Docunentof The World Bank FOROFFICIALUSE ONLY Repowt No. 7687-MAS STAFF APPRAISAL REPORT MAURITIUS SECOND HIGHWAYS PROJECT OCTOBER 19, 1989 Infrastructure Opcrations Division Eastern Africa Department Africa Region This document has a restricted distribution and rnav be used by recipients onls in the performance of their official duties. Its contents mav not otherwise be disclosedwithout World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of World Bank Document - Documents &...

Docunent of

The World Bank

FOR OFFICIAL USE ONLY

Repowt No. 7687-MAS

STAFF APPRAISAL REPORT

MAURITIUS

SECOND HIGHWAYS PROJECT

OCTOBER 19, 1989

Infrastructure Opcrations DivisionEastern Africa DepartmentAfrica Region

This document has a restricted distribution and rnav be used by recipients onls in the performance oftheir official duties. Its contents mav not otherwise be disclosed without World Bank authorization.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

CU C OALEFNT

Currency Unt - Murnitn Rupee (AR)USS 1.00 15.0RAR 1.00 - uSS 0.066

WEIGHTS AND MEASURES

1 meter (m) - 3.28 feet (ft)1 kilometer (kml) - 0.62 rile (mi)1 square kilometer (km2) - 0.386 swYare miles (sq mi)1 hectare (ha) - 2.47 acres (ac)1 metn-ic ton (m ton) - 2,205 pounds Ibs)

ACRONYMS AND ABBREVIATIONS

AM - Ar MauritiusCAD - Civil Aviation DepartmentDWC - Development Works CorporationFAC - Fonds d'Aide at de CoooeratlonMEPD - Ministry of Economic Plarr&n and DevelopmentMOF - Ministry of Fhance14A - Maurltks Marhe AuthorttyMow - lnstry of WorksNTA - National Transport AuthorityNTC - National Transport. CorporationPMO - PrVne Mnister s OfficePSIP - Pubilc Sector investment ProgamTD Tectvcal Division, Minstry of WorksUNDP - United Nations Development ProgramVOC - Vehcle Operating CostsVPD - VeNcls Per Day

FISCAL YEAR

July 1 - June 30

FOR OFFICIAL USE ONLY

SFCTD NO(WAYS PRtLCT

Page No

LOWAN AND PROECT SUL"Y

1. THE TMspORT sECT!R

A- Geo0fpVhical & Econat Settkg ..... ................ 1B. The Tranort System ................... ....... 1C. Transport Plarr,ng Policy & Coornatbon ................ 4D. Past Bank Group Transport Sector Operations ............ 5E. Rationale for Bank Group hnvdvement .... ............. 6

11. THE IIAY SECTOR

A. The Network. 7B. Road Use. 7C. Adnfistration, Staffkig & TrahiV .................... 8D. Hlway investnmt Plan (FY88-90). 9E. Hlway Fhranch g.9F. EnrkeerV & Construction .10G. Road Maintenance .................. I . , 10

! ~ ~~~111. THE PFORAO

A. Objectives ................................... 11S. Des tion .................................... 11C. Program Cost Estinatas and FharckV .................. 15D. Ecnonmk .Astfcatlon of the Program .................. 17

IV. TIE PROJ;ET

A. Project C aooetlon and Costs ...................... 19B. hpdementatlon and Procurement ...................... 21C. Disbursenents ................................. 23I. Aocounw Audthg and Report Requsements ............. 25E. Environmental Aspocts .......... I....... I ........................... 25F. Poverty Alleviation Aspts .25

ThF reort Wa papm by W. Milm S.V. RaUtiun (tion Leader) and Mews.Plr Sooh (S. H4ay Err). Mot Ga (Caritit.) to&MV o an alssl missionh May 1989 and Project PrIperat hIcrs b' 1988. Miss Lim Velasoo providdSWstil sric.

This document has a restricted distributiott and may be used by recipients only in the performanceof their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

V. -T

A. General 26B. Project Cxots & B.nefits.. 26C. Eoonaic Retun & Sensutvty Antyss .27D. Project RP..s 29

VI. A .30

1. Road Strngtr w*g wnd hIrovement Progr n1. Saqnt Detalf of Econoic EvahlationIll. Road Strengtwg and hiwovement Program - Dedlg StandardsIVa. Road ReeLtackVg - ProgrunIVb. Road Res.rfacig - ProjectVa+b. Road 6aintenhnce EquZmentVia. Trafflc MaragementVb. Vehice Safety and Enveslon ControdVIl. Torme of Reference for Coreultancy ServkeseVil. Rebted Docusiets and Data Avalabie hi tioe Prcject Fle

imLES

1. Road NetworK (1984 - 88)2. Motor Vehicle Fleet (1984 - 1988)3. Distrbution of Buseu Acoordxnr to Operators and Vehkce Make4. DIsrutlcn of Busee Accordin to Operators and Age5. Bus Operational Statbiscs6. Operatioal Statsbti of hvortant Bus Cayparee7. Traffic hI Port Louis8. Ai Traffic (At Plalsance)9. MaurWts Marhe Authority Income and Expentture Account10. Air Maualti Ltd. - Anatysfs of Reveue and Ependtuee11. CNv Aviation Departeant - Reverue and ExpendtLres12. Fuel Prce StnActure (1987)13. Revenue from Road Traport14. Expturee on Roads1S. Reverwm and E rtLre of hortant Bus Ccnlaee16. Pu*ic Sector kveetment17. kveetmnt hi Port18. kwiwbn hi Aiport19. hwvemet hi Roads and hand Trneport20. Road Traffic Accidnts21. Sales (Quantity) of Motor Spht and Gas 01 and Market Price

1. Organization of Road Section of TecTiical DlYjSonII. Project h_kmentation Sdiedule

WE IBRD 21703

-us

l- 0

SFt4D I4OMAYS PROJEC

Govevmnent of Mawtitus

hu;uot USS30.0 nilon

TAM 17 years repayment wlth 5 years grace (IBRD)

Pro Iwt f~ib ctIvmN DmbUatlw The growth of motor veNice traffic on the prlmary NiwaY network of

Maurhtas has brougt Into sharp foous the hadeQjacles of many roadsectons whore desen standards are deficient and the accdent tollis heavy. The proposed Project would address ts core problm byselectivy strengthenrg and brrovng bnortant road sections wtth NMtraffic Intensity to hcrease the capa&.cy and service llfe of theseroads on an economrcally viable basis. The proposed Project wouik &a'oaddress the needs of the kdnistry of Works with respect to hprovng Itscapacity for road maintenance and traffic managanten Establisthigeffective automobile en*sslon control proceidres and marpowerdevelopment In the sector will aso formn an integul part of the Project.

amems The major economic benefits from the Project (about 80%) would comefrom savhng of the vehicle operational costs and reduced maintenancecosts of the road system. The proposed Project wouK also provkie forhproved traffic management, traffic safety and envrormnentalW[rovement (suc as vehicle emission control).

1bkx The propo.%d ProJect supports hih priority hnvestrmnts based on theGovemrre" FY88-90 Devepnment Pian. The economic JustUfkcatlon ofthe projepct . nents has been well estabIshed even underunfavorable hypothes concerning project costs and user benefts.The teodWcal sokAtlon adopted are based on adeq.ate enkerin andteChrcal studes. The pcssblUty of some delays due to dcffcutles Intakhg actual possession of lanZ along the roads to provIde adequatedralhage faclties and foot-paths mght occur. However, MlttIe addtionalland is Ikely to be needed for the Project, as most of the landrequrements are already part of the Goverrment's road reserve. Risksfrom hadequate project ktementation also seems n*imal as the physicalcorponents of the Project are essentially a follow-up of the on-go0gHigways Project

- IV

FOREIGNAS X OF

O,TAL LOCALI FOREG TOTA L TOTAL

I) Strethe* and h,roveent(45 ln) 8.19 15.50 23.80 65.00

1) ResrfacfrV Progwn (130 In) 2.48 4.70 7.18 65.001) Routho Maktwvc.ce Program

Equpmew 0.15 0.85 1.00 85.00Iv) Traffic Management 0.20 1.30 1.5.) 87.00v) Vehicle Emissn Control 0.04 0.26 0.30 87.00

vi) Consultant Services

(a) Preparatlon of (0)2 0.00 0.40 0.40 100.00(t) Sueviion of (I) 012 1.30 1.42 90.00(c) Tedcical Astance 0.05 0.46 0.51 90.00(d) Trakhg Q0QZ QQ3 000o

Subtotal: 0.24 2.19 2.43 90.00

TOTAL BASE COST: 11J3 2A8 3610 llJ00

ConthVenctes

(a) Physical 1.09 2.48 3.57 69.00(b) Price 1.21 2.72

Subtotal: 2.30 5.20 7.50 69.00

TOTAL FINANCING REQUIRED: 13AQ A000 436 f9 00

L2UI ForeS Iglal of Total

BRD 0.0 30.0 30.0 69

GOM 13.6 0.0 13.6 31

Total 13.6 30.0 43.6 100

1 Including taxes estimated at US$5.4 million

2 PPF Advance No. P-123-MAS

I-~~~~~~~~~ E82-ambwmint. in EX EF EX2 EXM EX2

A4mal 1.9 6.8 8.8 7.8 4.9cumulative 1.9 8.5 17.3 25.1 30.0

Eak2kRate of AR 28 Percent

K - -1SEtdD II"AYS PWMCT

L THE 7RANSP3jT SECTOR

A. Go~eIu Ewtaitc Sambt

1.01 Maurfitls (IBRD Map 21703) Is sItuated in the hdan Ocoan about 2.400 'mfrom the African mahianda In addtKor to the main Wand, Maurltus, there are a few smallerIsands scattered in the Indan Ocean, the most bportant of which s Rodrigues. MaLtuk.shas a dense road network to kntegate Its 2,400 sq km of territory and to serve theneeds of Its population of about 1 ntUion on the main iandu In addtIon, about 35,000people live In Rodrigues and other sma islands. About hatf of the main sliand is arableland; the rest Is made up of rocks and mountahious slopes too steep for oAtivatln. Withthe exception of a few rocky areas, mostly alng the sea coast, the terraIn does notpose too much diffttty for land transport.

1.02 In view of the raeoteness of the country from Its tradig partners,International conectiore are of speclal concern to MaurtLus as Kt ahn to kipove ttsIntegration wtth the world economy. The country's forslgn trade depends signficantly onthe avalablIty of an efficient road transport system feedIng KS 'nternatlonal seaport andakrport Inter-sand comricatlon is generally Wt and Irregular.

1.03 The cotry has wtnossed a remarkable economic progress during the lastfive years, unrpecedented In Sub-Saharan Africa. The rsite of economic growth averagedover 6 percent per year durVg tNh period, whle the tate of unemloyrrent declined from19 to lee than 4 percent durig the same perod In step with the econaroc develoment,total frelgt and passenger traffic also grQw at about 8-10 percent per arvi during thesao period.

1.04 Beng esmal and sWUA monocual, the economy of Maurtk Is overlydependent on exports of sar and garmnt and development o Iternatonaxl toursm.The economy, thus, remahs hlguy vuwrable to exogenous factor- such as weatherhnduced output fbctuations or unoresoen movremnts in the tenns of trade. Given thecountrys preeent ttruat for ncreased exports and llberatdng hpots to promoteconpetKin, a Noer premium is bein placed by the cowt on the more efficientoperation and utilzation of exItin trarnport assets carrykf sktigcant voIUns offoreln trade and on Investnetns deeWled to remove cical bottle*ecks on Internationaltrade routes

B. T Tt Sm

1.05 Roads (about 1,800 ;an In 1988) anid road tranrport (about 52,000 motorvehkcle In 1988 excludng motorcycles and autocycles) are the oely means of domestictransport In Mawitkas. There are no rallways, p1pellne, coastal shIpping or hland

waterways. The rabvay wich was Introduced hI 1864 c4ked down exactly a hureodyer later. Maurtba ha one doep-water port at Port Louis and an hterational a*portat Plabbance.

Roads -~ Road niwvrrt

1.06 The road network consists of about 1,800 in of roads which are clasidhIto tour categore motorways, main roads, secondary roads and oUwr roads (Table 1).Motorways and mahk roads togethwr constitute naly hanf of the network, while the otherhalf Is made up of secondary and other roads. The motor"ays, main roads and secondaryroads are paved Only about 140 lan of rural roads are stI urpaved

1.07 The motorways coripise the Port Louis-PhoenIx Nc (15 kn) and the PortLouis-PanVemoussse ln (11 Ion), wh are prlmarily desigred to relNeve trafflc congestionIn and around Port Louil The main roads constituto prb,cpal Zcs of the country's roadnetwork and comect detrict headquartern and main urban populatlon centers with oneanothr and wlth Port Louis, the capitaL Over 45 percent of the population roside Inthe Port Louis and Plahes Wilhems dstzlcts and there Is a corv:entration of h,ustry,coanerce and aministration In these region The spectrun of sfracoe transportfaciiti has, therefore, receved concentrated attention h thiss region and theaccessbIlty of the sland as a whole Is good and every viage on the IWand Is served byan all-weather road. WhNe the density of roads is Ng, ts qualfty needs substantalkh rovement (Chapter II).

1.08 The motor vehicle flet hI 1988 totaled slId,tly over 90.800 (Table 2), ofwch about 3,300 vehiles were owned by the Goverrient Tha floeet i amposltion Israther stable, about 35 percent passenger cars and about 15 percent landrovers andpick-ups vans; these two categorie accournt for neary half te ftleet sie. The trucks,traers ard buses corstue less tan 10 percent of the flet. Other types of vehicles,namely, motorcycles, autocycde, tractors, dumpers, road roUers. etc. account for slgiitover 40% of the fleet size. Over the perlod 197-84, the fleet was alnost stagMtgand the average amual growth was only about 2 percent Of late, the growth rate otmotor vehicle fleet has picked up and has abiioet doubled. The wahNg of the bn6rtquota on motor vehlices In 1984 and of customs utibs on goods vehicles skco 1987 haslargely h tlun the recent kwease h growth rates.

