Line 3 (South-North)
Surco – Carabayllo
5 LinesTotal Length : 133 km
Total Investment: US$12,000 MM
(including currently operational
LIne 1)
5 LinesTotal Length : 133 km
Total Investment: US$12,000 MM
(including currently operational
LIne 1)
Line 5 (South-North)
Chorrillos - Miraflores
Line 4 (East-West)
Ate Vitarte - Callao
Line 2 (East-West)
Ate Vitarte - Callao
Line 1 (South-North)
Villa El Salvador - San Juan de Lurigancho
BASIC NETWORK OF THE LIMA METRO
LINE 2 AND FAUCETT – GAMBETTA SECTION
OF THE BASIC NETWORK OF THE LIMA METRO
Line 2 has a capacity to
transport more than 1 million
passengers per day
Location
Lima and
Callao
Location
Lima and
Callao
Design
Build,
Operate
and
Transfer
Design
Build,
Operate
and
TransferInvestment
US$5
billion (estimated)
Investment
US$5
billion (estimated)
Modality: Co-financed
Length: about 35 Km
Route: 13 districts
� Current project status: Profile approved by MTC (Ministry of Transport and Communication)
� Estimated Project Award date: Fourth quarter 2013
D.B.O.T.
MAIN SPECIFICATIONS
35Stations
35Stations
2Deposit
Yards
2Deposit
Yards
12Districts
12Districts
2Third Ways
2Third Ways
2Connections
COSAC and
L1
2Connections
COSAC and
L1
35 KmLength
35 KmLength
Wholly
Underground
Wholly
Underground
MAIN SPECIFICATIONS
Railway System High
StandardsTechnology
High
StandardsTechnology
Automatic
PilotTechnology
Automatic
PilotTechnology
ModernityTechnology
ModernityTechnology
Platform
DoorsTechnology
Platform
DoorsTechnology
MAIN SPECIFICATIONS
Number of trains(6 cars per train)
LINE 2FAUCETT AVE. – GAMBETTA AVE.
SECTION
Capacity per train
Demand (at start of operation)
Frequency
COSAC
Line 1
Demand (in 2030)
8
MAIN SPECIFICATIONS
1,200 passengers per train
More than 600 thousand passengers/day
3 min. in rush hour and 4.5 min in off-peak time
Interconnection
More than 900 thousand passengers/day
Interconnection
35
Simple
TunnelSection
Simple
TunnelSection
Two-WaySection
Two-WaySection
TBMBuilding method
TBMBuilding method
SegmentsLining
SegmentsLining
Tunnel
SafetyTechnology
SafetyTechnology
Pressure
ControlTechnology
Pressure
ControlTechnology
MAIN SPECIFICATIONS
StationsCut &
CoverType
Cut &
CoverType
CaveType
CaveType
� Street level
� Court
� Mezzanine
� Platform
� Vertical connections
� Technical areas
� Service/office areas
Station
elements:
Station
elements:
MAIN SPECIFICATIONS
Other Elements
YardsManeuvering
YardsManeuvering
ShaftsVentilation
ShaftsVentilation
Workshopsand deposit
Workshopsand deposit
ExitsEmergency
ExitsEmergency
MAIN SPECIFICATIONS
Electromechanical
construction and equipmentUS$ 2.936 billion
Rolling Stock and
ExpropiationUS$ 1.089 billion
Expenses and Contingencies US$ 529 million
General Sales Tax (IGV) US$ 820 million
TOTAL US$ 5.373 billion
PRELIMINARY EXECUTION BUDGET
Budget acc. to profile
PPP
DFBOTDFBOT
� Build
� Operate
� Transfer
� Build
� Operate
� Transfer
Period
35years
35years
5 yearsClosure and
Construction of Stage 1
5 yearsClosure and
Construction of Stage 1
30 yearsOperation and
maintenance
30 yearsOperation and
maintenance
Payments to the Concessionaire
Payments to the Concessionaire
For
Investment
For
Investment
For
Operation and
Maintenance
For
Operation and
Maintenance
Investment Financing
Investment Financing
Co-financingfor the Investment
Co-financingfor the Investment
CONCESSION SCHEME
Start
Construction
Start
Operation
End
Operation
Line 2Line 2
600KPassengers
per day
600KPassengers
per day
918KPassengers
per day
918KPassengers
per day
35 yearsConcession Period
Operation Stage
Construction Stage
Line 2 and Faucett
Ave. – Gambetta
Ave. section
Line 2 and Faucett
Ave. – Gambetta
Ave. section
Build and Operation Stages
Build and Operation Stages
CONCESSION PERIOD
CONCESSIONAIRE
Provider of rolling stockConstructor (C) Operator (O)
� Must be a part of the Bidder
� General experience:� Civil works in metro-type, underground
railway transportation systems� Experience period: Last 10 years� Tunnel construction with TBM� Construction of underground stations
� Specific experience� 1 Project of 15 Km, 15 stations and
investments for US$ 800 million or� 4 Projects jointly comprising 20 Km, 20
stations and investments of US$ 1 billion.
� Stay: No less than 7 years
� Assets: US$ 500 million
� May be a part of the Bidder (excluding)
� May be related to more than one Bidder, only as Provider (Contract of Provision of MR)
� General experience:
� Provision for one or more metro-type underground railway transportation systems
� Experience period: Last 03 years
� Specific experience:
� Annual production of 240 urban train cars (Metro) in average.
� Production of 20 trains with ATP per year, � Trains should be equipped with GoA 4 or GoA
3
� Stay: No less than 7 years
� Assets: US$ 400 million
� Must be a part of the Bidder.
� Specific experience:� Experience period: no less than10 years� Operation of at least one metro-type underground
railway transportation system or Urban Railway System, with more than 150 million passengers per year.
� The number of passenger cannot include passengers from more than one system.
� Assets: US$ 200 million
� Stay: During the entire concession period
� Technical Assistance Contract should be submitted if the Operator does not meet the requirements.
� Operating Technical Advisor demonstrates compliance with requirements.
� Technical Advisor’s stay: No less than 10 years
� In such case, the operator:� Experience period: no less than 3 years� Assets: US$ 50 million
OperatorOperating Technical Advisor
� The constructor must also demonstrate:� 10 years of experience in supply and
installation of ElectromechanicalEquipment in no less than 2 Lines, with alength of no less than 15 Km and usingAutomatic Train Protection (ATP)technology.
SHORT-LISTING REQUIREMENTS
Activity Proposed Date
Aproval of Pre-Investment Studies Second quarter 2013
Official Announcement
Publication of official announcement and bidding terms First quarter 2013
Short-Listing
Submission of Envelope No. 1 Up to third quarter 2013
Short-listing Results Third quarter 2013
Contract
Delivery of First Contract Draft First quarter 2013
Delivery of the final version of the Contract Third quarter 2013
Submission of Proposals
Submission of Envelopes No. 2 and No. 3, Opening of Envelope
No. 3 and Project AwardFourth quarter 2013
SCHEDULE
www.proinversion.gob.pe