P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO...

28
1 P. A. Posocco – P. A. Posocco – TH10 TH10 STATUS OF LINAC BEAM STATUS OF LINAC BEAM COMMISSIONING COMMISSIONING FOR THE ITALIAN HADRON FOR THE ITALIAN HADRON THERAPY CENTER CNAO THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On behalf of the CNAO-GSI- INFN collaboration

Transcript of P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO...

Page 1: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

1P. A. Posocco – TH10P. A. Posocco – TH10

STATUS OF LINAC BEAM STATUS OF LINAC BEAM COMMISSIONING COMMISSIONING

FOR THE ITALIAN HADRON THERAPY FOR THE ITALIAN HADRON THERAPY CENTER CNAOCENTER CNAO

P. A. PosoccoINFN-Laboratori Nazionali di Legnaro

On behalf of the CNAO-GSI-INFNcollaboration

Page 2: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

2P. A. Posocco – TH10P. A. Posocco – TH10

Welcome to CNAOWelcome to CNAO(Centro Nazionale Adroterapia Oncologica)(Centro Nazionale Adroterapia Oncologica)

The CNAO has been conceived to perform treatment of deep seated tumours with light ion beams (proton, Carbon ions and others) and to clinical and radiobiological

Page 3: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

3P. A. Posocco – TH10P. A. Posocco – TH10

CNAO from outsideCNAO from outside

TechnicalbuildingMain building:

2° floor: auditorium & library

1° floor: offices and laboratories

Ground floor: Reception and med. preparation

Basement: 3 treatment rooms

Accelerator vault

Page 4: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

4P. A. Posocco – TH10P. A. Posocco – TH10

The CNAO facilityThe CNAO facility

- 2 w. horizontal beam - 1 w. hor. + vert. beam - scanning mag. (20x20 cm)- ~3000 patients/year - 80% C, 20% protons

- Compact design- 25 m diameter ring - Multi turn injection- Final energy:

Carbon: 2400 MeVProtons: 250 MeV

The accelerator The 3 treatment rooms

Page 5: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

5P. A. Posocco – TH10P. A. Posocco – TH10 5

CNAO Injector:CNAO Injector:Sources Specifications

Extraction Voltage 24 kV

Current H3+ > 700 μA

Current C4+ > 150 μA

Transv. norm emitt. (95%) 0.5 mm mrad

LINAC Specifications

Operating frequency 216.816 MHz

Final beam energy 7 MeV/u

Beam pulse length ≤ 300 μs

Beam rep. rate ≤ 5 Hz

Transv. norm emitt. (95%) 0.8 mm mrad

Exit energy spread ± 0.3%

Total injector length ~ 19 m

SourcesC4+ and H3

+

7 MeV/u

400 keV/u

8 keV/u

IH - DTL

RFQ

Stripping foil

SolenoidSpectrometerSwitching magnet

Chopper

Ion source supervised by INFN LNSLow energy beam transport by CNAO Linac by GSI (second version of HICAT) supervised by INFN LNL

Page 6: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

6P. A. Posocco – TH10P. A. Posocco – TH10

The InjectorThe Injectoras it was in January 2009as it was in January 2009

Source ISource II

RFQ

75° dipole

Spectrometer

Switchingmagnet Chopper

Solenoid

Page 7: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

7P. A. Posocco – TH10P. A. Posocco – TH10 7

Injector commissioning milestonesInjector commissioning milestonesfrom to Section Description

May 08 July 08 Source Beam and LEBT Inst.

September 08 December 08LEBTTB0

Beam

January 09 February 09

RFQTB2

Install.

25th Feb. 09 12th Mar. 09 RF Cond.

13th Mar. 09 3rd April 09 Beam

April 09 May 09IH DTL

TB3

Install.

June 09 now RF Cond.