1.09 Passenger transport Is now rogtaated, while freit transport Is, by and large,deregated. The private car ownershp which was 35 hhVatants per car hI the 1987 isexpected to be about 30 habitants per car I early 1990's. There wE sti be a highrellance on the pubic passenger transport servkces for meeting the transport needs ofthe vast majority of the popuatlon. Bus operation I Mauritius Is presently carried out bythe National Trwuport Corporation (NTC) which Is a parastatal, fow private bus conPanles(Unitd Bus Servce, Rosei Transport, TrIolet Bus Service anm Mautan Bus Transport)and about 380 Idvividal bus operators with a total fleet of about 1,456 bes (Table 3).The h'dvldual operators own about 45 percert of tne bus fleet There are a'out 20dcfferent makes of buses hI the country and the bus fleet is ag"g (Tables 3 &nd 4). Busoperational statistics (Table 5) hdcate that average jowneys Per day, average vehclekimeters per day vmd average groes recelts per day all have hkiaeased betwoen 1983and 1987. There Is, however, sfklcant variation In the operatlonitl performance amongstthe 7rportant bus conparie (Table 6). The National Transport Authority (NTA) Isues

-3-

oeneee to operate an ths variou routes, reguites tariff In psser trarnport and ialso reeponebe for erourti conpanoe with agreed tkstabea

1.10 Fre4ft trurport Is fy caried out by private operator Thee are about10 major conpanle and hurods of khvLal carWs with more than 5,000 trucks hIpubic use. There are no restrictions for entry hto the hInstry ard no official tartffs.

pa 9

1.11 Port Louls, the countrYs onty deep-water port, has fie berths with craftsvaryWig between 9 nd 11 meters, two of wid are for contaier traffic. aiso hassepaate tenvInais for handig sugar exports and fudl bports hI buk. hi addton, thereare Wterage facies and quays used by fishig veeseCL Wlth the economic growth ofthe oontry the cargo traffic hI the Port is hcrsasig signlcfk- (Table 7). hIpartilar, the hcrease hI contahter traffic durhn the last two years Is verycxnspIuouxs A double tdft system (7:00 a.n.-3:00 pm/3:00 pnr.-l 1:00 p.L) has beenhtroduced at the Port se erly 1988 for handNng of contakw traffic Themanagement and staff of the Port are teclVcaRy wel qualified and conV.tent.

1.12 There are at present four Conferences servhi Port LCui: Cknacoem,Entente de Frets, Red Tartff and Far East/East Africa. hI addUon to the severalcompanies hi the Conference, there are about dghteen other shiping lies servigMawltuas. Govermment's siphO poky lays specal ewtfhas*s on the promotlon ofhtematlnal trade, fore;gn exchange earnigs, creatlon of sinoyiment and devekoment ofreglonal trade. The htalaane of mam!Iactured expors and h apor does not at presentwarrant the acquiition and estabisnent of a national ller cargo vessel. However, ushgsugar as a base cargo, the Goverrwmit Is exporh the pos*ilty of ushg corbiredcargo vesseds to carry buk sugar and retun wtth contaherized general cargo fromEurope.

Air DAM

1.13 hI view of Mauritius' oVn dlotances to the African mailand and the rest ofthe world and ts potentW for the development of Itesntinal tourbn, air trani'ort hasparticuluar otance In the development of transport sector strategy. Passenger trafficat the Plaisance alport has grown steadly from 396,000 hI 1984 to 643,000 In 1988(Table 8). wi addUton to the International akport at Plalsance, capable of aononodatkngwld-body Jet aircraft, there Is a smal akport on Rodrgues Wand served by AirMaurftU.L Wlth te growth of traffic at Plaisance atport, a thres-phased development forthe modwrtzatlon of the aklport covering a 15-year pe-od has been taken h hand. kithe ftst phase, daIg the last five years, several major works have been carried outwhkh hdcmude streengthmnig and resvrfachV of the ruway, Installation of navigation aidesand the hutnsnent anvig system and tho construction of a new control tower, teniMalbulidng, access road and car park. The national a-ble servie, Air Maurltus (AM) Is wellraum The Government's polcy Is to provide an ncrasb0y effMent cli avlationhfrastructure and an operatinaly competent and well-managed natlorni ahhe to meet thegrowig demand for air traffic.

c -~-4

C. T MtPT~ ~ ~ak

1.14 The L*Utry of EconomIc Planning and Development (MPD) overvlbwdevelopment h the trwuport sector through ts review of hIfrasul'cture plans. However,responbty for th mangent, co-ordnaton and polcy kftatives f c the transportsctor Is dvked on various mrhdstrlee/departments. Mnstry of Works (MOW) Isresponebe for develpment and matenance of motorway and nih roads, wtle ttiupkeep of seondary and other roads Is the responsibility of loal authorlties. TheNatinal Transport Authorty (NTA) bI n In rg of the road tranaport hkdstry; MaurtAusMarhe Authority (MlA) rder the Prho Ih1steres Offle (PMO) handes port operations,wIie Civil Aviation Department (CAD) under the PMO Is responsile for plarvirg, regulationand operation of air traroprt.

1.15 Transportation projects hkcuded In the development plans orl$nate both atthe micro--level through the hustr!al enterwrbes and local authorities (especially formuncipal and local roads) and at the macro-level throug MEPD. The demands fortransport by the economic enterprises and sectors are reconcild by MEPD iconsultation wtth the shtry of Fhance (MOF) with due regard to the Govemnent'spolicy obJectives to-

(I) encourage more efficient operation and utlzation of the exstktgtransport hfrastructure with speclal en*hasls on the hprovementof external srade routes canry substantlai vokm, of goo90and passe&gr;

(11) develop al transport operations n a harmonized maner, hI fubco-operation with the producg, warehousrig, forwardIng unitsand users to make them competltlve, cost-effective and energyeffticent,

(lii) encourage mass transportation by public conveyances-ansd

(iv) promote and strengthen the transport comares' ser- fhanckgcapabwJee

The Govennent's geral avproach to assln priority to completion of on-gorV projectsand to rehablltatkoimprovement of exstkg hnfrastructure based on the aboveconskderations appears reaeonable

1.18 The cost recovery polcy In the tranport sector is highly satisfactory. TheMMA and AM (in dharge of operations and iranagement of Port Louis and the national alrnerespectively) are fhancaly viable and have registered slgfcant profits In successiveyears (Tables 9 and 10). The Clvi Aviation Departmnt Is also operatkg on a soundMeandal basi (Table 11). The fuel pricI poies of the Goverrnment are reasonable;there are no subekdes (Table 12). The revemues from road transport are sufficient tonmeet the armual development and maintenance of road Infrastructure on a pay-as-you-obasis (Tables 13 and 14). The flnanrcal performance (Table 15) of the nportant busconpanbes hgNits the urgent need for hV,oved prouctivity In this sub-sector toensure financial vlablity.

-5-

1.17 vstent proposals in the transport sector (Tabbe 18-19) are gerwralyIeinw%Pmead hwover, In view of the rood for prudet reowrco management, It bnecosary to prirtze these irwestments, with a patkWa sb an th pWobjectivee ewmnrated In pa 1.15. For htance, It Is urgent to Wove the ub*toarran t for rice handg at the Port .ch Ps Ft preeentw not cost-effective.Frothermore, the handlng of hazrdous cargo (Insecticides, d bwais, pafts etc.) at thePort ould be separated from the gneral cargo. Some efforts to mode the iadigNof hicreased contaher cargo w1th shore-based oe4nent (auLJh a gantry cran) deservesLrgent attentin On the other han te proposal for Introduicig Wht ralway to cater topassenger traffic neds searching sautiny. In case the Governet is not uceful InIts effort to got the propoed raNlway constructed on a build operate and trairwer (BOAT)balst, It would be prudent to review tM Investment agaInt appropriate ahmrnativee.Snharly, the proposal for the purchase of a new 9p by the pubic sector for hter-sandv*ipplng needs a thorough evaluation as privatization of such facitie Is Skely to promotethe better use of comMtiftlve forces, hWprove operatonal efficiency, brkV down costs andstkilate hInovation. In order to meet the Icreashg demand of the eornoy, theGoverwnt has prepared an hdcative Investment Progr-n for the Hlway Sector for afour year (1990-93) period Ths program was reviewed by the appraisal mission andfound appropriate (Chapter 111).

D. PisLt l6sn Tkt Sectr O a

1.1 8 The Bark has, In the past. fnhancec two proJe:ts in the trarnport sector: (I)extension and modernzation of the Port at Port Louis; and (H) the Hlghways Prcject

'.19 The Port Project (Loans 976-AAS and 1 339T-4AAS) heped fhance theconstruction of three deep-water berdw, two transt sheds, a contahor hardin andstorage area, an adistration bulkdIng, workshop block, port entrance drodnmg,procurement of ecriuent, and tectical aststance. The frst oan (LA 976-4AS) forUS$10.0 millon was approved In Apr 1974 and the second loan (LrL 1339T-MAS) forUS$3.6 rillon for a revied project was approved In Novenber 1976. The project wascoftanced by LK biateral aid (US$3.0 milon eqlvalent) and by UNDP (US$514,000),provdnWg for tchrical assistance to the port authorty. The project was successfullyconPleted In March 1983. Accordng to the Project CarPletlon Report (May 17, 1985)Maurithts now has antoe port capacity for Kts needs wtth modem facilities and Is managedby a competent port authortty. UnIder the modifled systemTw for project performanceaudttig, further evaluation of the project by the Operatlons Evaksation Department wasnot made.

1.20 The Hl.*ways Project 'Loan 2337-MAS for US$15.2 ritflon) was approved InAdy 1983. The Project comprsee strengthening and kprvement of 75 km of main roads,htprovement to MOW's iorks,hops, construction of a vehcIe nspection enter, andprocurement of road maIntenance eQ.utpment and potable we.trkdga. After experWecncertain delays, the project ks now almost conmete, fts main object'ves have been met.The closig date of the Loan account was June 30, 1989.

1.21 The Govemnent wishs to conthau the Barnks supPort In the transportsector, to hprove conietWtton and operatinal ehffcncy, hoesse foresg exchangeearnings by carrying mnore traffic kn htenatinl trade and coeerve energy. 'he Bankwil also have the opporturity to folow up the actMtlee Initiated under the Frst H 4 aysProject such as hcreased budgetary provisin for road maintenance, approprlate hunanresource development and sharper* of kweeTnnt analyss In the transport soctor. TheBank's involvement In the transport sector would also act as a catayst to enlist finarialsupport from other donors. The proposed Second Highways Project would fostercontiued :id effective policy daloge on these subjects and spport the on-gohgeconoxic and techrical efforts of the Goverrnent.

-7-

L TME Mh1MAY Cc

A. The 3s4mt

2.01 in terns of densty and dbtrbutkon, th road ntwork (Wars 1.06 and 1.07)satisfis the needs of the country. But Ka structure and geometry are hadequate tohands heavy traffic moesy on the main roads ~ carry on average betweon 5,000 to6,000 vehIces per day (VP). Wi the exception of motorways, most of Maurtlus' roadsorghated as ag1o.tural tracks whi~ were progresuvely bproved but wKthout properdesign and constructilo As a resut, pavements are heterogenous, structuray weak andlack drahage. Many roads are confined between agicutural fkeds (sugarcane), wlth notenoug room to provide adeqwate shouiders, and roadside draiage systems Due to theheavy voUme of traffic, routine road maintenance operations caried out by the Minstryof Works (MOW), can no onger arrest road deterioratiom Thm has caused a backlog ofroad maintenance, and traffic acckdents have inoreased kn the last two years by about24% and fatalies by about 16X Tmm network thus ne b,vrovement, strengthening andadewate maintenance to provide an acceptable level of sevice to the road users. Thesetasks have successfully started under the Flst Hlw ays Project, wtere about 75 kn ofmain roads have been bproved ana strengthend The proposed Hlway Program andSecond Hlvays Project wlU contirue and expand these actIvIties (paras. 3.02 - 3.08).

IL k 2Um

2.02 Ahnost al road sectio are predomiantly passenger traffic oriented.Passenger cars and buses genorafy constitute about 70% of the total srber of vehiclesplykrg daNly on such roads. Shoe a majority of thes trips are for busess and workpurposes, there are two dstnct peaks of daily traffic, one between 8 and 10 hours Inthe morning and the other between 4 and 6 In the afternoorL

2.03 Mauritlus' road net%ork Is charactertzed by hld vobme operation on a lbtedpart of the road network with about 10% of the kiometrage carrying about 50 to 60% ofthe total traffic. Ths has two hportant hplcations (I) that Nhay Investments InMauritius should be focused prtnarly on these high traffic denslty areas; and (U)dsperson of effort too thiry over a large sectlon of other road sections should beavokied

2.04 Due to the hth density and clse proxbty of urban areas to one another,dbUnctlon betwen urban and rural roads Is diffcult to make. This is reflected h thetraffic pattern on the isand. Besides motor vehicles, pedestrian trips In and aroundurban areas are siWfcant Absence of adewate foot-paths in th_e areas PO86serious traffic hazard. Thre are no aninal drawn vehicles on roads In MaltusK.

2.05 Urregulated axle loads of the fleet of heavy trucks have considerablydamaged the main roads In Mauitus. The Goverrnment has recently (1985) enactedleWslatlon prescribing the axle load biVts on shgle axle (10 tons) and tandem axle (thesum of the axle welts varyig between 20 and 24 tons depending on axie spachgs).Recently, several mobile axle load control eqWipment acquired under the Fbst Hglway Loan(Loan 2337-MAS) have been put to use selectively on h4h traffic density routes toredAce overioadng on bportant corrdors and kTvrove traffic safety. The proposed

- 8 -

Second High- ays Project wl support and strethen thi tatlave through provbisn ofadditonal road bw,ovement and equ4ment and Imementatlon of an action program agreedupon betwoen the Govemnwent and the Bank (paras 3.11, 3.12 and 3.13).

C. _ at,t

2.06 The MOW, through Its Tsctiial Department (TD), Is responsble forconstruction, rovement and maintenance of motorways and main roads, and also forconstruction and maintenance of builings. Rural roads are ad rWstered by the threedistrict councils, wiHe the krrovement and maitenance of Lrban roads Is theresponsbility of the five uncial councils.

2.07 Prior to May 1989, the TD comPrlsed dght professonal sectkxne Roads,Buldns, Materlals Laboratory, Traffic, Mecharical, Sewerage, Quantity Surveyhg andArchitecture. Road works were carried out by nine district units which were undo theresponsibillty of five territorlal units (North, South, East, West and Port Louis). Theesunits were also kn charge of building works, and hence reported to two Headquartersectons. Under the responsibility of the Mechanical Engineering Section, a CentralWorkshop In Plane Lauzun (Port Louis) with five outposts (Mahebourg, Vacoas, Centre deFlacq, Rose-Hill and Terre Rouge) ls In charge of maintahhg road equ.pment and vehicesof other miristrIes/departments, This orgarization, aKthough It had succeeded in keepin'- roads passable all year round, could no longe handle adeqwately the maintenanceneeds of the road network which were becomng hcreaslngiy conplex due to heavy trafficvolunes. Furthermore, long and cumbersome procurment and adymrstrative proceduresand lack of properly trained staff were scoe of the major constraints facng theorganizaticn.

2.08 In an effort to mrove and streni,,den Its road maintenance capacity, theGovemnent has created In May 1989 a fulklfdged decentralized road maintenanceorganization (Chart 1). Under the overall responsibility of the Princpal Engineer, roadmaintenance operators wIN henceforth be carri out by three dvsions each conprsirgthree districts. These dvisons are North (Port Louis, Panpleousse and Riviere DuRarpart districts); Center (Moka, Flacq and Grand Port districts); and South (Plains Wnms,Rlack Rlver and Savane ditrcts). These units hav^ been asslged adequate equipmert,personrve, material and suppllee to carry out routie road maintenance operation andemergencies works wlthin ther Jlsdction. The Prhctpal Ernner, with the assistance ofDlvision Ernweers, Is responsble for plannirg overal maintenance operaUons andmonitoring kementatlon through performance accounthg. Lkder the new organitationalarrangements, the Prhcpal Engineer (Planning) Is responsble for plarnnng, deslgn andsupervsIon of new construction and Wrprovements. In addition, the Govemment has alsotaken a poicy decbion 'o contract out resurfacing (pertodic maintenance) works toprivate contractors. Wltn regard to management of road maintenance equipment, whle theorganizational set-up of the Central Workshop (Chart 1) remaho the same, based on therecorilnJatkr of a racentiy caroTeted cxTisultant's study, the Goverrmnt hasIntroduced satisfactory kirovements In the operatonal procodres. These hinudestreamlining of procurement and disbursement procedures, and hntrodction of a system ofincentives for the staff. With these ehanges, the new set-up Is expected to become moreefflcent In tacklin road maintenance operations.

