ZORAN RUBINJONI - BELGRADE URBAN TRANSPORT
Transcript of ZORAN RUBINJONI - BELGRADE URBAN TRANSPORT
BELGRADE URBAN BELGRADE URBAN TRANSPORTTRANSPORT
CITY OF BELGRADE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
TRANSPORTTRANSPORT
Conference on Transportation Infrastractures Conference on Transportation Infrastractures
in the Balkansin the Balkans
July 2011, MadridJuly 2011, Madrid
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE
• Belgrade is capital of Serbia.
• Population ~ 1.6 million inhabitants.
• Enjoys the status of NUTS 2 region.
• Territory is devided into 17 municipalities.
• Covering area of 322.286 ha.
• Two rivers, the Danube and Sava, flow throught Belgrade.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
URBAN ZONESURBAN ZONES CITY CORE CITY CORE -- CCCC
CENTRAL ZONE CENTRAL ZONE -- CZCZ
Area: 2608.73 ha
Area: 619.27 ha
11% of the total MP area population is
inhabited in the CC area
37% of the total MP area employees work in
the CC area
BELGRADE
CONTINUALLY BUILT AREACONTINUALLY BUILT AREA-- CBACBA
Area: 2608.73 ha
27% of the total MP area population is
inhabited in the CZ area
57% of the total MP area employees work in
the CZ area
Area: 13593.5 ha
78% of the total MP area population is
inhabited in the CBA area
91% of the total MP area employees work in
the CBA area
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
• Number of inhabitants ~1.600.000
• Mobility 2.5 - 2.7 trips per capita
• Total number of trips per day ~ 3.500.000
ABOUT ABOUT THE THE TRANSPORTATION TRANSPORTATION SYSTEMSYSTEM
BELGRADE
• Participation of peak hours’ traffic 8 - 9%
• Number of trips during peak hours ~300.000
• Motorization rate~ 260 PV/1000 inhabitants
• 68% of trips gravitate to central area
• Every 5th trip in peak hour crosses one of the rivers
• Most intensive passenger flows occur over the river Sava
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
• Optimal interconnection of the overall city functions;
• Mutually harmonized development of all transportation modes;
• Effective and rational use of transportation capacities;
GENERAL GOALS OF TRANSPORTATION DEVELOPMENT
BELGRADE
• Effective and rational use of transportation capacities;
• Increase of level of service and transportation safety;
• Decrease of traffic volume in road/street networks;
• Increase of public transport’s attractiveness in comparison to general
traffic;
• Decrease of harmful traffic impacts on environment and cultural-
historic heritage ;
• Rational use of material and financial resources.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BLDPA
IMPLEMENTATION OF THE LAND DEVELOPMENT PROGRAM• Elaboration of Urban Regulation Plans.• Preparation of technical documentation for the
construction of public facilities.• Solving ownership issues.• Construction of public facilities.• Capital investment in infrastructure development.• Land preparation for long term leasing.
OTHER ACTIVITIES• Entering into contracts with investors who build new
structures in Belgrade defining terms for developmentfees .
• Preforms all technical, legal, financial, administrative and other specialized tasks related to the Program and monitors its implementation.
SOURCES OF FUNDING• Leasing land fee.• Public land development fee.• Funds from international financial organizations EBRD
and EIB for capital infrastructure projects.ANNUAL BUDGET
• Aprox. 200 million euros.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
- UMP-Inner City Semi Ring Road (ICSRR)
- Sava Bridge
INFRASTRUCTURE AND TRANSPORT ON-GOING PROJECTS
BLDPA PROJECTS
- SMT – North Tangent Road
- Zemun –Borca Bridge
-- Belgrade Urban Renewal Project
- Bicycle paths
- Belgrade Transport Masterplan
- Belgrade Metro
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BLDPAPUBLIC TRANSPORT
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
PUBLIC TRANSPORT
PT functioning inside Integrated system which
includes:
• Integrated network,
• Integrated time tables,
• Integrated tariff and ticketing system,
• Integrated operation managing
Dipending on the zone Integrated tariff
system (ITS) is divided into:
ITS 1 – territory of 12 central city
communities, and
IТS 2 – territory of 5 suburban city
communities.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Within the territory of 12 central municipalities (ITS 1) the only public transport operator is Public Transport Company “Beograd”. ITS 1 encompasses a very branched lines network consisting of 144 lines – with total length of 1,827.9 km, namely:
12 Tramway lines (127.3 km long),
8 Trolleybus lines (58.1 km long),
127km
58km
PUBLIC TRANSPORT
8 Trolleybus lines (58.1 km long),
124 Bus lines (1,642.5 km long)
Within the territory of 5 peripheral municipalities transportation service is provided by the private operators (bus transport).
