1,30 1,35 1,40 1,45 1,50 1,55 1,60 1,65 1,70 1,75 1,80 1,85 1,90 1,95
3
4
5
6
7
8
910
20
30
40
50
60
70
80
90100 4He2+
6Li2+ , 12C4+ , 15N5+
20Ne5+ , 40Ar10+
12C2+
84Kr9+
0.006 T
9
8
MC400 Cyclotron
2.3 MHz
3.833 MHz
5.75 MHz
12.0 MHz
4.8 MHz
8.0 MHz
7
6
5
10
4
3
2
Mass to ChargeRatio
Extraction Radius 1.8 m, Generator Frequency 11.5 - 24.0 MHz
Ions
Ene
rgy
[MeV
/nuc
l]
Cyclotron Center Magnetic Field [T]
3
4
5
6
7
8
9
10
0.18 T0.16 T
2.875 MHz
6.0 MHz
4
2
5
3
0.01 T
0.008 T
0.015 T
0.009 T
0.02 T
0.03 T
0.04 T
0.007 T
0.05 T
0.06 T
0.08 T
0.10 T
0.12 T0.14 T
Harmonic Mode 2nd harmonic 3rd harmonic 4th harmonic 5th harmonic
Ions
Fre
quen
cy [
MH
z]
Working diagram
-3,0 -2,5 -2,0 -1,5 -1,0 -0,5 0,0 0,5 1,0 1,5-3,5
-3,0
-2,5
-2,0
-1,5
-1,0
-0,5
0,0
0,5
1,0
1,5
2,0
Z2/Z
1=2.0-4.0
=43.2o
R=300 cm
X [ m ]
= 90o
= 0o
U - 400M : Extraction by stripping ( A/Z = 9.5 )
Y [
m ]
U400M low energy beam extraction
U400M low energy program
Central part of cyclotron
U400M
Ion sources and axial injection
U400M Systems ModernizationFebruary-September 2007
• new axial injection line;• deep modernization of “warm” ECR ion source
(DECRIS-2);• new U400M central region ion optics for “low”
(4÷15) MeV/n beam acceleration;• new target–catcher system for 6He production with
local radiation shielding;• second system for “low” energy beam extraction;• new RF control system;• partial modernization of water cooling system;• new main magnet coil power supply source;• second superconducting 18-GHz ECR ion source
DECRIS-SC2 (under testing).
October-December 2007October-December 2007U400M Modernization ResultsU400M Modernization Results
• Ion beams with energy 5,5 MeV/n and Ion beams with energy 5,5 MeV/n and intensity 0,2 ρμa, acceleration and intensity 0,2 ρμa, acceleration and extraction to the second direction.extraction to the second direction.
• Increasing the light ion beams intensity Increasing the light ion beams intensity for production of secondary beams (limit for production of secondary beams (limit will be tested).will be tested).
410
4320
3000
4000
3000
1000
155
1500
6987
U400M hall, MASHA and new GFS lay out
U400MPlan of modernization
2007 2008 № Jobs 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
1. Program of low energy beams acceleration and extraction (3÷ 9 Mev/n)
2. Creation and testing of low energy beam channels
3. Installation of MASHA and GFS separators in U400M halls
4. Complex testing
Ion E, MeV/n I, ECR I, extracted I, extracted
7Li1+ 16.6 100A 30A 6*1013 pps6Li1+ 12.6 100A 30A 6*1013 pps11B2+ 17.8 90A 33A 4*1013 pps12C2+ 16.6 100A 35A 4*1013 pps13C2+ 14.4 100A 35A 3*1013 pps14N2+ 9.4 100A 35A 3*1013 pps14N3+ 20.3 100A 35A 3*1013 pps18O3+ 19.3 100A 35A 2.5*1013 pps
20Ne4+ 20.9 100A 35A 2*1013 pps22Ne4+ 17.8 100A 35A 2*1013 pps
36S6+ 15 60A 25A 9*1012 pps40Ar8+ 19.9 100A 35A 1*1013 pps48Ca5+ 5.3 60A 22A 7*1012 pps48Ca9+ 19 30A 10A 3*1012 pps86Kr9+ 5.1 60A 10A 2*1012 pps
136Xe14+ 4.4 5A 0.2A 3*1010 pps
U400 Beam parameters (DC-625)U400 Beam parameters (DC-625)
5. Cyclotron average magnetic field level 5. Cyclotron average magnetic field level from 0,8 up to 1,8 T.from 0,8 up to 1,8 T.
U400 U400R U400 U400R
2. Ion energy variation on the target with factor 5.2. Ion energy variation on the target with factor 5.
1.1. Beam intensity of masses A ≈ 50 and Beam intensity of masses A ≈ 50 and energy ≈ 6 MeV/n energy ≈ 6 MeV/n up to 4 ρμaup to 4 ρμa..
3. Energy spread on the target up to 103. Energy spread on the target up to 10-3-3..
4. Beam emittance on the target – 10 π mm · mrad.4. Beam emittance on the target – 10 π mm · mrad.
6. New equipment.6. New equipment.
U400 U400 U400R U400R U400 U400 U400R U400R
Working diagram
Axial Injection SystemAxial Injection System
SL - Solenoidal LensSL - Solenoidal Lens
AM90 – Bending Magnet AM90 – Bending Magnet
S1-S4 – Focusing SolenoidsS1-S4 – Focusing Solenoids
U400 U400 U400R U400R U400 U400 U400R U400R
U400 U400 U400R U400R U400 U400 U400R U400R
Magnetic Field Map (I=1200A)Magnetic Field Map (I=1200A)
1.58
1.585
1.59
1.595
1.6
1.605
1.61
1.615
1.62
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8
R [m]
B [
T ]
B(R) - WP
U400 U400 U400R U400R U400 U400 U400R U400R
Radial Magnetic Field Distribution for Radial Magnetic Field Distribution for 4848CaCa6+6+. Ion Energy 6.2MeV/n. Ion Energy 6.2MeV/n
U400 U400 U400R U400R U400 U400 U400R U400R
RF SystemRF System
U400 U400 U400R U400R U400 U400 U400R U400R
Vacuum System SchemeVacuum System Scheme
4.
3.
2.
1.
4321432143214321
2010200920082007Jobs№
Drawing
Creation and equipment completion
Assembling
Equipment and beam testing
Plan of modernization U400 → U400R
Microtron
• RF generator
• Vacuum system
• Control system
• Beam line equipment
• Power supply
2008 – partial modernization of old subsystems:
AcceleratorRunning time in hours
2008
(required)
U400
U400M
Total
2003 2004 2005 2006 2007
6500 6500 5500 56005500
3300 2500 3500 17003500
9800 9000 9000 73009000
6000
2500
8500
Running time of the FLNR U400 and U400M cyclotrons in 2003-2007