2.09 Each of the TD's sections, except Quantity Surveyin and Architecture, areheaded by Prhcpal Ernweers; the Quantity Surveyig and Architecture Sections are

headed by a Quantty Surveyor and Prrcpal Architect respectIvely; they all report to theChief Enerr. The Mecharical Engterkg Sction is staffre by a prhlipal nre, twomchanical engIners, two mechanical officers, a workshop supevir, sufficient ruberof support staff, and has a work foroe of about 100 qualified technicians (mechanics,e nqctrlcas, fitters, blacksniths, etc...). Road maintenance operations eploy about 3000staff khckaa about 60 hil-4evel staff, 200 tecvdans, and 2740 laborers. AfthouiadeWate rmewlcay, this work foroe Is not fuly traked to efficiently carry outmaintenance operatons. UndLr the proposed Project (para 3.18), a trahhg program wouldbe hnlmted to ut'ade the skins of these personnel.

2.10 MaurUius has adeQwate faciKts for trakhg cvil works persorv-el. TheUIveralty of Maurtkus offers courses In civN, mechanal and eectrical en0neerlng. Thehdustrial Trade Training Center (ITTC) at Beau-Basshi, establied In 1969 with LNDP/ILOassstance, and the ITTC at Ptton, estabished In 1979 with assistance provided under theBankts Fhst Ed&cation Project (Loan 1 033-MAS), provide vocatonal traIIg to about 480students each year. The oourses offered at the ITTCs hclide mehanical engineering,wektng and metal fabrication, masorry ani concrete work, etc. In addtin, the LyceePolytechnique set up In 1982 with the assistance of the French Govermnent providescourses In cvIl, mechanical and electrical tngieArIn for about 112 students arually.

D. I4kmav krtasft Plan (U88-90)

2.11 In the latest Public Sector Investment Program (PSIP) coverkg the FY88-90period, the share of transport Investment Is about 14% of the total public sectorInvestments (table 16-19). The earmarked hnvestments would amount 'o about 54 percentfor roads (Rs. 720 NIl!bn, I.e., about US$55 nillikn), 33 peroont for port (Rs. 450 rillon,I.e., about US$35 nillion) and 13 percent for aWport (Rs. 179 rillon I.e. about US$14nVillon). The share of the transport sector Is about the average for the countries of theregbon

2.12 In accordance with priorKtles ermidated In the PSIP, Govermments gerwalapproach to Nghway hnvestments Is to asslg Ndi priority to bTprovement and maIntenanceof roads carryIg substantial volume of goods and passengers, Improve road safety andensure more effecttve traffic management Completion of ongokg projects andrehablNtatxnirVrovement of existing Infrastructure consist the core Nwvay Investmentprogram (para 1.15).

E. HIa Iy

2.13 Funds for hway construction and major hrpovements are allocated from theCapttal Development Budget, and those for hgWay maintenance and mInor WrIovements areaNocated arnnally from the Recurrent Budget The MOW adchinsters the use of the budgetallocations for construction and maIntenance of motorways and main roads and the localauthoritis for the balance of the road network (para 1.14).

2.1 4 The allocation of Capital Development Budget and Recurrent Budget for roadsdurhg 1983/84 to 1987/88 are shown in Table 14. Wlth no fixed regulations forearmarkIhg resources for hlsXay hvestmens, the Governent determns freely theamount to be Invested from year to year based on estaNished prorlte3. The Governnent

- 10 -

confrmed a" gotaton that Kt would provide about Ra 50.0 m,kn (USS3.3 Milon) ayear ding FY9O-93 perd for reerfac,g works (periodic maitenanoc) hi the CapitalDevelopme Budget, and Ra 15.0 nMon (US$1.0 rVlloon) yeary dai FY90-91 and Ra. 24millon (US$1.6 mnbon) year" dlrhk FY92-93 for routkhe maitenance operation hI theReourrent Budget (para 3.08 and 3.20).

F. __ m

2.15 The Tedvlal Departnent (TO) of the MOW carries out m*hor road and briedesig ush Its own staff, while all esoonc feaslty and detaNed erineark studieare carried out by conewtants. The TD albo has a wel eqA4ped and well-staffedmaterials testkg laboratory Woated at Ks headquarters h PhoOeNL About 70% of theworkload hI the laboratory relates to deel and hveestgatlon work for rodsL The 1Dextends ts laboratory facuies to private ftme, It Is assisted by coruultants hI carrytout gootechircal hivestigatlorw for strengthenig and hp'ovemmnt of the roads. As Is thecase wlth studles for the project roads, foreir cornsitants somethmie form joktventvres with local ThrmL For new roads, such as motorways, ciesgn standards basedmahy on those developed by the LK Department of the Envorawent or the French Ministryof Equrwent have beoi folowed with certaih modficatkons to suit local cornitios Theseare aduwate.

2.16 Major construction works are carried out moty by foresg contractors orthek local branches after suitable prequaaflcation and conpetWve bIddkng The execatlnof these works Is supervised by consultants. The Development Works Corporation (DWC), aparastatal orgarizatlon established hI 1970 under the istry of Employment alsoudertakes a variety of clv engieerhig works both hi urban and rural areas. Whie thereare a large rumber of private fhins hI the country who can hande buildng contracts,there are only a few fnhi capable of undertakhig large road works. hI bldi docmnents,suggestion will be made to foresog contractors to use Mauritian tecuhcians and laborers

G. Roa otwuwm

2.17 Tne orgarization which existed prior to May 1989 (pars 2.07) was anhqedment to proper road mahitenarnce operations It lacked speclazation andconcentration on road maintenance problem which have become more conplex. Due to theadi*istrative bottlenecks, poorly maintahied equ.ment (wlth about 50% down me), a wilingpersomel but without appropriate trahho to deal with a rapidy deterloratkg network, anda lack of adequate fhianching patching and spot resealhig operatons were carled outannually on orny 300 kms of heavily traveled roads out of the 840 km of mahi roadswhile Nttle maintenance was carried out on the remuahg network, shouers and drahagestructuree The Fist Hlways Project has hIMated ImWovement hi ths area by providngfor assIstance to the central workshop, and e.pzment for the patching and resealhigoperation TNs has been folowed by the creation and hp,ementation of a full-pledgedroad maintenance organtzation (pars 2.08) accon anled by hproved management of acentral workshop and is outposts to provide promPt and adequate mahtance of roadprocurement The proposed ProJect wil conthue and consolidate ths Imrovement by: (I)providl,g addKional equormet, materlals and supplies (para 3.08); (1) carryhi out trahihigof the persorwn (par& 3.18); (O) providhig techrcal asistance for hpementatlon (Para3.17); and (Iv) providing adeqate, reliable and easily dabwsable fhancdal resources (para2.14).

- 11 -

IL MJNA

3.01 The objectves of the proposed 1990-93 H4way Progrun are to

I) protect capital kwvesthunt on roads by streng*ng and wprovi theservie Ife of bportarnt road setiors wlth hNi traffic itensity;

I) stre hen Mrs capacity for road maintenance plaT*i ad operatonhckxg traffic managemwt. and

U) estabihh effective vetide safety and nson control procewres

B. ammu

3.02 The progrn coanpisee of the fdoowhi oononentsa

I) strength V and bvwovent of about 108 km of main roads;

1) a tour-year (FY1990-93) progrwn of rerrfackV of about 404 bla ofmahi roads

1) a four-year (FY1990-93) prograr of routhie maftenance of the enUrenetwork of mahi roads (840 bn) and motorways (2? Im);

Iv) traffic managa.net

v) veNce safety and emblson controa, and

VI) crwitancy swervio and tralnig.

3.03 The proposed progan consists of strengthmnr and hprovenent of about 108kno (Anrex 1) of main roads to paved standards (Amex II). TN* progran contues theproceso started wnder the FMst HJays Project (Loan 2337-4AAS) where 75 Ion of main roadshave boen successfuly strengthened and ipWoved . The design of the works has been andconthiues to be the siujct of c*,pehe*Nsve studkes Under a Project Preparation Faclty(PPF) (Advance No P 123-4AS), French and Governent r lnandIna confstants have carled outfIasity Stes for strengl2erIng and kImroventr of 80 Ion of main roads. From thesestuckes 69 Ion were found econicaly y AmsUfked Consuttants wl soon be chosen for thefeastilty study and poesble detaled engieering for strengtherig and hivovement of theremabnig 39 Ion of mahi roads.

- 12 -

3.04 These roads had been progreessvely nproved trom agricultwral tracks butwithout proper desig and conatucto Thr weak stncture and goometry can no longehandxe the Increasingly heavy and hI volune of traffic wIhk varies from 700 VPD to 3000VPD. Road maintenance operatlor can no klngs arrest ther deterioration The worksproposed conist of: (a) widern*g roadays, (b) bWpoving aNgmonts and grades; (c) iprovhnhIlersectiont, (d) providing shoulders of 1.5 m in nrral areas, and sidaoiaks of 1.5 m in urbanareas, rlt of ways permitth; (e) provkb proper drainage systems; () carrying out waterand utility works win the rigits of way to prevent premature deterioraton; (g) rebuldingsome subgrades; (h) constructing now base corses of crushed rocks or asphaKt treated localaol materials, (I) executig double surface treatment or asphaKt concrete wearin cousesand (h) proving pavemont markNgs, slgu and slgals. The den;gn Is based on a maxkmn legalshgle axle load of 10 tons for an economic life of 20 years. It i expcted that, uidersatisfactory mahtenance, resurfacig wi be needed after 7 to 8 year Detailed engerirAnd bidding documents have beon prepared for roads lndided in th Project (Arrex I andpara 4.01). Detailed engineering and biddkg dounents for the remahhng program wi beprepared when additInal fiancing Is acquired. The works wi be carried out by contractorsuwder the supervWi of corwultants.

Riafabg B=amu

3.05 Two successive studcs were carried out In 1985 and 1988 urder FAC fhiancigto dentify the maintenance needs of the networks of motorways (27 kn) and mah roads (840kIn). These studles kIentifed about 404 km of roads (Anex IVa) whic need resurfachg overthe next four fiscal years (FY1990-1993). These roads are of the same ciaracterIstics asthose descrbed above (para 3.04) and carry about 500 VPD to 19000 VPD. Currently, theyreceive some spotty routhe maintenance operation on an aninual basis. CoaeecAntly, thereIs an urgent need for general protection of these roads to avoid premature breakdowrL Theworks proposed cLsst of: (a) clearnig and repalrng drainage structures; (b) clearing andregravelNg of shouldrs; (c) patcho* and reeealng; (d) execution of double suracotreatments or asphalt concrete wearig courses; and (e) provkl,g pavement markigs, sWngand sigial. The frst tranche of 130 kms of heavily traveled roads (1 600 VPD and above)have been hcuded under the Project (Annex lVb). Durin the appraisal mssion It was ageedthat the resurfacing program wi be updated annually dlrig the execution of the proposedProject In accordance with pavement and appurterioss condtior, volune of traffic andtraffic flow to alow costent circulation The resurfacing program would need an aunualbudgetary provbion of .R 50 ffmlWon dmIng the four-year period, FY90-93. At present.provisin for these worKs Is nelgble (para 3.08). The Tecrical Departmen of MOW wINprepare bIddIng docunents and supervise execution of these works Mid wW be carred outby private contractors.

3.06 Cora.uItancy studes have also been carried out for Identifyin routiemaintenance requirements of the entire network of motorways (27 kn) and main roads (840bin) over the next four fiscal years (FY1990-1993). Routne maintenance operation wi

- 13 -

consist of: (a) ckulrng of shoutiders; (b) cleaning and repaiing of dtchse and clverts; (C)fting of pothoue; (d) nmnor repaes and painting of brldpgs (e) patchtg and resealrg and (f)renewin4 pavement markins and repaiVng trafflc sqgn and elgnaNL

3.07 Patching and reseaing operatkxos wI be carried out by force accoun.L TheseoWeratkins w be carried out by brigdes two In each of the three tenitorial sectkons (para.2.08). Force account operatkxis consisti of clarin of shoulders clearing and repairinof dtche and culverts, roefng of potholes, mhior repairs and pantiog of brt s renewingpavement markhis and repairV traffic sigs and sigals wE be caried out by nmxodoq.fent and labor maitenance brigades, two In ach dstrict or oehteon In total (piira.2.08).

3.08 To s4pport tte operatkmns, the proposed Program wI provkie eqoxnentmaterlals and supple - (Anrexes V (a) and (b). Amrual fundki requirements for routinemaintenance operations are esthnated at MuR 15 (US$1.0) mlion for FY90-91 and MuR 24 (US$1.6) mllion for FY92-93. At present, If works are properly classfied, actual expendture forroutine maintenance amounts to approxlmately MuR 13 (USS0.9) millin (currently, allocation forperodce maintenance under budget category "other roads work has prinarily been used forroutine maintenance work).

3.09 The Program for routie maitenance Is deolied to buld sufficient capacitywlth the MOW to fully carry out maintenance operation on the total network under ttsurisdction (840 km of main roads and 27 km of motorways) and to take on addKtlonal

maintenance operatons when called upon to do so on an emergency basis.

3.10 MOW ha3 recently reorganlzec Its road maintenace operatior by separathgmaintenance works of roads from bulins (paa 2.08). Lnder the new set-up execution ofroad maiterance works has been decentralzed with appropriate delgation of powers so thatworks can be carred out more effectively. In addton, the mechanical workshop is bengreorganized based on reomindatlons of a rcentUy completed organization study carried outby Governent officials wth the support of consultant. The reotbedations of tNh reporthave been accepted, In prhdpe, by the Goverrment.

Traff Marugmw*

3.11 To Wyp-ove the circulation system and control traYfic and axle loads to preventpremture deterioration of the road system, a frst phase of traffic management was htlatedand sucessfully executed under the First HIways Project wtth the acquybKlon ofwelghridge& Ths development was supported by the Saudl Fund for Development under theUrban Rehabilitation and Development Project (LrL 1926-4AS) wtch hcuded the istallation ofsigs and sgnals at major IntersectV-ns, pavement markigs, nprovement of maJorintersections, and acqilstlon of appropriate equdrent In addition, bus termnals, brides andmajor intersectios have also been Improved using local funds.