58km
1642km
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
According to the valid time table, along daytime network lines (ITS 1), the
total number of vehicles operating during peak hours is 1.334, namely:
150 Tramways, 12 %
7 %
PUBLIC TRANSPORT
97 Trolleybus,
1087 Bus.81 %
7 %
1334 Vehicles = 940 PTC vehicle + 394 Private operators
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
PUBLIC TRANSPORT
CITY RAILWAY
• Corridor: Batajnica – Pancevo Bridge
• Length: 25.100m
• Stations: 9 per direction• Stations: 9 per direction
• Number of vehicles: 7
• Interval: 15 min.
• Started in April 2011.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Ticketing System
Season tickets:
• for unlimited number of trips
including all ITS lines in daily
transport,
Single tickets:
•valid for one continuous ride in
one direction,
• can be purchased outside the
PUBLIC TRANSPORT
• to be bought once a month at
PTC sales places,
• month validity,
• to be shown if requested by an
autohrized person (not otherwise
validated)
•Price 26.8 €
• can be purchased outside the
vehicle (news-stands) and in the
vehicle (from the driver),
• to be validated upon boarding in
ticket validation boxes.
•Price 0.5€ ( 1€ in vehicle)
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
THE INNER CITY SEMI-RING ROAD (ICSRR)
• ICSRR represents the first big
investment in the main road
network after construction of the
highway through Belgrade.
• Urban Master Plan – Belgrade 2021
contains the basis for ICSRR
ICSRR
contains the basis for ICSRR
development
• Total length: 17 km
• Length of Tunnels: 2.9 km
• Length of structures and bridge:
5.5 km
• Total number of intersections: 22;
15 of which are grade separated
intersections
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
ROLE AND TASKS OF THE ICSRR
• ICSRR is a part of the city magisterial network
• It should provide efficient urban transit flows
• It should provide efficient distribution of traffic which gravitate to
ICSRR
• It should provide efficient distribution of traffic which gravitate to different city areas without passing through city centre
• It is expected that above mentioned functions will relax Central zone of unneeded transit flows from one to another city area
• ICSRR should perform both transit and distributive function generated by Belgrade citizens and commuters
• Such function requested specific design solutions
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
PROBLEMS TO BE SOLVED BY ICSRR CONSTRUCTION
• The volume of the main road network during the the morning peak hourexceeds the number of 55.000 vehicles, and by the year of 2021 the volume is expected to reach the figure of 105.000 vehicles which represents a 90% increase.
ICSRR
• The 24% reduction in traffic flows on the bridges is expected after the completion of the ICSRR construction (accordingly in the City Centre), and in impact area even the reduction of 40% during the morning peak hour.
• Expected travel time saving, in the first phase, implies more than 14.000 hours in the peak hour.
• Traffic volume reduction in the Central Area will result in essential decrease in air pollution and noise.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
SAVA BRIDGE
Sava Bridge is a part of ICSRR
Contract Value – 118m EURFinancing :EBRD Loan
Contractor: Consortium-PORR Bau GmbH,DSD GmbH
SAVA BRIDGE
Supervision: Louis Berger Group
The bridge is a 6 span, continuoussuperstructure with an overalllength of 969 meters and deck widthof 45 meters.
