Raised Access Floors Electrical stations, s witch rooms and server rooms.

15
Raised Access Floors Electrical stations, switch rooms and server rooms

Transcript of Raised Access Floors Electrical stations, s witch rooms and server rooms.

Raised Access Floors

Electrical stations, switch rooms and server rooms

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 2

For screwing of panels and stringers

For fixing of the gasket

Fixing of standard stringer

For fixing of the gasket

For fixing of the pedestal bracing

Hole for locking glue

Raised Floor PedestalsHead plate

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 3

Profile dimensions

CL41 x 40 x 1

CM84 x 40 x 1.7

CH126 x 40 x 2

CS41 x 40 x 1.7

Reinforcement profilesOverview

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 4

Advantages:

- Easy installation

- Huge time saving with spring clip installation

- Standard range of pedestals

- Product is protected by utility patent

C – Profiles

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 5

Install spring clip from below into the slot

Turn of 90° clockwise

Also with deinstallation!

Variant 1:

High Strength Reinforcement Profiles Fixing

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 6

Variant 2:

Install hammer head screw from below into the slot

Rotate screw 90° and tighten it

High Strength Reinforcement Profiles Fixing

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 7

High Strength Reinforcement Profiles Panel support

Fixing gasket:

Support of the raised floor panels

Fixing gasket with four noppes for

supporting the corners of the panel

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 8

Connection of reinforcement profiles:

Cross connector:

- Connection on the reinforcement profile

with drilling screws

- Connection of the crossing

reinforcement profile with drilling screws

High Strength Reinforcement Profiles Parallel and cross connectors

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 9

Connection of reinforcement profiles:

Parallel connector:

- Connection on the reinforcement profile

with drilling screws

- Connection of the additional

reinforcement profile with drilling screws

High Strength Reinforcement Profiles Parallel and cross connectors

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 10

Reinforcement profiles

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 11

Switchgear Constructionfor Server / Control Rooms

System solution:

Placing of the pedestals (grid acc. to plan)

Installation of the reinforcement profiles

regardless the later position of the control

resp. Server cabinets

Mounting of a installation frame:

- Support structure for later installations- Position of the frame anywhere possible- Keeping of the floor grid by displacing the installation

frame by the half of the switchgear width

- No cut panels necessary with the positioning of the

installation frame in the grid

Installation

frame

Panel

Reinforcement

profile

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 12

Switchgear constructionLater conversion

Flexibility with change of use:

Replacing of switchgear cabinet / server is

easily possible

Replacing of the installations in the panel grid:

- Replacing of the installation frame in a different grid field

- Closing of the previous opening with the panel which

were taken out of the new opening

- Replacing and cabling of the equipment

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 13

Switchgear constructionLater conversion

Flexibility with change of use:

- Replacing of the installation frame in any desired position regardless the panel grid

- Fixing of the installation frame with cross resp.

longitudinal connectors

- Closing of the previous opening with the panel which

were taken out of the new opening

- If necessary, cut panels have to be supported with

additional reinforcement profiles

- Replacing and cabling of the equipment

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 14

Application area:

- With high loads

- In computer centres or switch rooms

- With high construction heights of the system floors

- With dynamic loads

Switch Room Constructionfor server rooms / switch rooms

Company: Lindner Group | Department: PM Flooring Division | Topic: Product Training Floor Systems | Date: 12.2.2009 | Page: 15

Thank you for your attention!