3.12 The second phase of Traffic Management h?provements is inchuded under theproposed ProgramL These Inchude (Amnex V): (a) hprovement of intersectiorn, (b) hip-ovementto Sir Seewoosagur Ramgoolam Street (SSR) In Port Louis; (c) provson of loop detectors; (d)addtional traffic lohts; (e) street llghting and (f) speed check eQA unent

- 14 -

3.13 It was agre1 that the Tedwical Departmen (TD) of te MOW wI conte roadsafety cipaIo t Uated wdor te FMt H0ays Project and pepare an Action Progrn townre effective trafflc control kichd (a) review and udetkng of al medwmca safetydvces to be b corporated I the vhice fleot, (b) review and udethl th Road Traffic Act,as nrecoeay, based on (a) above and (c) bplmentation of the Action Progwa.rrs actionprogrf wI be presented *o the Bauk for review not later n Deouwr 31, 1991.

3.14 In conjunction wit the strengenO , and hyrovemmnt of the road systs andtraffk management, the mechanical and en control of the vehdlo flet Is considered asan frltgal part In the deveopmt of the road transport wystem and protection of theenrwra- t This task was htUated under the FMt Hkways Project wtth the construction of

second veNdcle kpctlon center at Forest Slko

3.15 The proposed Program hdukido addUtonal reqrements Idented by the NationalTransport Authority (NTA). These hchdo (Anex Vb) provison of vehibe eesio-n mai.torodevies, brakes, headVt and front and aUgMnt testhV eoi4xnt. An Action Progran wbe prepared by NTA to mniotor amblent ai quaUty to determne the huct of vehlcle eNeskonon the qualty of ar and to estableh vehicle embison standardL The Progra wI hcudeservices of a tedrical expert to asst NTA hI the Identification and procurement ofeqtpent for monitorrg of air qallty, vehice emssion testhg and fotmulatlon of vehiceemisson standardL The Actor, Program wI be sutted to the Bank for review not laterthan December 31, 1991.

rnmitwrv Sarvi a

3.16 A PPF of US s 410,000 (Advance No. P-1 23-MAS) was used for Corulutantsf.asoty study and detaled *ngiewii for strenthr and Improvement of the projectroadg. induded hk the Project (para. 4.05) is the provdon for refoincwV th PPF.Carwiltants serie wi be needed to fwt. x th -exotn cf the strenrhni an dimpovement program

3.17 A total of 75 man-monthe of tdchnlcal asssance servc are envisaged tathe mpiementation of the Program This ciade (a) 30 manw-omnths for resrfacing wokcs; (b)24 man-onthe for routine mahitenanc; (c) 6 man-monthe for traffic management; and (d) 15man-months for vehicle safety and sNeslon controL Conulants terms of reference (knexVIl) were dscusead and agread at negotiatio

3.18 Wlth te hicreaekg voaium of works and the need for moderrtatlon ofpavement managemwt, develpment of lunan resources Is of prnary *vxrtance for MaurMus;this would involve tecdtnogy transfer at management level, imroved knowiedge of the stateof *ie art at the mid-Se level and on-the-job trahing at tne level of teo ansfn and skiledworkers. The trahing program wi, therefore, hdude short course organized by theUnivk*ty af MauKtts for middb managwent level persornl and on-the-lob trahing undertecnnical assstance for tedcnidans ard skilled workers It was agreed that the this boundtrahing program coverhg the period 1991-93 wI be made avaable to the Baink by March 31,

- 1S -

1990. The 4overwn wI albo make avalable fe*ows, study tours, an; ;'W*w forsenr management ealsta

C. Pmgnm CtEt~mudP

3.19 The total cost of the Progran hichud cntkiwgl is estknated at US S107.1 mon, with a forel exchange Ctqonent of US S 63.5 inVo or 59% of the Programcost. Taxes and dutles are estknated at US S 14.0 no. Program base Costs are hI Ae1989 prices Physical oortkiees of 10% have ben added, and pris contkiees arebased on estkated hnfatton rate as folows 7.2% hi 1989-90 and 4.4% hI 1991-1993 forforegi, and 9% hI 1990, 6% hi 1991, and 5% hI 1992-93 for local Detaled cost estknatesare shown below (Table J.1).

- 16 -

Tsbl. 3.1

MAURITIUS

1990-93 Highway Program Cost Estim&.sa--------------------------------------

( USI million) ForeignAs X of

Lccal 1/ Foreign Total Total

(i) Strongthening and Improv.m.nt 17.67 32.83 S0.60 OF_____________________________

(100 km)

(Hi) Resurfacing Program (404 km) 5.46 16.14 15.86 66

(ii) Routine Vaintenance Program________ __________________

(a) Equipwsnt 0*24 1.36 1.66 8C(b) Operating Cost 3.30 2.76 S."6 46(c) Personnel 8.62 6.e9 8.82 e

--------- --------- ~~~~~. ---- - -

Sub-Total 12.16 4.66 16.22

(iv) TraPfic Managemont 0.22 1.28 1.560 86__________________

(v) Vohiclo Emission Contro; 6.o7 0.38 0.46 86________________________

(vi) Consultant Servicoe_ __ ________ __________

(a) Preparation of (i) 2/ o.6e o.A 0.46 lOW(b) Supervision of (i) 6.36 2.73 3.63 9e(c) Technical Assistance 6.63 0.72 6.86 9s(d) Training 0.67 0.63 6.16 30

Sub-Total 0.46 3.88 4.33 90

TOTAL BASE COST 36.63 62.67 88.6 6t

ContingenciesPhysical 6.8 5.22 3.32 biPrice 3.6 .74 9.76 s9

Sub-Total 7.66 16.96 18.52 69

TOTAL COST 43.69 63.63 107.12 69…_=_= ==__= =2=2==

1/ Including taxes estimated at USIt4 million2/ PPF Advance No.P-123-MAS

- 17 -

3.20 The costa (exdudhg cnthgenie) of works for strengerg aNd hWovMentare estMkted at USS500,000AR the hducds the nressay water and utnty worksestakted at 20% of te costs to prevnt preatre deterioration of the roads Rearfacinwors cost about US$37,000/IaL Coult srvice for 4rvlson are estinated at 6% ofthe cost of work. The operat Cost of the routine mahtnance has been etkated at USS1.0 nEon (R 1 5.0 mlon) for FY90 and FY91 and US$1.6 nEon (Ru 24.0 nmon) for FY92 andFY93. Thae compare to an average of US$l .0 mon (Rs 15.0 nMon) provided amAaly In FY87 to 89. The man-4month cost of techrcal assistance servke stknted at US$10,000inc sda US $ 8,000 for salaries and ovetead (hone office e_enes, expatriate aloance,social cost and other ezpenulres) and US$2,000 for r dkbursable exense (travelteorntuurcatloe houses and othernisceiarou Items); thes costs kicAdn those ofequeT, materals and uApp are based on curent prces prevailing In the country fororgoin works and serices In the cotry.

3.21 The Goverriwnt inteds to seek finncin fron varius blateral and nulteralfuna1g agercies to fnance the cost of the proposed Program Finncing for patchngoequ4nant nd for techrical assistance (24 manrronthe) for routihe maitenance Is beingprovkied by France; wder the Austraan aid prograem Govennment Is procurng brake testngeqL4nent for the mecharncal worksetope twelve routre maintenance trucks are being provkiodunCer a anina hke of creat in addtn, prioiy elements of the Program inIuded in theproject described below wl be financed by the Govenrnent and the World Bark.

D. E t1111 ot R 1

3.22 In addtion to the project benefts dussed in Chapter V, auppamentaryfeasbtIy studos for strengtherg and Mrovement of the folowkV roade hclude in the1 990-93 H 4 ay Program were examined

(a) P o to Grand Bale (18 kmn);

(b) Constuction of a crawler lane aln Ml from PaNles toMt. Ory ,Iton (4.5 km);

(c) Lhk Road to Rose HU (. Sim)

(d) Port Louis - St jen Road A1 (4 bn)

(e) Port Louis - Central Flacq Road A2 ( 3 ion)

These studes were reviewed by the appraisal nVsson and margtal sub-projects were eterrefonwuated or postpored as a result of the review. For hstance, serengteni of roads_ction from Puplmouse alng A5 was found eoonomIcaL However, the justIfIcatlon of thebrand new Ink to Grand Bale has not been separately establWed and should be examinedaln wth other alternatives such as hImroved maitenance of existIng lks. Sblarly, thecrawler lane should be constructed In stages with thhner structure to start with and

- 18 -

dePmno on the traffic growth the structL could be strensthened I stages We timoresrfaackg and draiage works for the urtan section Al and A2 are fully ,itfie wk*tof thoes roads hould be postpornd ariu 'ietter trafflc manaugnent approaches houd beadopted to red" traffic oongetion Consequen, the 1990093 road str engtI andhIprovermnt progn (ArSox 1) hlCd a" econmicaly wt ld carpont at this stay.For the rwnahhg 39 km c.. roads (see Aruex 1), consultants ar expected to be appofted*hrty to undertake mngieri studes. However, g0ven that thV presnt corition of theseroads and the beve of traffic (para 3.08) are sbilar to the roads kcaded under the Project,pref*ary analysis suggests that the proe vestoIent hI wtrengthurnig theoe road wouldbe eonomilcy viabbl TN. prqgram wI be reviwod ron t*ne to tkne and red based onupeated hformatkn

3.23 The resurfachig procgrn cornisting of 404 kIo of roads were based onfeasbilty study carried out by consultants. The roads hcld hI the 1990-93 progran(Armex IVa) would have traffic Intensity betwen 500 to 1600 vpd. Even a conservativeestkate based on the feasblty study hkicates a mnhhi rate of roturn o' 15 percentis economicaly viabl

3.24 Detald economic analysis of the proposed Project a presented I CaWter V.

- 19 -

IV. THLE EI

A. Prr C

4.01 4.01 The Project woula AMd N prlorty Ite of the 1990-93 HlVayProgram and would cowtst of: (I) strerigthenig and hpro.ement of about 45 bn of mainroad (Amexes I and II), (9) reuLrfachg of 130 km (Amex IV b); (M) equdpoent for routhematenance operatbno (tv) trafflc management; (v) vehicl safety and emision control;and (vA) cor nit services and trainlr. The total cost of the Project kichngcontirgenci IS estknated at US S 43.5 ilon, wtth a foresi excange conponent ofUS S 30.0 muimn or 69% Taxes and ckitl are estkinated at US S 5.4 rillorn Detailedproject conponent, breakdown of costs and fhancng are shown In Table 4.1 below.

- 20 -

Table 4.1

MAURITIUS

SECOND HIGHWAYS PROJECT

PROJECT COST ESTIMATES AND FINANCING PLAN(US$ Million)

FOREIGNAS X Of

TOTAL LOCAL1 FOREIGN TOTAL TOTAL

1) Strangthaning and ILprovement (45 km) 8.19 16.56 23.69 86.0eii) Resurfacing Program (139 km) 2.48 4.70 7.18 O6."9ili) Routine Maintenance Program

Equipment 6.16 6.86 1.16 15.6e

iv) Traffic Management 0.29 1.36 1." 67.66v) Vehicle Emission Control 6.64 6.26 6.36 57.66vi) Conoultant Services

(a) Preparation of (i) 2 6.66 6.46 6.46 166.66(b) Supervision of (i) 6.12 1.86 1.42 96.06(e) Technical Assistance e.o6 6.46 6.51 96.66(d) Training 6.67 e.63 6.16 3a.66

Subtotal: 0.24 2.19 2.43 96.ee

TOTAL BASE COST: 11.36 24.66 3a.16 69.oe

Contingoncies

(a) Physical 1.69 2.46 8.67 69.66(b) Priea 1.21 2.72 3.98 69.66

Subtotal: 2.36 5.26 7.5 69. 6.

TOTAL COST: 13.6 36.66 43.66 66.66

FINANCINGAS X

FINANCING OF TOTAL

IBRO 6.oe ao.66 go.ee 69.66

Government 13.66 - 13.66 81.66

TOTAL COST: 18.9 36.66 43.69 166.66

Including taxes estimated at USS 5.4 million

2 PPF Advance No. P-1Z3-MAS

- 21 -

B , _

4.02 The Project wg be krplwment.d by MOW ttrough ts Teourkl Departent (TD).The expected 3neenVttion sched a for major actItles of ach Project oonvorwn wasageod with the Goverrnen. The Projet covers a for-yer peWiod, starting Ay 1989.The strengthening and rirovalint of mahi roads wI start h Jamary 1990 and takeapproxhnately ttree years to ccmplete. Reowfachg works wE start hI January 1991 andtake approxknately two and a half years to conmpete. EqWpment for road maintenance,traffic and fission contro should be delivered by -Aly 1990, about six mnKhe afternotilcation of contr4ts to supprs Conhuftancy ervices for tecvIcal assstance tothe TD, and for uwervision of major civi works wi be provided ir*g Project executionThe Project. I expected to be conpeted by Juno 1993 (see Chart 11 - ProjethObmentatlon Schedle). The Govemnent wg take all egal and adiVstratlve stepsrequred to enrre accees to the road reserve and other land reqred for the Project

4.03 Procurement arrangements are sunmartzed below hI Table 4.2

- 22 -

Table 4.2

Mauritius

S 2cond Hi9 hways Prj-ctFY1990-1993

Procur - ntrAroinemeontc(USS million)

Procurec.nt. Method 1/

Proruroment Element ICe LCB OTHER TOTAL

Civil Work 29.8 2.S 31.3(17.G) (1.6) (19.1)

Road :quipment 1.2 1.2(1.6) (1.6)

Traffic A Emission Eqpt. 2.2 2.2(1.9) (1.9)

Materials a Supplies 6.e 6.0(6.1) (6.1)

Consulting Services 2.6 2.6(2.6) (2.6)

A Training 2/

PPF 0.4 6.4(6.4) (6.4)

TOTAL 37.0 3.7 2.9 43.6(24.6) (2.6) (2.9) (36.6)

i/ Figur-o in parenthesoo are amount financed by IBRD.

2/ IBRD Guidelines (August 1981).

- 23 -

4.04 Data used in the preparation of the ProJect and source material and studiesare Usted In Ar6ex VIII.

4.05 CM works for strenghn and Improvement and resurfacng of main roadsethkated to cost about US$28.8 mUlon will be carried out by contractors on the basis ofInternational ooeUtlve bddng (ICS) In accordance with the 1985 Bani Group Guiensafter suttable preqiailficaton. Pwes and fIttgs for water works estkmated to cost aboutUSS$60 million and traffic management and vehicle safety and emssion control equlpmentestUmated to cost about US$2.2 milon wil be procured tlrough ICB. Equment for roadmaintenance estknated to cost about USS1.2 mlon wI be procured tIrough LocalCompetltve akdng (LCS) shce there are a rurba of local suppirs who have after salesservtce and spare parts factikes. Relatively smaHl contracts for resurfacin worksQoogaphalay dispersd and spaced In tke with hdvkual contract averagng USS500,000,up to an aggregate amount not to exceed USS2.5 rrilUon will be carried out under LCBproceckres, advertised locally and subject to the fo4lowrg (I) bids are opened In public;(11) evaluatlon citerla are explicit; (Ill) award Is made to the lowest evaLated bidder; and(iv) forelgn contractors are not excluded from partlc*atg In the bidding Consultantsfor supervision and techrical assistance will be selected following the 1981 Bank GroupGulidelies. IBRD's prior review of invttation to bid, proposed awards and final contractswlN be Ihlkted to contracts estbnated to cost US$200,000 equlvabnt or more. Theseunderstandings were reached with the Govermnent at negotlatins.