IH DTL

RFQLEBT

Sources

Page 8: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

8P. A. Posocco – TH10P. A. Posocco – TH10

Ion Sources PerformancesIon Sources PerformancesImprovements (in 2007)

• the gas injection system has been modified in order to improve the stability

• extraction gap distance modified to improve beam emittance and stability

• a lead shield 10 mm thick all around the source instead of a 5 mm one for improving radiation safety

• the noise of electronics has been reduced

Performances• 250 μA for C4+ (25% > nominal) • 1100 μA for H3

+ (50% > nominal)

plasma electrode hole diameter reduced to 6 mm allowing to have better emittance

New extraction column

Page 9: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

9P. A. Posocco – TH10P. A. Posocco – TH10 9

LEBT CommissioningLEBT Commissioning

TB0

Horizontal Vertical

C4+

Emitt

. RM

S: ~

35 m

m m

rad

Page 10: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

10P. A. Posocco – TH10P. A. Posocco – TH10

Commissioning of LEBTCommissioning of LEBTTB0 (GSI & CNAO)TB0 (GSI & CNAO)

CNAOFaraday cup

Farady Cup

ACT (in front of solenoid)

Slit-scannerEmittance chamber (length = 390 mm!)

GSI End Cup

Page 11: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

11P. A. Posocco – TH10P. A. Posocco – TH10 11

Emittance in TB0Emittance in TB0

TB0:• AC/DC current• AC/DC profiles• DC emittance exactly at the RFQ matching point!!!

- 4 +4 - 4 +4Horiz. Vert.- 4 +4 - 4 +4

Horiz. Vert.- 4 +4 - 4 +4

- 4 +4Horiz.

- 4 +4Vert.

- 4 +4Horiz.

- 4 +4Vert.

H3+

C4+

> 90% inside 180 mm mrad (yellow ellipse)

Page 12: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

12P. A. Posocco – TH10P. A. Posocco – TH10

Sol-002

Sol-002

The 3 solenoids build by SigmaPhi: magnetic field along the axis measurements at INFN Frascati

12

Matching solenoidMatching solenoid

Example of beam steering at TB0 grid as function of the solenoid strength

Results:• Very accurate centroid displacement correction (~1 mm over 3 cm wide beam!!!)• Linear response

mrad

mm

mrad

mm

X i

30.0

10.0

76.2

34.1

Nominal value S. Vitulli & G. Bazzano

(CNAO)

Page 13: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

13P. A. Posocco – TH10P. A. Posocco – TH10 13

LEBT Commissioning summaryLEBT Commissioning summaryTB0TB0

• Comparison current measurements (GSI/CNAO & DC/AC)– Consistency

• Comparison of profiles (grid/scanner)– Consistency

• Beam position as function of solenoid field – Steering at RFQ entrance

• Profiles for long and short macro pulses at – Neutralisation, Space

• Different times within pulse (H3+/C4+)

– Charge, verification of DC emittances

• Transmission, Twiss-Parameter and emittances – Matching RFQ– Definition of LEBT operating parameters– Pre-condition for RFQ commissioning

Mandatory for RFQ good performances!!!

Page 14: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

14P. A. Posocco – TH10P. A. Posocco – TH10

Commissioning of RFQCommissioning of RFQTB2 (GSI)TB2 (GSI)

Faraday Cup Profile grid (from right)

End Cup

MobEmi Slits and profile grid

Phase probes

ACT

Beam

Page 15: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

15P. A. Posocco – TH10P. A. Posocco – TH10

Intertank section with MEBT partly integrated in the RFQ:Intertank section with MEBT partly integrated in the RFQ:compact but reduced flexibilitycompact but reduced flexibility

IH-DTL

RFQ

Quadrupole magnetsSteerer

magnets

Phase probe

205 mm

Buncher gaps

Beam

Page 16: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

16P. A. Posocco – TH10P. A. Posocco – TH10 16

Commissioning RFQ Commissioning RFQ –– Results H Results H33+ + at 8 keV/u at 8 keV/u

transmission, steering and energytransmission, steering and energy

Transmission ~57 % at working point 5.1 Volt (195 kW)Moderate steering in both planes with smooth behaviour

