Name: Youngs Creek Measurements: 7‐1/2 MW Date of Birth: November 15, 2011 Parents: Snohomish PUD 1 st Year Operating Challenges

Transcript of Year Operating Challenges - · PDF fileYear Operating Challenges. ... `Put lots of thought...

Name:  Youngs CreekMeasurements: 7‐1/2 MWDate of Birth: November 15, 2011Parents: Snohomish PUD

1st Year Operating Challenges

It’s fun to begin with, but months and months of waiting, nausea, arguments, lots of guests visiting, hard labor & sleepless nights but finally:

The hard part is over right?!

Baby Pictures◦ How the Project Works

Cleaning up after baby:◦ Warranty items; debris; slides

The parenting books say:◦ Programming: Testing to simulate real world

(Load rejection, Lube oil pumps, fish screen breakers, trash­raking)

Visiting the In­laws:◦ Complying with Monitoring & Regulatory Requirements

PROJECT FEATURES

WARRANTY WORK

Careful of underground conduit in area of fill compaction – larger penetrationsKeep GC on top of suppliersRoad maintenance will happen – better to own the roadway vs share.

PROGRAMMING

Simulating a load rejection

Sequencing of lube­oil pumps

Gages at Intake (trash rack differential)

Put lots of thought into designing good testing protocol

Balance equipment protection vs. consequence of fast shutdown

REGULATORY REQUIREMENTS

Off­license MOU

Gage locations

Read­rate of ramping / Instream Flows

Do the leg­work in advance of project.

Clarify unclear permit/license requirements in advance of construction

Make sure compliance points are thought out

Youngs Creek had a very successful first year of operations, but there is always something to be learned and improved on for future