C. D WoKaMIin

4.06 The prco,psed IBRO loan of US$30.0 rrillion would be di:sursed on the followinbasis:

(a) 65 per(.nt of total exDenditures for civH works for the strengthenhgand h provement and resurfacin of maih roads;

(b) 100 percent of total expenditures for consultancy services, tedhlcalassistance and training;

(c) 100 percent of foreign expendltures and 85 percent of localexpenditures for equlpmlent materials and supplies; and

(d) re#btursement of the PPF advance.

4.07 Al dibursewents will be fully docunented except for payments agahstcontracts vakued at less than US$25,000 eq.Ivalent which would be dibursed on the basisof statements of expenditures (SOE). To the extent posstile, aN wtthdrawal applicationsshould be aggregated to not less than US$25,000. Supportig docunrents for amountswlthdrawn on the basis of SOEs would be hed In a central location, and made avallable forreview by auditors and vWtin Bark missions

- 24 -

Estkwted Sda.ine o D_trauifts(U$000)

CuMLsatlvoBark Group Fiscal Year DbursenwAICure atc End of

w90

Mardc 31, 1990 400June 30, 1990 1,100

Sept. 30, 1 990 1,900Dec. 31, 1990 2,600March 31, 1991 3,300June 30, 1991 4,400

i922

Sept 30, 1991 5,500Dec. 31, 1991 6,600Mardc 31, 1992 7,700Sune 30, 1992 8,800

Sept 30, 1992 9,900Dec. 31, 1992 11,000Mardi 31, 1993 12,100June 30, 1993 12,600

i19A

Sept. 30, 1993 13,200Dec. 31, 1993 13,800March 31, 1994 14,400June 30, 1994 30,000

Clo"hg Oate Anmo 30, 1994

- 25

0DA~mt. Aiting ml maet ROM*rm,¶r"

4.08 ProJect accounts wI be maintahed by the Fhance Section of the MOW withseparate accounts for each onom ent and wu be avallable for kupectlon by Banksupervlson misskos The MOW's accounts are audited regWarny by Govemnent audtorsunder the Swpervln of the Director of Audt who subts hNs report to the ParUamentAl project accounts wl be audted by the Drector of Audit aocordng to generalyaccepted acoountng proceduros and Govemnent wil su.t certifed copies of suchaccounts and armual Audt Reports to the Bark not later than six months after the end ofeach fiscal year.

4.09 Every fiscal year, concurrently wtth the preparation of the annual budget, MOWwIl prepate a progress report of tne precedng year and a detaled road maintenance workprogram for the folowin year, takng into consideration the overall maintenance targetsset for the Program period and Ikely budgetary allocatons. Thb program wNI desacIbe thetype of actMvtes to be carried out by contractors and by each force account brlgade;hdicate the estkmated output of the brigades by major activity and the correspondngk'uts requared in terme of perborvie and equlPrent eqJOnent utilization, fuel andlubricants, materials, supplies and spare parts. Progres reports for the precedng yearand subsequwet amual work proramns wI be furrnlhed to the Bank by Decenber 31 ofeach year and wI be ftnailzed upon determnatlon of the finl budget takng Intoconsideration IBRD coanents.

4.10 The Borrower will prepare a Project Completion Report (PCR) to be submltted toOBRD not later than six (6) months after the cosin date of the Loan.

.~~~~~~~~~~E Erkrm" et

4.11 None of the Project's components wi adversely affect the environenthIproverent, resurfacing and routhe maitenance works wI folow the existing allmentand wI have little or no effect on current land use. Improverent of drainage structumreswI kwp-ove sasitatlon and health. The strengtheni and hmprovement of maintenanceoperations, coupled with the hpmentatlon of traffic managemen, vehile risslon control,wI conskderably hiprove road safety and ai quallty on the island.

F. Poverty Aviat

4.12 By rpwovhg road condition, and makig markets for agAcultural productsmore aceseble, the Project wI have a beneficial kpact on the rural poor through hlgerfarm gate price and lower prices for hputs and consuner goods. Shoe cost effectiveroutne maintenance is undertaken over the entire road network, the Project would utilizethe avaHlable manpower, thus contrlbAtng to poverty alleviation and fostering foodsecurity.

- 26 -

V. Ewwrwuic Evakiatin

A. 90

5.01 The major Interest of Maurltkus' Pub'lc Sector hnvestment Program (FY 1988-1990) Is to preserve the past and existng investments In the economy, hinrove prodctvityand increase operational efficiency. For the road subsector this translates Into rehabilitationand bWroved maintenance cf the prcxa! arteres with heavy traffic density. MaurltkLsattaches a very high priority to the b,povement of Is extemal trade routes (para 1.02).The growth of motor vehicle traffic on the prklary hligway network of Maurftkis has broughtinto sharp focus the hadequacies of many road section where deslgn standards aredefient and the accident toll . heavy (Tab'e 20). The proposed Project would addressthmse core problems by selectvely strengtherg and hprovhg bportant road sectons basedon sound economic consdkerations. Furtheriore, the proposed Project would also address theneeds of the MWistry of Works with respect to bTvrovN Its capacity for road malntenanceand traffic management HLunan resource development in the transport sector wMI be anin.egal part of the Project

5.02 The mportant oc:miodtles that would be affected by the knproved roads areagrIcultural produce especially sugar, construction materials hdiudhg cement, fruIts andvogetabls, petroeun products, hdustrial raw materials and hport/export of general cargo.b¶proved road cornections would also stkumate tourism dvslopment. The ultkmatebenefiaries of the proposed Project would be rnad users who, due to the diversity oftraffic using the road network, come from a wide range of sectors and Icome groups.Because trarnport enterprises are coroettive, It Is expected that the benefits which wouldIitialy accrue to the transport users would be gradually passed on to the economy inneral.

IL Pro t Costs and Bunt its

5.03 The economic evaluation of the dfferent subpro,ects is based on the feastiltystudis and economc analyses unidertaken by the consultants unlder the aegis of the Mnistryof Works. These studies were reviewed and dicussed with the concerned agencies andmargnal sub-projects were either reformulated or postponed as a result of the review.

5.04 The traffic projections for the different sub-projects are based on pasttraffic trends, gasoline and dise consumptlon profie (Table 21) and planred hcreases Inproduction and conourmtlon In the zones of infmace. Since no generated/hiduced traffic Isanticpated to develop on the Project roads (the roads have been paved for decades), theexpected traffic growth takes Into account nomal traffic growth only.

5.05 For calculatng the econoxic benefts and costs. internatonal prices have beenused for rported equiprnent, materlals and other tradeable commoditles. Land and other non-tradeable Items ke aggegates, skilled and unskilled construction labor have been valued atlocal prices. Economic costs net of taxes were estknated for aHl investrrmit costs,maintenance costs and operation costs.

5.06 The quantitaUve economic analysis of the Project road sectons takes accountof savigs In vehicle operatng eosts, passenger travel tknes and road maintenance costs.For bushess journeys made wlthn the Mkence area of the Project roads, ttne savh9s were

- 27 -

vakied at 1.1x average hourly wage rate to take account of overhead oosta. The value oftie tor rxnon,4use tro was given a corwervative estkato of 1/4 x average hourty wagerate. Quantlfled benefits dLse 4o the proposed Project would result makVy (about 80%) fromavokded extra htway maintenance coets and redAced vehdcle operathg costs. eneftts deto icreased comforto convenlence and safety have not be taken into accowit.

5.07 The projected traffic volumee Imply annual growth rates in the range of 2% to101. These rates are wed below those that occurred in the Project road segnents durkg theperod 1985-88. The present hlg growth rates have been assumned to taper-off sigflcantlyfrom 10% per arnma for cars and vans durig 1988-90 to 7% per arun durng 1991-95 andfurther down to 5X per arn dLrfg 1996-2011 wtth the Wloy slwdown In the growth of theeorany In the futiLe. Medilun trucks, heavy trucks and buses are expected to grow atslower rates (Anex 11) over the economk lHe of the road works. The state andcawractersUtcs of the exstin l*s whlch are to be strengthened and rehabilitated by theproposed Project and estsmated cost-benefit strearm are descrbed briefly In Amex 11.

C. E_i: Return _FR) nd Se_fttv

5.08 Based on the most probable estkmates of constructin, eqW.nent andmaitenance costs, the proposed Investments on cifferent Project conVonents produceeconomic return (ERs) rangn from 21% to 50% (table 5.1). Al investnents would yild fstyear beneft ratio (FYR) of 1^% or more. The welted average ER of al cliv works andeqummwnt components, which account for about 93% of total Project costs Is 28%. If theresurf achg program of high traffic density roads were not ndertaken, vehcle operathgcosts on the progresslvely deterioratig pavements would Inrease and those hNway sectionswhch would fall prematurely would require corplete recaostruction at a cost relaUvely hiWrthan that of an hyedate ovlay. Repacement and modenmzation of low efficiency littedcapacity road machhery wiN upgrade MOW's -.aintenance capaciy and reduce road maintenancecosts Tecifdcally advanced fied testin and laboratory equomnt are primarily desigred toirove traffic operation., pavement managaot and quallty control on maintenance

operatons of the entire pubic road networks. The above ERs urderstate the ful benefits ofthe Project by excludhg benefts due to icreased traffic safety, qualty of servie andconvenIence of travelers on the hrroved facitie. Sentvtty analyses were carried out totest the effect of variation In construction and eQpment costs and users' benefits on theabove estmatea. Even under the Lnfavorabe assm¶ption of 15% Ngerconstruction/equipment costs, confi'ed with a 15% redction In uers' benefits, the ER'sremain acceptable withti the range of 15% to 34% with an overal wgdited ER of 21%.

5.09 The tranhg and tedhical assstance conponent of the proposed program andthe vehicle emssIon control coTuponent whose benefts could not be quantled are consideredas an integal part of the Project to upgrade the management and operations of thetransport sector hdckig krovement of the envirorinert and whose benoefts would permeatethe entire economy.

Tablo S.1: F1 onamic Returns fR'n) - First Y'r Return (FYR) and Sonsltivlt3i Amil.l

Sensitivitv Analvysof total Expocted Lower J/ Higher / Expected

Project Componento Investments ER Estimate Estimnte FYR's

A. Highway Section

(i) Black River Road a8 21 16 27 12(A3 - 27.9 km')

(ii) Saint Jean Road 7 as 22 as 16(AS - 2.1 kim)

(iii) Pal-m Road 17 22 16 23 1l

(iv) Flic and Floc Road ti 24 17 14

(v) Resurfacing Program (19 kim) 18 6t 84 67 28

(vi) Road MaintenanceA Traffic Management 7 22 16 28 12 ce

S. Resurfacing Progrm (1U klo) 18 so 34 67 23

C. Road Maintenance 7 - - _ _

106 weighted 28 21 36 17average

Source; Feasibility Studies and Economic Analysis (BCEOII) and mission *sti-,tes (Nov. 1988).

/ Assum 16X increase in construction costs combined with 16X decrease in benofits.

2/ Assuws 1 decrease ;n construction costw combined with 161 increase in benefits.

- 29 -

D. Fm R

5.10 The proposed Project sMports h1ig priorIty hweetnents based on theGovemrnnt's FY88-90 Development plan and Ks 1990-93 H4uay Program The econaricjustification of tOe proposed Projct convonwnt has ben we establhhed even underunfavorable hypothse cooer*g project cost and uss befi (para 5.08). Thetedvncal sokAtion adopted are based on adequate wnoeetI and tedvlcal studes. Thepossity of same delays We to dffufee km takkN actual pos_ession of land aong theroads to provide adeWate drahage facltis and foot-path fn-t occur. owever, littleaddional lId is Nkely to be needed for the Project, as most of the land requirements arealready part of the Govenwent's road rserve. Risks from haId3qLate Project vtbmentatlonalso seem mktna as the physical oovponewts of the Project are esenaly a folow-Jp of theorngohg Hhvway Project

- 30 -

VL a.wt adIwiRrm tk

6.01 The followhg principal tten were daussed and agreed upon wtth the Govemnentdurhg ngotIationr:

(I) tUmey and adewate prov*lon of fund for road makitenance (para 2.14);

(11) araual mahntenanme program wW be prepared and submitted to the Barikfor reviow (para. 4.C9);

(Ill) action program wil be prepared by NTA to mordtor antbient air quaNty and toestablish vehkcle emisson standards. This program wil be submntt'd to the Bankfor review by December 31, 1991 (para 3.15);

(Iv) Tectvycal Department (TO) of the MOW will prepare i ctl-n program to ensLreeffective traffic contrd. This program wil be presented to the Bank not laterthan December 31, 1991 for review (para. 3.13); and

(v) a time-bound trahng program for the perod FY91-93 wUI be preparea andsubmitted to the Bark by March 31, 1990 (para. 3.18).

6.02 Fo4lowing agreement on the above condrtior, the prooosed Projet quallfes fora loan of USS 30 nillion on IBRO term with 17 years maturity and 5 years grace.

- 31 -

MAURITIUSSICOND HIOIWNYS PROJECT

ROAD STRINCTEINING AND IXPROVUIENT

ROAD LENGTH COST(H. USS)

_.X.._.......... -------------------------------------

(CU4UL) (C UML)

1. A3 Black Rivor Rd. (Lot 1)1/ 27.9 27.9 12.93 12.93

2. AS Saint Joan Rd. (Lot 2)1/ 2.1 30.0 2.51 15.43

3. Palma Rd. (Lot 2)1/ 8.7 3d.7 6.30 21.74

4. Flic an Flac Rd. (Lot 2)1/ 6.5 45.2 1.93 23.69

5. 31 Le Reduit Rd. -

Ml Moka (Lot 3)2/ 3.0 48.2 1.57 25.26

6. Link Rome Hill (51) -

Ml (Lot 3)2i 0.5 48.7 0.46 25.72

7. A7 Moka -

Providence (S 27) (Lot 3)2/ 13.5 62.2 7.07 32.79

8. B3 Candos - Vacoas (Lot 3)2k 4.0 66.2 2.10 34.89

9. A7 Providence (527) - flacq (323)

(Lot 4)2/ 19.0 85.2 9.95 44.84

10. Cravler Lane Along Notorway K23/ 4.6 89.8 1.73 46.57

11. Link Pamplemouse - Grand I&4*3/ 18.0 107.8 3.88 50.45

1/ Roads selected to be executed under the Project.2/ Roads under study.3/ Feasibility studies completed. Detailed engineering to be carried out.

- 32 -

Page 1 of 4

Sait D§t of EWMMG Evhkmum

A. Rad seetm

1. A3 BlAck Rtve Road (28 Km) - Thb road section rikcs Al (Royal Road' toBlack River and provwides an hiportant conoctlon between Port Louls and the hllypopovated district of Plain Wihemi to the scuthwest part of the Island. The wdtth of theroad Is varyin between 6.25 m and 7.40 m. The drahage In some section Is tadequate.About 2,000 veNcies, 300 of wtkh were heavy vehicles, were usig this section in 1988.It Is stkhated that traffic on this section wIl hicrease by aIout 8% to 10% per yearduring 1989-90 and 4% to 7% per year during 1991-95 and thereafter increase at therate of 2% to 3% per year up to 2,011, approxknately the econonic life of the kTvrovedproJect sectlon. The road crosses urban, semi-urban and rural areas and passes throughIridustrIal areas and sugarcane fleids.