Steerer LN-002-ITM offQD1= -11.8 m-1 / QD2= 8.6 m-1

Step 1:Optimisation

Step 2:Perform standardmeasurements

Page 17: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

17P. A. Posocco – TH10P. A. Posocco – TH10 17

Commissioning RFQ Commissioning RFQ –– Results H Results H33+ + at 8 keV/uat 8 keV/u

Emittances in TB2Emittances in TB2

4 rms [mm mrad] 4 rms [mm mrad]

Page 18: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

18P. A. Posocco – TH10P. A. Posocco – TH10 18

Commissioning RFQ – Results CCommissioning RFQ – Results C4+4+

Transmission, energy und steeringTransmission, energy und steeringVariation of Solenoid

40

45

50

55

60

65

9.4 9.6 9.8 10.0 10.2 10.4

L2-019B-SL1 [1/m]

Tra

nsm

iss

ion

[%]

Transmission RFQ

30

35

40

45

50

55

60

65

4.4 4.5 4.6 4.7 4.8 4.9 5.0 5.1 5.2 5.3

Tank Voltage [V]

Tra

ns

mis

sio

n [

%]

Steering RFQ

-3

-2

-1

0

1

2

3

4.4 4.5 4.6 4.7 4.8 4.9 5.0 5.1 5.2 5.3

Tank Voltage [V]

Ste

eri

ng

[m

m]

x / mm

y / mm

RFQ Beam Energy

390

395

400

405

410

415

420

4.4 4.5 4.6 4.7 4.8 4.9 5.0 5.1 5.2 5.3 5.4

Tank Voltage [V]

Be

am

En

erg

y [

ke

V/u

]

Step 1:Optimization

Step 2:Performstandardmeasurements

Transmission ~62 % at working point 5.1 Volt (195 kW)Moderate steering in both planes with smooth behaviour

Page 19: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

19P. A. Posocco – TH10P. A. Posocco – TH10 19

Commissioning RFQ – Results CCommissioning RFQ – Results C4+4+

Emittances in TB2Emittances in TB2

4 rms [mm mrad] 4 rms [mm mrad]

Page 20: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

20P. A. Posocco – TH10P. A. Posocco – TH10 20

Probe beam (HProbe beam (H33++))

Slits combined to reduce up to 10% of the full emittance!!!

Horizontal Vertical

profile in L2(~10 mm width)

H3+

Emit. RMS:~5 π mm mrad

M. Pullia (CNAO)

Page 21: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

21P. A. Posocco – TH10P. A. Posocco – TH10 21

Transmission ~70 % at working point 5.1 Volt (195 kW)

Moderate steering in both planes with smooth behaviour

Steerer LN-002-ITM ausQD1= -11.8 / QD2= 8.6

RFQ Beam Energy (new drift lenght)

390

395

400

405

410

415

420

425

4,4 4,5 4,6 4,7 4,8 4,9 5,0 5,1 5,2 5,3 5,4

Tank Voltage [V]

Beam

Energ

y [keV

/u]

Transmission RFQ

40

45

50

55

60

65

70

75

80

4,40 4,60 4,80 5,00 5,20

Tank Voltage [V]

Tra

nsm

issi

on [%

]

Steering RFQ

-3

-2

-1

0

1

2

3

4,4 4,5 4,6 4,7 4,8 4,9 5,0 5,1 5,2 5,3

Tank Voltage [V]

Ste

erin

g [m

m]

x / mm

y / mm

RFQ: Results HRFQ: Results H33+ + “probe beam”“probe beam” at 8 keV/uat 8 keV/u

Steering, energy and transmissionSteering, energy and transmission

Page 22: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

22P. A. Posocco – TH10P. A. Posocco – TH10 22

RFQ commissioning resultsRFQ commissioning resultsIon H3

+ C4+

Energy (keV/u) 7.5 8.0 8.5 8.0

Workingpoint (V) 5.15 5.10 5.15 5.10

Max. transm.full beam 4.6% 58% 59% 62%

Max. transm.probe beam 3.4% 71% 69% -

x rms emit.(4 rms [mm mrad]) - 18.7 21.6 17.9

y rms emit.(4 rms [mm mrad]) - 14.2 13.7 12.3

Page 23: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

23P. A. Posocco – TH10P. A. Posocco – TH10 23

Effect of the bend electrodes on RFQ acc.Effect of the bend electrodes on RFQ acc.