The main support system is a singlepylon asymmetric cable stayedstructure. The pylon is 200 metershigh.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
SAVA BRIDGE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
SAVA BRIDGE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
SAVA BRIDGE
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
SAVA BRIDGE
Approach roads Approach roads –– South and NorthSouth and North
• Construction costs: 146+60 mill Eur
• Completion: end of 2013.
• Loans (bridge + approach roads) :
EBRD - 129 mill EurEBRD - 129 mill Eur
EIB – 160 mill Eur
• City of Belgrade: 60 mill Eur
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
SAVA BRIDGE
South South Approach Approach RRoadsoads (SAR)(SAR) –– Radnicka InterchangeRadnicka Interchange
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
SAVA BRIDGE
Approach roads Approach roads –– South and NorthSouth and North
SAR NAR
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
- EIB Loan: 90 Million EUR invested in:
• Tramway rail reconstruction, 33.8 km
URBAN RENEWAL PROGRAMURBAN RENEWAL PROGRAM
URBAN RENEWAL PROGRAM
• Tramway rail reconstruction, 33.8 km
• Introduction of the public transport management system
• Refurbishment of tramway vehicles
• Reconstruction of streets following the completion of the utility
installation works
• Construction and widening of roads Slavija-Zicka, Juzni bulevar-
Cingrijina and Partizanski put, 8.8 km
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
URBAN RENEWAL PROGRAMURBAN RENEWAL PROGRAM
Reconstruction of Boulevard of Kralj Aleksandar
Contract Value 17.5 Million EUR
Financing : 50% EIB Loan, 50% City Budget
Scope of Works: • Removal of the 2.5 km tram rails
URBAN RENEWAL PROGRAM
Scope of Works: • Removal of the 2.5 km tram rails
• Reconstruction of the electricity supply
• Road reconstruction
• Reconstruction of the complete infrastructure (water
supply, sewage system, electrical and
telecommunication network, district heating system,
street light)
• Reconstruction of the traffic lights and signal system
• Reconstruction of the side walks
• New parking places – over 400 new ones
• New alley
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Reconstruction of Boulevard of Kralj Aleksandar
URBAN RENEWAL PROGRAM
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Reconstruction of Dr Ivana Ribara Street
Contract Value 2 Million EUR
Financing : 50% EIB Loan, 50% City Budget
URBAN RENEWAL PROGRAM
URBAN RENEWAL PROGRAMURBAN RENEWAL PROGRAM
Scope of Works: • Removal of the 1.7 km tram rails
• Reconstruction of the power supply
• Road reconstruction
• Reconstruction of the infrastructure
• Reconstruction of the traffic lights and signal system
• Reconstruction of the side walks
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Reconstruction of Dr Ivana Ribara st.
URBAN RENEWAL PROGRAM
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Contract Value 2.5 Million EUR
Financing : 50% EIB Loan, 50% City Budget
Reconstruction of Cara Dusana st.
URBAN RENEWAL PROGRAM
URBAN RENEWAL PROGRAMURBAN RENEWAL PROGRAM
Scope of Works: - Removal of the 1.0 km tram rails
- Reconstruction of the power supply
- Road reconstruction
- Reconstruction of the infrastructure
- Reconstruction of the traffic lights and signal system
- Reconstruction of the side walks
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Reconstruction of Cara Dusana st.
URBAN RENEWAL PROGRAM
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Contract Value 3.8 Million EUR
Financing : 50% EIB Loan, 50% City Budget
Reconstruction of Resavska st.
URBAN RENEWAL PROGRAM
URBAN RENEWAL PROGRAMURBAN RENEWAL PROGRAM
Scope of Works: • Removal of the 0.7 km tram rails
• Reconstruction of the power supply
• Road reconstruction
• Reconstruction of the infrastructure
• Reconstruction of the traffic light sand signal system
• Reconstruction of the side walks
• New parking places – over 400 new ones
• New alley
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Reconstruction of Resavska st.