2. A8 Saint Jean Road (2.0 km) - This Is the main road through Quatre Bomes.Its width is about 7.40 m and shoukJers do exist. In 1988, the cverage daily trafficvoume was about 14,500 vehicles, of which about 1,300 was heavy comr.arclal veNices.Traffic Is further expected to grow between 5% and 10% per anrum for cars and pick-upvans and between 2% to 6% per anumi for buses and trucks over the next 25 years.Heavy passenger traffic Is a dominant feature of the road sectlon. hkrovement of thetraffic flow in Saint Jean roundabout and strengthening of pavement are urgent.

3. a2 Pabna Road (9 km) - This section links the Plalne Wihems district to BlackRiver road and c osses the urban area of Pakna. Except on a small stretch nside theurban area, there is no foot-paths and klntudinal drahage Is ver> Inadequate. Asnunerous pedestrians wak al the road in and around the urban area, the existig roadcharacteristics pose serious traffic hazarud The width of the road varies between 6.40and 7.40 m. In 1988 on the average about 3,300 vehicbs were operathg on this sectionAbout 1,000 of this traffic consisted of trucks, heavy trucks, trailers and buses. Trafflcalong tNs section Is expected to grow at an arnual rate of 5% to 8% for cars and pick-up vans and 2% to 6% for buses and trucks dhring the next 25 years.

4. Fllc en Flac Road (7 km) - This section inks A3, near )Jnctlon of Pabna roadto the coastal village of Flic and Flac. The first part of the road crosses sugarcanefields. The Influence area of tHs road has considerable potential for development oftourlsmr In 1988 the average dally traffic volume was about 1,800 of which about 33%was commerclal vehices. Traffic on ths sction Is expected to grow betwoen 6% and 8%per year for cars and vans and betweon 2 and 5% per year for trucks and buses for thenext 25 years.

- 33 -

Arrex 11Page 2 of 4

9. E.~k~t _ ~Jufi bw

C'lvR Wors

5. Ak the roads are beNg nb,Jected to heavier axle loads, and In many caseslheavir traffic vokans than they were desld for, with consequent rapid pavemnt

* datenoration and the rk*ks of serious pavement fallures in future. Usually In such cases,two atwrnative courses of action are possble (a) applying an overlay as an Immediatestrergwnv procadure or (b) to cca-,-Aetely rocontruct those sWctlons aiter theY fall.Economic analysis was made on the basis that If thb overlays were not applied, vehicleoowatin costs on the przgressively deteriorathg pavement would hicrease, and thosehNghway sections which would fall prematurely would reqalre coplete reconstruction at acost relatively hIgher than that of an eimedlate overlay.

6. VehIce operatin costs (VOC) on the project road section have beenesthr.ated separately for each road, and for every year. takin into account the condt!onof road surface, the expected deterloration from clbnate and traffic, as well as themaintenance operation carried out on the roads. VOCs were calculated by consultants(OCEOM) usng hNhway deskn and maintenance standard model (HDM). Six typical vehiclegroups were selected (cars, pick-up vans, meC'isn trucks, heavy trucks, trailers andbusas) and unrt VOC savhgs based on wlth' and 'wlthoutn the project scenarios wereassessed Based on the cost/benelt streams (Table 11.1 attached) for each road sectionERs were estknated

P ad Resurfacing Prgam

7. AboLt 130 ki,i. of hg traffic density (1600 vehices per day and above)roads have been hcluded under the project Many of these roads are beig subjected toheavier axle loads, and In many cases heavier traffic vo&zres than they were designed for,with consequent raNd pavement deterioration and sixortened Itfe, and the risks of seriouspavement falures In future. Usually In such cases, two aternative courses of actlon areposstl3; ka) applyig an overlay as an rmmedlate measure to Wrove road standard or (b)to completely reconstruct those section after they fall. Economic analysis was macie onthe basis that If the overlays were not appled, these Nglway sections would fallprematurely and would rewikre substantially hlgher costs for complete reconstruction.

Road MaintenAnce Eauifnet and Traffic Managemnwt

8. The use of high efficiency road maintenance machiery Is becoming hicreasigyurgent to carry out the rewired Job on Nh vokue main roads wIthn a reasonable tkmeslot available for maintenarce of such roads. A substantlal proportion of the existinequipment Is of advanced age. The utilIzation of eQ.xment beyond Its useful lIfe Iscostly, for the cost of spare parts required grows with the age of the machines and

- 34 -Anrox If

Page 3 of 4

despite beet efforts avalablfty decreases. broved traffic management would reducetraffic hold u sW;flcantly on conorsted road sectioU Trafflc Nlts presently hstalledat dfferent ,ctio are not vetcle actuated but use fixed tkne sgial plans.Installation of koop detectors, In particular, would reducs traffic delays as green tkneduratlon would vary wtth demand of traffic. The benefts from suh project comporwtsare: Ca) redxtlon In road ma,tenance costs wtth ghur staff productivIty (b) decreaseof maFitenance cots of vehicle operatng on such roads and (c) hwease of speed ofvehicks resut In thdr better utlntlon due to redced holdp. The most cost-effective solution has been adopted based on the etknated ERs.

Table 2.1 Cost - Be nfit StreaoProj-ct Road Secti.a

(Million Rupees)

AB Black River Rd (27.9 K-) S;nt Jean Rd (2.1 K-) Palm Road (8.7 km.) Flic en Floc (0.5 kIm)

Benf.due to VOC, Benef.duo to VOC, Benef.due to VOC, Bn-f.due to VOC,

Incr.in Rd. Travel lime A Incr.in Rd. Travel Tie & Incr.;n Rd. Travel Ti._ A Incr.ln Rd. Travel Tie A

Yeor Cap.Cootu Rd.Recr.Costo Cap.Couts Rd.Rocr.Coute Cep.Coste Rd.Rocr.Cooto Cap.Coots Rd.Recr.Cocto

1968 1999

1996 1s6.se - 13.050 - 51.660 - 16.766

1991 166.86 - 13.650 - 61.660 - 16.766

1992 - 37.618 - 9.249 - 20.696 - 6.116

1993 - 41.602 - is.666 - 23.411 - 7.938

1994 - 46.40s - 12.133 - 26.721 - 16.196

1995 - 51.636 - 13.789 - 30.466 - 11.971

1996 - 66.848 - 16.317 - 33.328 - 12.040

1997 - 59.1e8 - 18.926 - 6.9868 - ia.ass

199l 2e.240 62.-62 2.402 18.616 - 36.940 - 13.765 L

19"9 - 67.664 - 21.618 6.787 88.744 - 14.846 U,

2 000 - 7e.154 - 28.484 - 40.182 - 14.943

2011 - 72.914 - 26.578 - 41.697 - 16.678

2612 - 76.b27 - 27.819 - 43.296 - 16.236

266 - 78.884 - 30.268 - 44.961 - 16.876

2eu4 - 82.647 - 32.9s9 - 46.691 - 17.478

2665 26.246 SS.312 2.402 36.178 16.198 48.484 - 18.118

266S - 92.381 - 89.827 - 68.169 4.387 18.760

2007 - 9s.648 - 43.242 - 66.242 - 21.19si

2666 - 98.896 - 46.927 - 67.484 - 22.167

26e0 - 162.876 - se.886 - 69.778 - 23.182

2616 - 166.964 - 63.667 - 62.186 - 24.239

2611 - 111.218 - 66.701 - 64.688 - 26.833

E.R 21X E.R. aex E.R. 22! E.R. 24|o-o

- 36 -ANNEX III

HAURITIUS

SECOND HIGHWAYS PROJECT

ROAD STRENGTHENING AND IMPROVEMENT PROGRAM

Design Standards

---------------------------------------------------------- __-----------

Parameters Design Speed40 km/h 60 km/h 80 km/h

--------------------------------------------------------------------- __

Horizontal curves radii in m:

- Min. desirable 100 240 425

- Absolute min. 40 120 240

Vertical curves radii in m:

- Min. desirable crest 1,300 3,000 10,000

- Absolute min. crest 500 1,300 3,000

- Absolute min. sag 700 1,500 2,200

Max. Grades 2 8 7 6

Min. sight distances in m:

- Stopping 40 80 120

-Passing 150 270 350

Shoulders and sidewalks widths in m 1.5 1.5 1.5

Roadways widths in m 7.4-6.4 7.4-6.4 7.4-6.4

Road crossfall (% Min.)(a) Roadway 2.5 2.5 2.5

(b) Shoulders 4.0 4.0 4.0

- 0C0

1~~~~~. 0. . ..-.....

- NO 0 a-- --- ----

- 38 -

(Wmz I t a a T_ I aim I 1 2l

19. 400 "1. P., uw.e - -i a i. 0 1s0 1o5.0 2 7 2 23012.000 Al Th.rO. %ts LLO.. 0 3.0 2 0 1.0 0.452 0. A2 2 7694.200 6U I.. Iu d 4.2 * 2 4 2 22 2 0 142 0.122 29213, 700 A2 Tlh ,.g Pe,% Lm. 4 0 4 0 4 0 2 2 0.410 0 l1 37 U2

8,600 64 St PuI 9lsd 5 0 0 s 0 292 0 118 0 115 35U23. 672 SW ff A.- I I I *6 0 a 0 062 0 002 3 753. NO0 No WX. 0 Ar_-h Fo 18 1 1J 1 0.040 0 00 37733.340 m A 0 r#is,*^.4.-, 10.7 10 7 10 7 42 a 0 2" 0 4 0413.300 AA a..d %,4 14 14 0 140 140 A45 05an 0U8 4U003,2.0 All vs.4*..sde4 9usd 2 4 2 4 2 4 5 2 0 062 0 092 4 6923,280 n73 L;,.. t-1..d A. 1 1 a 1.5 40,8 0.0o0 C 060 4 742,120 674 Allt. .il,.t 1-sd I I 4 I 4 4 1 C 002 002 * 4

8.120 375 msdv oed 5 2 3 2 a2 a 4 . 0120 a 12 49273,120 576 0 l n 4 2 42 4 2 95 0a12 0152 IN09O3 120 677 SdI r,. 544 0 a 0 C 6 70.5 0 051 C 051 5 113,000 20 9Red 73 02 c0 2 70 a 001oo 0c6 S1272,000 A2 Tl, ft - C.%..l Fl..q 21 1 21 1 21 1 1 I 0.02 C 512 5 on1, 70 S J*-. . * 2 4 2 4 2 4 9 40 00 O O" 000

670 (118 W- (Osm - C. a - 20 4 14 0 4 4 20 4 114.4 7 85 0 172 0 711 6 7121 670 on Ver4.ur -

St Ce-c 17 7 17 7 177 1= 1 0 477 0 477 7190

TUtAN 11.1 W.0 7.9e U.S 0.0 115.1 e .o I 2.604 I o10 0.ooo 7,19

1 5, ^, 3. 4. . C2 8..#- g 5.. 4St.1t * .w 1 s3 g 0- 6 1 *0, U. '#. T r.,4e (5TT.

S-4.. ~ - Y**| (g ^4*/N".y 0,4,^.O W.H.4

O/"w06/694 \usr\gs.. ,

1 t I NAt D t i t tt t V I A R J I C I

A C A U A II *I f A A E t E U I t t t t I

t IT U I A I * I A 1E tU I A I D EI I I S T I tt 6 E U I F t I tt I tu I pIt E t II t t I I aO C t IE I

I E 9 2 f E F A I tB /94 I

PAtI[hlo Itotereonnci Loqkstt ~ *tatlR ttdLnhenhoe toquotlr P^tchioj kt teat Lotq4torthitD i v i s i o n -- - - - --- - - - - -- - - - - -- - - -- - - - -- - - - - -- - - - - - - - - -- --.- -- - - - - -- - - - - -- - - - - -- - - - - -- - - - -

_to trode Sreek.. Vtirat.1r.ho Ieti.Loopr t t J h. pre We A racte Breker Vilra'. hfis kton.Coop 4 e A irMt, greateer hItrnt. frets krtr. Coop. 4 IB.6. No",Roller Boller Attic. Roller loller Ah1ic lller lolle r r Ateic.

PtFORttLOUIS I P t I I I 1 2 1 1 I I I Itl

N orth '2. PARpttlfNSE I PI I I 1 2 1 I I I I I I I i I I

RL. ltERE DU FPAFIt I I I I I I 1 2 I I 2 1111 I I I 2 I i

1 '~~~~~~~~~~~~~~~~~~~~~~~~~0

6RAND PNI 6 P I 2 I I 21 1 t l l 2 I I

ShhK; I SI 2 * 2 I I I I 1 i / t I 1 2

South . . . PI.PAItE VItl Ptl II t 1 2 1 1 I I I I I I I

't l 1 F I [s F I I I I I 2 1 I I I 111 I 2 t I

it :1 A 4 2 it il 's ' h-S I I la * S

A R IlF I t 2 1 It

i11 S eopontrlis e rMtw-toer t paticlog to s scrappre at erg Fiscal tear IAi

ItIl Itrnarits Trots to bS scrappe At Nt1 Ft'lAI lear 1i91

a*ug iii us

IFIOWI MuNeIl I I I ci

s i I ti re a l I i If I A v p I 0 J! f c I

*03 a I N I aU F I A a I E U I D3af I I

I I ii 0 t I 1 6

I e A L I I AF 0 I a I I A

EiGuIPUIO 10 F 1 dID Wll~ uR1 UNIT COSY lOIl COIs I MMt COSI TMiKI COST USES cost

I Is8000I I000USII Iiosh ooIIoo0us s I I Ist ONtIO 01 asONI I US II baos I VSII

Se1l-Trc;,il# It, or Iee paIcha,q equipseenl 1,5 1220.04 0,240 40.00 3,120 240.00 2 3,120 240.01

Pabile be,kt rolle I M30 100.2 41 101.5 3 414 310.8

llroIun,all-d,j,e. er jr ,ibratz.., oller 9 38 27 1. 1,240 249.23 9 3,240 249.23

troll waoit, clini 12 420 12.11 5,040 38109 12 ,800 381.09

4-ph,el Cr,.t tiaci, 9 420 32.1 3,100 290.11 9 3,760 290.17

Ok,.perl as l.at,sIl 9 108 13.05 1,020 124.42 9 1,028 124.42

20,334 1, 34. 1 12,114 934.40 3,120 2000 11,048 381.09

CT

- 41 -

Annex Via

TRFFIC WMGRANT

a' hpwovement, traffic shgaI,kbop detectors of SSR, VWrgNeNAZ, Remy OLLIER street 123 300 423

b) 33 Loop detectors on exsUtngtraffic INits 15 100 115

c) 2 LlVta and Loop detectors aongAl (Port Louis/Saint-Jean)

1 Llght and Loop detector atJunc+Jon A4-B11 (Grand Bale Rd/Plahe des Papaye, Rd) 15 62 77

d) Trafflc Llft alng Ml (Palles/Labrdomale Sq), M2, Al and Al 0(between Port Louls/Curepipe) 77 769 846

0) Eq.znent for speed chec 77 77

TOTAL: 231 1,308 1,538

- 42 -

:ECI f-EVB4d SAV AND EMM1 M NTO

LOCAL FOREIGN TOTAL(000 USS) (000 US$) (000 US$)

a) Break Testhg Equaom 1/ 22.0 128.0 150.0

b) 2 Headlk" Testing Eqwpnent 0.5 2.5 3.0

c) 8 Set Wheel AlTent Eq.ment 3.0 18.0 21.0

d) Enmsson Testin Devices 41.0 235.0 276.0

TOTAL 67.0 383.0 450.0

1/ Financed by Australia.