(total)

Full beam

cm

HITCNAO

By S. Yaramyshev

150 17512530

Probe beam

Measured at CNAO~15%

Page 24: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

24P. A. Posocco – TH10P. A. Posocco – TH10 24

xc= -1.4 mm

x’c= 3 mrad

yc= -0.1 mm

y’c= -10 mrad

± 15 mrad!!

By S. Yaramyshev

Probe beam displaced in position and angle with L2 steerers

Exp. RFQ acceptance at 8 keV/uExp. RFQ acceptance at 8 keV/u

M. Pullia (CNAO) et al.

Page 25: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

25P. A. Posocco – TH10P. A. Posocco – TH10 25

Commissioning RFQCommissioning RFQSummary resultsSummary results

• Working point: – Energy of 400 keV/u reached at 195 kW power

• Steering RFQ and quadrupole doublet: – Size acceptable and smooth behavior – during operation only small correction with steerers – very small beam losses in inter-tank section!

• Currents: – ~500 µA (H3

+) – ~75 µA (C4+) – transmissions up to 60 %

• Transverse emittances:– H3

+ : Hor - Ver(90%) = 19 / 14 π mm mrad– C4+: Hor - Ver(90%) = 18 / 12 π mm mrad– within acceptance of IH-DTL (~50 mm mrad)

• RFQ operating parameters: – Established for H3

+ and C4+ beams

Page 26: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

26P. A. Posocco – TH10P. A. Posocco – TH10 26

Commissioning RFQCommissioning RFQSummary of further measurementsSummary of further measurements

• Variation of LEBT energy: Measurements with 7.5, 8.0 and 8.5 keV/u– At 7.5 keV/u no useful results– At 8.5 keV/u results are similar to 8.0 keV/u case but at higher RFQ power level

• Stability of energy over 1.5 h: – variation in 2 keV/u region

• Measurement (Hor. and Vert.) of RFQ acceptance at 8.0 and 8.5 keV/u:– both measurements consistent

• Optimization of LEBT settings with respect to centers of measured acceptance– higher transmission– reduced steering and emittance after RFQ

• WHY ONLY 70% TRASMISSION AT MAX, with pencil beam ?– Probably longitudinal losses, the RFQ is not able to capture and accelerate more than

70% of particles even for on axis particles!

Page 27: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

27P. A. Posocco – TH10P. A. Posocco – TH10 27

Now: IH – DTL!Now: IH – DTL!TB3 (GSI)TB3 (GSI)

Page 28: P. A. Posocco – TH10 STATUS OF LINAC BEAM COMMISSIONING FOR THE ITALIAN HADRON THERAPY CENTER CNAO P. A. Posocco INFN-Laboratori Nazionali di Legnaro On.

28P. A. Posocco – TH10P. A. Posocco – TH10

Thanks to all the authorsThanks to all the authors

• A. Pisent, P. A. Posocco, C. Roncolato, INFN/LNL, Legnaro (PD), Italy

• C. Biscari, INFN/LNF, Frascati (RM), Italy• G. Ciavola, S. Gammino, INFN/LNS, Catania, Italy• G. Clemente, K. M. Kleffner, M. Maier, A. Reiter,

B. Schlitt, H. Vormann, GSI, Germany • G. Balbinot, E. Bressi, M. Caldara, A. Parravicini,

M. Pullia, C. Sanelli, E. Vacchieri, S. Vitulli, CNAO Foundation, Pavia, Italy