Download - Installation Instructions for SEL-TPR

Transcript

Installation Instructions for SEL-TPR3-Phase, Remote Large Target, 600 A Junction Shield

25-0217.A

Page 1 of 2

SCHWEITZER ENGINEERING LABORATORIES, INC.2350 NE Hopkins Court • Pullman, WA 99163-5603 U.S.A.Phone: +1.509.332.1890 • Fax: +1.509.332.7990selinc.com • [email protected]

Install the Display

Install the Internal Adapter Ring (if Required) and the Phase Sensor(s)➤ Elastimold 15, 25, and 35 kV PCE elbows with molded test points require the internal adapter rings. Complete Steps A–H.

➤ Hubbell, Chardon, RTE, Cooper, or GE-Chardon elbows with molded test points do not require the adapter ring. Complete Steps E–H only.

=

➤ Mount the stainless-steel bracket to position the “L” display for optimum viewing.

➤ Use the integral threaded stud and hex nut to mount the display to the bracket. Hand tighten the hex nut. Do not overtighten.

Note: Optional Display Panel Mount Kits are sold separately. Consult the factory for ordering information.

Internal adapter ring Fold into a “U” shape Align the ridge with the groove Release the “U” shape and press the ridge into the groove

Ø2.0 (Ø50)

7.7(195)

3.2(83)

3.7(95)

∅2.5(∅64)

1.7 (43)

APPROX< 2.5(65)

Before installation of fault indicators and sensors, read and understand all instructions in their entirety. For assis-tance, contact Customer Service at (509) 332-1890 or by email at [email protected].

CAUTIONInstall fault indicators and sensors in accordance with normal safe operating practices. These instructions are not intended to replace or supersede exist-ing safety or operating requirements. Only trained qualified personnel should install or operate fault indicators and sensors.

Hex Nut

“L” Display

Stainless-Steel Bracket

Ridge

A B

Ridge

RidgeGroove

C D

25-0217.A

Page 2 of 2

SCHWEITZER ENGINEERING LABORATORIES, INC.2350 NE Hopkins Court • Pullman, WA 99163-5603 U.S.A.Phone: +1.509.332.1890 • Fax: +1.509.332.7990selinc.com • [email protected]

Installation Instructions for SEL-TPR 3-Phase, Remote Large Target, 600 A Junction Shield

Remove the test point cap. Clean and dry the test point. Apply a sili-cone dielectric grease to the inside

of the sensor boot.

Position one junction arm around the elbow. Use a sliding

motion to move the junction arm behind the cable.

When both junction arms are around the cable, slide the phase sensor up to the test point of the

T-Body.

Use a push/twist motion to seat the phase sensor on the test

point.

Magnetic Cable Guides hold cables and leads neatly within the enclosure.

Catalog Number: MCG

Test Point Cap

E F G

Test Point

H