- 43 -

Page 1 of 2

SFCXID N4OWAYS PEROJI

TECHNICAL ASSISTANCE TO TO

OLIFlH TERMS FAFE~

1. The TO wil reed techrical assistance to carry out proper road maintenanceoperatunsi traffic management and vehicle safety and emission control program, and trainfts persornel.

2.Team Composition Liath of Svices

(Man-Months)

Road Maintenance (Resurfacing) Expert 30Road Maintenance (Routine) Expert 24Traffic Management Expert 6Envirorinental Expert 15

T 0 T A L 75

3. Each expert should be a professional In his area of expertise and should have:

a) fkhency h upokmn and written English and/or French;b) trainn experience In Ns fled, andc) work expermence In a developng country.

Road M&NWMwC EMKts

4. They should be road engneors with at least ten years experience in the fi*ld.In partuar, they should have extensive knowledge and experience in: (a) management ofroad works-, b) contract and specifications; (c) supervision of works; (d) road

- 44 -

Amefx VIlPage 2 of 2

maintenance and construction (e) maitenance of eqW.ment; (f) use of road eQwment;and (g) soils engneerkg. They sod assist h

(i) preparig road maintenance programs;(11) preparhg bkis, lettig out contracts and supervising the work;(Ill) orgarizig road maintenance brigades; and(Iv) providng on-the-job traing to managers, technical staff and equipment

operators.

Tratffe _agmw t E

5. He should be a road enginer speciailzed in traffic engheerhg wth at leastten years experienem In th s fed H1 should, in particular, have extensive knowledge andexperence In systems design, lmplementatlon, management and control. He should assist h:

(I) deslOg cohesve traffic contrd systems, signing, signallzatlon andIntersections bWrovement;

(11) preparkg bids, lettig out contracts and supervision of the works; and(111) training on-the-Job managers and technilcal staff.

EM.a U.'l Ed

6. He should be a civil engineer or a mechanical engineer specialized In pollutioncontrol with at least ten years experbnce In this fiekL He should assist hi

(1) selectig eument to measure vehicle wmsslon pollutants;(11) preparing bids, lettig out contracts and receivig the necessary

equpment;(111) moritorhg the pollutants and setthg up standards; and(Iv) preparhn an rplmentatlon program for poUution control.

- 45 -

ENX Vl

scrND __zAYS PROJECT

m~at~ Drim~itaar~ DaaAalaij in the Pro lact Elie

1 FeasLility Study for Strengthening and hprovement of Main Roads (November 1988)

2. Detail Enginering for Strengtheng and hIrovement of Main Roads (January 1989)

3. Entretlen Routler (Etude de FalsatIltt des Travaux de Sauvegarde, et Etude der'Orgarn_atlon) (Mars 1988)

4. Second Hlghways Project Other Carponents: (a) Road Maintenance andOrganization; (b) Traffic Marnagement; arid (c) TrahnV of Staff (February 1989)

5. Feasibility Study of Corstructlon of the North Road (October 1988)

6. Feasbilty Study for Upgradin of Al and A2 Roads (October 1988)

7. Feasbility Study for Proviskn of a Crawler Lane to Motorway M2 and Creatkin ofthe Rose Hill Lhk (Decetber 1988)

8. Study of Efficency and Scrutiny on Vehicle Fleet Management and Maintenance(March 1989)

MAURITIUS

SECOND HIGHWAY PROJECT

ROAD NETWORK, 1984 - 88

Year Length of Roads (Km) Percentage Density(As at end) Motorways Main Secondary Other Total of Roads of total Road network

Roads Roads Roads Paved 1/ in Km per sq. kmof area 2/

1984 27 838 577 339 1,781 92 0.95 11985 27 840 :I7 339 1,783 92 0.96 >

1986 27 840 577 339 1,783 92 0.961987 27 840 577 339 1,783 92 0.961988 27 856 3/ 577 339 1,799 92 0.97

1, Motcrways, main roads and secondary roads consist of 100% paved (bituminous) roads;about 40% of other roads are unvaved.

21 Area of Mauritius (1865 sq km)J/ Inc]udes 16 km of new road (Phoenix-La Vigie-Nouvelle France)

coSOURCE: Ministry of Works, Mauritius, November 1988 r

1-

- 47 -

TABLE 2

MAURITIUS

SECOND HIGHWAY PROJECT

MOTOR V'EHICLE FLEET(1984 - 1988)

Type of As at end ofVehicles 1984 1985 1986 1987 1988

Passenger car 26,274 26,455 27,053 28,337 29,449

Land rovers,pickups 10,850 11,367 ;2,130 13,776 14,125

Trucks 4,692 4,738 4,866 5,085 5,315

Trailers 976 983 997 1,039 1,074

Buses 1,364 1,369 1,360 1,529 1,687

Others 1/ 30,213 30,683 31,823 35,911 38,997

TOTAL 74,369 75,595 78,229 85,677 90,647out of which

StateVehicles 2,744 2,915 3,003 3,252 3,357

PrivateVehicles 71,625 72,680 75,226 82,425 87,290

1/ Others include motorcyles, auto-cycles, tractors, dumpers,prime movers and road rollers.

SOURCE: Ministry of Economic Planning and Development, November 1988

- 48 -

TABLE 3

MAURITIUS

SECOND HIGHWAY PROJECT

DISTRIBUTION OF BUSES ACCORDING TOOPERATORS AND VEHICLE MAKE

(As at September 1988)

O P E R A T O R

AllMake NTC UBS RHT TBS MBT IC Opera-

tors

NO. OF VEHICLES

Isuzu 107 40 6 - - 186 339Bedford 34 108 36 17 17 90 302Tata 76 40 - - - 221 337A. Leyland 65 15 26 31 - 51 188Premier 67 9 15 10 1 8 110Hindusthan - 5 - - - 2 7Seddon - 19 - 9 - 7 35Datsun/Nissan 2 4 - - - 17 23Toyota - - - - - 10 10Daihatsu/Daewoo 1 1 - - 2 8 12Mitsubishi - - - - - 19 19Hino 4 - - - - 36 40Dodge/Matador 4 - - - - 2 6Ford - 1 - - 2 18 21Morris/Austin - - - - - 3 3Albion/Commer - 2 - - - 2 4

All makes 360 244 83 67 22 680 1,456

NTC - National Transport CooperationUBS - United Bus Service, Ltd.RHT - Rosehill Transport, Ltd.TBS - Triolet Bus Service, Ltd.MBT - Mauritian Bus Transport, Ltd.IO - Individual Operator/s

SOURCE: National Transport Authority, MauritiusNovember 1988

- 49 -

TABLE 4

MAURITIUS

SECOND HIGHWAY PROJECT

DISTRIBUTION OF BUSESACCORDING TO OPERATORS AND AGE

(As at September 1988)

O P E R A T O R

Age of Vehicle All(Class interval NTC UBS RHT TBS MBT IO Opera-

in years) tors

NO. OF VEHICLES

Under 2 44 51 12 12 4 2624 3862 < 4 28 32 5 4 4 5 784 < 6 52 - - - - 1 536 < 8 124 12 8 1 1 71 2178 < 10 34 2 14 19 1 186 25610 < 12 28 44 15 13 4 61 16512 < 14 26 42 13 7 6 35 12914 < 16 18 30 9 8 2 33 10016 < 18 5 17 4 3 - 11 4018 < 20 1 14 3 - - 14 32

All Classes 360 244 83 67 22 680 1,456

Median Age (yrs.) 6.90 11.14 10.33 9.74 10.50 8.00 7.94

NTC - National Transport CooperationUBS - United Bus Service, Ltd.RHT - Rosehill Transport, Ltd.TBS - Triolet Bus Service, Ltd.MBT - Mauritian Bus Transport, Ltd.10 - Individual Operator/s

Source: National Transport Authority, MauritiusNovember 1988

- 50 -

TABLE 5

MAURITIUS

SECOND HIGHWAY PROJECT

BUS OPERATIONAL STATISTICS

Unit 1983 1984 1985 '986 1987

Operationalbus fleet(as at 30th June) No. 1,040 1,094 1,114 1,072 1,143

Total vehiclejourneys Thousand 3,018 3,140 3,187 3,413 3,611

Average vehiclejourneys/day Thousand 8.3 8.6 8.7 9.4 9.9

Total vehiclekilometers Thousand 55,573 57,250 57,223 59,491 62,358

Average vehiclekilometer/day Thousand 152 157 157 163 171

Total grossreceipts '000 Rs. 268,034 276,215 322,000 342,700 364,000

Average grossreceipt/day '000 Rs. 734 755 882 939 997

Source: Central Statistical OfficeDigest of Transport Statistics, 1987

- 51 -

Table 6

MAURITIUS

SECOND HIGHWAY PROJECT

OPERATIONAL STATISTICS OF IMPORTANT BUS COMPANIES

Periodending

Itms Dec. NTC UBS RET HIs MBT

Average nc. 1984 335 235 80 51 19of busesheld 1985 336 234 80 54 18

1986 332 233 79 56 20

1987 339 225 74 58 21

Bus utili- 1984 71 60 66 84 84zation x

1985 70 65 67 85 89

1986 75 71 69 87 90

1987 80 72 81 88 86

Averagedaily km. 1984 219 191 148 232 210per busoperated 1985 222 185 145 236 215

1986 223 181 150 243 200

1987 213 183 145 242 203

NTC - National Transport CooperationUBS - United Bus Service, Ltd.RHT - Rosehill Transport, Ltc.TBS - Triolet Bus Service, Ltd.MBT - Mauritian Bus Transport, Ltd.

Source: National Transport Authority, MauritiusJuly 1988

- 52 -TABLE 7

MAURITIUS

SECOND HIGHWAY PROJECT

TRAFFIC IN PORT LOUIS(in '000 metric tons)

1983/84 1984/85 1985/86 1986/87 1987/88

Imports

- Bagged cargo 121.8 100.5 119.7 105.6 100.5- Bulk cargo 565.8 576.8 616.9 783.7 908.8- General cargo 81.8 97.3 111.0 126.9 122.3- Containerizec cargo 156.8 155.8 174.1 213.8 293.2- Others 17.6 17.5 22.1 24.2 34.4

Total 943.8 947.9 1,043.8 1,254.2 1,459.2

Exports

- Bagged cargo - 1.0 14.6 6.8 4.4- Bulk cargo 729.9 671.4 683.3 906.5 796.8- General cargo 3.4 10.1 8.9 2.4 6.4- Containerizea cargo 62.4 73.0 81.2 107.7 137.8- Others 17.3 18.2 19.2 16.7 19.2

Total 813.0 773.7 807.2 1,040.1 964.6

GRAND TOTAL 1,756.8 1,721.6 1,851.0 2,294.3 2,423.8

Source: Mauritius Marine Authority, November 1988

- 53 -

TABLE 8

MAURITIUS

SECOND HIGHWAY PROJECT

AIR TRAFFIC (AT PLAISANCE2

1984 1985 1986 1987 1988*

1. Aircraft movements(weekly average) 67 70 69 69 70

2. Passenger traffic in '000(arrivals & departures) 396 423 472 601 643

3. Air freight (in '000 tons)loaded and unloaded 5.9 10.0 13.6 19.0 20.9

*Projectioa

Source: Department of Civil Aviation, ar.d Air Mauritius Ltd.,November 1988

- 54 -

TABLE 9

MAURITIUS

SECOND HIGHWAY PROJECT

MAURITIUS MARINE AUTHORITYINCOME AND EXPENDITURE ACCOUNT

(Rs'000)

Year Ending ear Ending Year EndingJune 30, 1983 June 30, 1984 June 30, 1985

Operating Income

Vessel Dues 23,318 23,146 31,941Traffic Dues 43,966 43,248 51,911Sub-Total 67,284 66,394 83,852

Operating Expense

Salaries, wages andallowance 13,323 14,689 16,586

Pension Fund Cont. 2,021 2,447 1,674Rent 1,500 1,500 1,500Repairs & maintenance 5,577 6,910 6,298Electricity & water 1,285 1,107 1,286Depreciation 11,810 12,247 10,482Security 690 690 690Fuel, oil & lub. 1,654 2,056 1,994Tools & cargo gear 941 - -Insurance 849 887 973Hire of contanierequipment 154 94 16

General expenses 788 1,306 664Sub-total 40,592 43,933 42,163

Net Operating Income 26,692 22,461 41,689Other income 3,327 5,275 6,273AdministrativeExpenses 6,554 8,475 10,547Financial Expenses 7,615 7,549 7,196Net surplus 1j,950 11,712 30,219

SOURCE: Mauritius Marine Authority -

Annual Report and Accounts, 1983-84, 1984-85November 1988

(t- ht 9 nrr

- 55 -Table 9 contd'

SECOND HIGHWAY PROJECT

MAURITIUS MARINE AUTHORITY

INCOME EXPENDITURE ACCOUNT (RS '000)

Year Ending Year Enaing Year Ending6/30/86 6/30/87 6/30/88

Operating Income

Vessel dues 36, 619 42,249 42,338Traffic dues 62,834 76,092 86,293

99,453 118,341 128,631

Operating Expenses

Operating Salaries 18,976 20,368 31,035Wages & Staff Benefits

Running Exp. & Repairsof equpt. and bldgs. 11,635 15,294 19,892

Depreciation 11,037 17,515 18,294

Sundry OperatingExpenses 4,071 4,994 5,243

45,719 58,171 74,464

Net OperatingIncome 53,734 60,170 54,167

Other Income 9,449 13,174 16,130

AdministrativeExpenses 10,254 13,323 18,593

FinancialExpenses 6,607 6,178 9,144

NET SURPLUS 46,322 53,843 42,560._._,. =am

Source: Mauritius Marine AuthorityMay 1989

- 56 -

TABLE 10

MAURITIUS

SECOND HIGHWAY PROJECT

AIR MAURITIUS, LTDANALYSIS OF REVENUE AND EXPENDITURE

Year Ending Year Ending Year EndingMarch 31, 1986 March 31, 1987 March 31? 1988

Rs '000 x Rs '000 x Rs '000 X

Revenue

Internatioralroutes 632,619 83.3 815,107 82.5 1,220,882 86.0

Domestic route 46,098 6.0 62,950 6.4 89,904 6.2Handling operation 43,406 5.7 41,988 4 2 57,445 4.1Engineering div. 12,707 1.7 15,648 1.6 19,147 1.3Other revenue 24,770 3.3 52,487 5.3 33,695 2.4

Total 759,600 100.0 988,180 100.0 1,419,073 100.0

Expenditure

Aircraft opera-ting costs 493,824 73.6 480,194 66.6 725,794 66.6

Hire of aircraft 51,120 7.6 50,262 7.0 77,610 7.1Personnel - salaries

& other expenses 51,134 7.6 76,779 10.7 97,771 9.0Depreciation 6,416 1.0 10,381 1.4 21,321 2.0Advertising, public-

ity sales comm. 63,106 9.4 87,468 12.1 142,778 13.1Repairs/maintenance 2,087 0.3 1,794 0.2 6,233 0.6Adm. expenses &overheads 3,154 0.5 8,363 1.2 14,707 1.3

All other expenses 259 - 5,596 0.8 3,574 0.3

Total 671,100 100.0 720,837 100.0 1,089,788 100.0

Source: Air Mauritius, Ltd. - Report and Accounts1st April 1986-31st March 1987 and1st April 1987-31st March 1988

Mauritius, November 1988

- 57 -

TABLE 11

MAURITIT US

SECOND HIGHWAY PROJECT

CIVIL AVIATION DEPARTMENTREVENUES AND EXPENDITURES

(For FY1987/88)

Revenues Rs'000

Landing & parking fees 19,591Rent 268Passenger service charge 25,922Fuel throuhput charge 12,705Sale of publications 8Receipt from duty free shops 2,889Route air navigation charge 3,863Concessionnaire charge 4,444Night service charge 2,240

TOTAL 71,930

Expenditures

Personal emoluments 21,098Other charges 17,110Special expenditures 96

TOTAL 38,304

SOURCE: Civil Aviation Department, Mauritius, November 1988.