URBAN RENEWAL PROGRAM
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Contract Value 81,3 Million EUR
Financing : 25% EIB Loan, 75% City Budget
Description: • Company - CAF
• Total No. of vehicles: 30
NEW TRAMWAY VEHICLES
URBAN RENEWAL PROGRAM
• Total No. of vehicles: 30
• Vehicle length: 32 m,
• Vehicle width: 2,3 m,
• Capacity: 242 passengers, • Prescribed speed: 60 km/h.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
NEW TRAMWAY VEHICLES
URBAN RENEWAL PROGRAM
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
NORTH TANGENT ROAD
Sector I with Danube Crossing Bridge (Zemun-Borca)• Length: aprox. 8 km
• Estimated Cost: €120 mil.
• Completion Year: 2013
Sector II and III (Ovca settlement zone)Sector II and III (Ovca settlement zone)• Length: aprox. 12,5 km
• Estimated Cost: € 30 mil.
• Completion Year: 2015
Sector IV with Danube Crossing Bridge (Ada Huja -Pancevo)• Length: aprox. 3.3km
• Estimated Cost: €130 mil.
• Completion Year: 2018
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
ZZemun emun –– Borca BridgeBorca Bridge
ZEMUN – BORCA BRIDGE
• Lenght of the bridge – 1,5 km
• Contractor: CRBC
• Completion – end of 2013.
• Construction costs 180 mil. euro
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
• The project is based on Belgrade Urban Master Plan.
• Taking GP as a base within the Smart Plan several
Transportation Master PlanTransportation Master Plan –– SmartSmart PPlan Beogradlan Beograd
SMARTPLAN
• Taking GP as a base within the Smart Plan several
options were derived and assessed with aim to find
best possible solution for Belgrade transportation
problems.
• The assessment was undertaken taking into account
transportation efficiency as well as economic City
potentials.
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
SMARTPLAN
Planned traffic in morning peak hour, 2021 [veh/dir/h]
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
Identificationof Problem
Identificationof Problem AnalysisAnalysis Solution
approaches
Solution approaches
EnvironmentEnvironment
InfrastructureInfrastructure
Transport Master Planning ProcessTransport Master Planning Process
SMARTPLAN
Impactanalysis
Impactanalysis
Design of measures
Design of measures
Assessmentof Benefits
Assessmentof Benefits DecisionDecision ImplementationImplementation
DemandDemand
BudgetBudget
FutureRequirements
FutureRequirements
InfrastructureInfrastructure
Land useLand use
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
• Improvement of functionality of transportation system .
• Consistent transport system, harmonised with urban concept.
• Strategic decision support for transportation planning.
• Definition of all relevant investments on all transport modes.
Goals of SmartplanGoals of Smartplan
SMARTPLAN
• Definition of all relevant investments on all transport modes.
• Establishing financial potentials (public und private investors).
• Institutional framework for implementation of rolling investment
plans.
• Prioritisation of different investments according to economic and
other benefits on a long run.
• Setting up an action plan for (long term) investments in
transportation and traffic.
Alignment Overall NetworkTVORNIČKA
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE METRO SYSTEM
47
BLOK 45
VidikovacUSTANIČKA
BLOK 45
TVORNIČKA
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE METRO SYSTEM
48
USTANIČKA
VUKOV SPOMENIK
BELGRADE LAND DEVELOPMENT PUBLIC AGENCY
BELGRADE METRO SYSTEM
BELGRADE METRO
Investment in overall network 1.1 Billion EUR
Line 1, Investment 450 Million EUR
Description overall network: • All network includes 3 lines
• Total length 36.076m (21.645m surface, 14.431m
49
• Total length 36.076m (21.645m surface, 14.431m
underground)
• Total number of stations: 55 (32 surface, 23
underground)
Description Line 1: • Line 1 length 15.037m (7.999m surface; 7.038
tunnel) possible extension to Block 45 (length
3.784m)
• Number of stations: 25 (14 surface, 11 underground)
THANK YOU FOR YOUR ATTENTION !THANK YOU FOR YOUR ATTENTION !
!!
Mr. Zoran Rubinjoni, M.Sc.T.E.
Belgrade land developmet public agencyProject immplementation unit
www.beoland.com
Mr. Zoran Rubinjoni, M.Sc.T.E.
Executive director