- 58 -

TABLE 12

MAURITIUS

SECOND HIGHWAY PROJECT

FUEL PRICE STRUCTURE (1987)(Rs per litre)

COMPONENTS MOTOR SPIRIT GAS OIL

c.i.f. (Port Louis) 1.57 1.38Stamp duty 0.27 0.24Customs duty 4.25 1.30L/C chargesOcean loSurvey feesOffl.oading charges )0.04 )0.04Import feesAdministrative charges ) )Interest for 30 daysSTC's margin 0.64 0.85

STC Price 6.77 3.81Dist. Cost/Retailers' margin 0.93 0.70Pump Price 7.70 4.51

SOURCE: State Trading Corporation, Mauritius, November 1988

- 59 -

TABLE 13

MAURITIUS

SECOND HIGHWAY PROJECT

REvENU, FROM ROAD TRANSPORT

(Rs in million)Source of As at end of DecemberRevenues 1983 1984 1985 1986 1987

Fuel Taxes 268.20 278.50 305.80 351.30 359.50

Import Duties onMotor Vehicles 49.60 74.30 107.10 235.10 428.50

Import Duties onTyres and Spare 38.30 59.20 69.90 78.70 105.10Parts

Vehicle Licensing 26.10 25.40 25.00 27.10 30.00

Vehicle Registration 0.80 0.90 0.90 1.10 1.60

Vehicle TechnicalInspection 1.90 2.00 1.90 2.00 2.10

TOTAL 384.90 440.30 510.60 695.30 926.80

SOURCE: Ministry of Finance, November 1988

- 60 -

TABLE 14

MAURITIUS

SECOND HIGHWAY PROJECT

EXPENDITURE ON ROADS

(Rs in million)ITEMS 1983/84 1984/85 1985/86 1986/87 1987/88

Road Construction 5.1 18.5 58.3 148.2 213.8

Road Maintenance

(i) Routine 2.8 2.8 2.6 3.0 4.2(ii) Periodic 9.9 10.5 10.4 11.2 10.9

Administration 1/ 29.6 29.7 31.0 31.2 35.4

TOTAL 47.4 61.5 102.3 193.6 26h3

1/ Includes personnel emoluments and other chargessuch as travelling, office expenses etc.

SOURCE: Ministry of Works, November 1988

- 61 -

TABLE 15

MAURITIUS

SECOND HIGHWAY PROJECT

REVENUES AND EXPENDITURES 1/OF IMPORTANT BUS COMPANIES

(Rs'000)

NTC2 / UBS2 / TBS2 / MBT2 / RHT2 /Reference Period Aug'88 Aug'88 Sept'88 Sept'88 March'88

Revenues 14,432 8,620 2,635 835 2,140

Expenditure

Salaries 5,552 2,073 945 247 510Other Payments 827 1,633 194 34 367Depreciation of 3,983 2,426 791 273 695buses (incl.fuel, lub)Depreciation ofplant & machinery 1,793 914 248 148 390

Administrative 847 818 173 181 191

TOTAL ;3,002 7,864 2_351 883 2,153

1/ Based on latest monthly financial data available to National TransportAuthority- exact reference period for different companies is shown in the aboveTable

2/ NTC - National Transport CooperationUBS - United Bus Service, Ltd.TBS - Triolet Bus Service, Ltd.MBT - Mauritian Bus Transport, Ltd.RHT - Rosehill Transpcrt, Ltd.

SOURCE: National Transport Authority, November, 1988.

MAURITIUIS

SECOND HIGHWAY PROJECT

PUBLIC SECTOR INVESTMENTS

(Rs in Million)At Current Prices

Sector 1986/87 1987/88 1988/89 1989/90 1990/91 TOTAL(Actual) (Revised Estimates) ---------(Projected)--------- FY88-90

Agriculture, fisheries andco-operatives 290 377 346 471 365 1,182

Industry and Tourism 100 116 105 138 105 348Physical planning, environment

and housing 121 105 224 207 193 624Water Supply 153 136 144 110 97 351Sewerage and urban

infrastructure 8 6 33 51 73 157 1Energy 20 47 209 107 98 414 0Port 27 99 76 134 240 450Airpcrt 317 320 56 60 63 179Roads and inland transport 179 263 238 251 231 720Telecommunications 247 208 618 672 515 1,805Health 29 '.0 120 66 73 259Education and Culture 27 49 45 62 71 178Manpower and trainiiig 7 18 39 53 66 158Rodrigues and the outer

islands 48 62 82 100 123 305

Other Capital Projects 439 555 802 850 838 2,490

TOTAL 2,012 2,411 3,137 3,332 3,151 9,620

SOURCE: Ministry of Economic Planning and Development, Mauritius, November 1988

Ca.

MAURITIUS

SECOND HIGHWAY PROJECT

INVESTMENT IN PORT

(Rs in Million)At Current Prices

Project 1986/87 1987/88 1988/89 1989/90 1990191 TOTALItems (Actual) (Revised Estimates) ---- (Projected)--------- FY88-90

Port DevelopmentNew Fishing Port - _ _ _ _ _New Port Projects (other

investmentsl 4 4 4 5 5 14Turning basin 18 - - - - -Multi-purpose tug 5 50 - - - -

Dredging and reclamation ofMer Rouge - - 10 50 10 70

Purchase of cargo handlingequipment - 30 30 13 5 48

Replacement of MV Mauritius - - - 50 100 150Joint shipping venture - - - 100 100Construction of a marine house - - 2 1 20 23Development of a marine at

Chien-de-Ploab - _ 15 15 - 30

Expansion of Contamir Park - 15 15 - - 15

TOTAL 27 99 76 134 240 450

SOURCE: Ministry of Economic Planning & Development, Mauritius, November 1988

m

MURITIUS

SECOND HIGHWAY PROJECT

INVESTMENT IN AIRPORT

(Rs in Million)At Current Prices

Project 1986/87 1987/88 1988/89 1989/90 1990/91 TOTALItems (Actual) (Revised Estimates) ---- (Projected)--------- FY88-90

Resurfacing of Runway Navigationaids and equipment 5

New Control Tower - - - _ _ _New Terminal Building 106 25 13 - - 13Access Road and car park 18 3 1 - - 1Building and engineering works 182 280 18 - - 18Minor Works Progranmme 2 2 10 5 5 20 olAcquisition of vehicles 4 10 8 10 9 27Acquisition and installation

of elec./mech. equipment - - 6 10 6 22Renewal of radio and navigation

aids - - - 35 43 78

TOTAL 317 320 56 60 63 179

SOURCE: Ministry of Economic Plarning & Development, Mauritius, November 1988

wI-moo

HAURIIUS

SECOND HIGHWAY PROJECT

INVESTMENT IN ROADS AND INLAND TRANSPORT

(Rs in Million)At Current Prices

Project 1986/87 1987188 1988/89 1989/90 1990/91 TOTAL

Items (Actual) (Revised Estimates) -- (Projected)--------- FY88-90

Grand River North West Bridge 1 -

Phoenix-Nouvelle France Road 41 80 30 8 - 38

First Highway Project 83 100 74 20 - 94

Port Louis through road andtraining center 19 43 19 5 - 24

Bridge reconstruction program - - 12 15 23 50

Nouvelle France-Plaisance Road - - 20 60 45 125

Traffic Management Unit 5 4 4 2 2 8

Other minor works and roadresurfacing 5 11 11 13 13 37 -

NTC-renewal of vehicles andequipment 24 24 18 18 11 47

NTC-construction andrenovation program 1 1 4 5 5 13

Upgrading of GRNW-Labordonnais Sq. Rd. - - 10 20 9 39

Bean Bassin-Port Louis Link Rd. - - - 13 13

Second Highway Project - - 10 50 100 160

Provision of Touristicinfrastructure - - 25 25 10 60

Port Louis-Curepipe RailwayLink Study - - - 10 - 10

New Road Projects - - 1 - - 1

TOTAL 179 263 238 251 231 719

SOURCE: Ministry of Economic Planning & Development, Mauritius, Nove.rber 1988 |-

TABLE 20

MAURITIUS

SECOND HIGHWAY PROJECT

ROAD TRAFFIC ACCIDENTS

Number Fatalities IniuriesNo. of of Motor No. of Casualties Per Per 1000 Per Per 1000

Year Accidents Vehicles Fatal- Other Total 100,000 Registered 100,000 RegisteredInvolved ities Injuries Pop. Mot. Vehicles. Pop. Mot. Vehicles

1984 4,681 7,538 82 2,247 2,329 8.4 1.1 230.0 30.5 OK

1985 5,035 8,235 104 2,581 2,685 10.6 1.4 262.0 34.5

1986 5,707 9,410 109 2,725 2,834 11.0 1.4 274.2 35.6

1987 7,059 11,869 112 3,182 3,294 11.2 1.4 317.0 39.3

Source: Central Statistical OfficeDigest of Road Transport Statistics, 1987

Irm0v

MAURITIUS

SECOND HIGI1WAY PROJECT

SALES (QUANTITY) OF MOTOR SPIRII' AND GAS OIL AND MARKET PRICE

(1980 - 1987)

Yeai. Sales (000 litres) __ Price (Rslliter) _

Motor Spirit Gas Oil Motor Spirit Gas Oil

Premium Regular Total (Dlesel) Premium Regular

19pi 49,200 4,200 53,40() 67,900 5.73 5.56 3.67

19fi 44,610 3,659 48,269 70,098 7.16 7.05 4.52

19o2 41,759 3,114 44,873 65,567 7.27 7.16 4.41

1983 43,757 1,820 45,577 63,478 7.27 1' 4.41

1984 46,785 - 1/ 46,305 64,890 8.15 4.85

1985 47,484 - 47,484 67,800 8.15 4.85

1986 51,488 - 51,488 74,118 7.70 4.51

198? 59,359 - 59,359 82,919 7.70 4.51

I/ "Regular' motor spirit is no longer on sale as from September 1983

SOURCE: Central Statistical Office, Ministry of Economic Planning and

Development, Mauritius, November 1988

m

ROA ~&lITWIt C*flATIO WITHBi flU MIISTh OF K(S

h I N I S T E R

PERMANENTSECRETARY

CHIEF ENCINEERTECHN4ICAL WDIVISION_

r _ 9 -[PIE Uoide E.LaE bort Survey.r 1PArchitectr-- ---- P [___ _ _____1[P

ENGINEER (CIVIL) EMGINEER (lv NEER (CIVIL)P 1 _ *PH F,CP LL PW,R,S ]

(HIEF ImSPECO | FINSPECTOR [LIEFNECTOR

IkSPECTOR INSPE(TOAJ LSECTA [| INSPECT OR7L NWSP ECTOR| [INSPECTOR INSPECTO [YSPECTOR J INSPECT]

Pi PORT I OtilS M HOKE PW: PLAINE WILHEMSp PAMFif MOUSSE F FLACi OR: 3 ELACK RIVERRR RIVIERE DIJ REiPART GP: GRAND PORT S SAVAiWEPE PRINCIPAL ENGINEER P PRINCIPAL

a~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ,

C~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Ihu l us

C H Ai h I

StIOD HIotNAY PRuJtCI

bRUJtCI ImpttiI1ki;lION SCIHEDUt

_ ___ _ _ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~- -- kfu. ------

NO ls9u 1991 1992 F 9II I f n I I f 0 C p a P E t t S A C I I V I I t A Y I I u t 3 Y

^ ____ __ _ - t 6o~. t, -- t - 1 2 3_4 _ ?3 4_ I

ta S Lgn ing 60rvernement/IHRD

kout Ine JInIer p fquipa.ni Prepiatilon ol bids SupPlIPrs

T1Af,ic ninagesent Evfluatlon I Amard 6overnement,!hD

E.Amion Control Supply Supplier%

Resurtufinq IID ta N:n RoAds PrepAration lf Bidding% Douaenat Iov,reerne,;ItiD _ I 0

Preparation ot Bids Contractors

Evalaution I Aiard SavernesentlhD |

NottsIO ContrActors I j

Routne Maintenance force Ac(ount torks I ortk -. TD ID t _ _

St-eng'nening and 45 In n.,^ Roads Preparation ,o Bids Cpitrr(tor lo -

laprf.eeent [dinluation I Awdrd borneosertikIEIlr

|orti Lontrtators I I ,

LUn5!tiLnq Se-Yt(es Suptrfimon and leternaidl Proposols LcOnulIdns | IAsicstaocn EVloAtion A A.arJ Io,erneae., II.Mf J j I I

_ _ _ ____ lsertices lI ~Cons ltjnr' i f ; t - -t - =t 4 t = i

-~~~~~~~~~~~~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ -

'-4

[ ~~~M A U R I T I U S

SECOND HIGHWAY PROJECT

CIA! NC <IC! NCNC,

FIRST A C IHWfl PRC)II I A

St I I IMIl H II xH A I PR' ~Airr*/XPt SARI AC N2

f I CC Ni I HlCN iSWA PQ() 11I

MAIN R(QA[C$

Rl'RAi RAIC-DS

* Su<A, AC CR I 5

tCNTIRNAUI0NAC AIIPORT

Hot, Il C CI iCA" C S; ;

C. RIC .RS IC ARIC

I NASI RrlA IC C4 CC UN 51 POp )4 :i@tv. >

iNIFRIWIl -1 C )-N

(~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ' 'C: ,'.'.' S

C ~ '.,v'-'CC1, C..C. \CC/

IPE~~~~~~~~~~~~~~~~~

I H 9 57w~~~~~~~~~~~~~~~~~~~MAHEBIOURG