WIND POWER PLANTS
Submitted By :
Rahul Kalathil 095077Karan Gandhi 095073
Gaurav Kamath 095079
Nikunj Sodhani 095
Mohit Thawani 095
-
8/2/2019 Wind Power Final
2/38
WIND ENERGY
Wind are caused by uneven heating of the atmosphere by the sun
and irregular of earth surface. Hot air reducing the pressure at the surface
while going up, cooler air going down the result is the wind. The air has
mass when it is in motion it have energy of motion.
WHY WIND ENERGY?
Wind power is renewable. Winds will keep on blowing, it makes
sense to use them.
WIND POWER PLANT
Also known as a wind farm, a group of wind turbines connected
together and its output going to a common power provider system.Operation, control, and maintenance functions are centralized through a
network of computerized monitoring systems. Special training team
provide visual inspection ,maintenance, and repair operations.
-
8/2/2019 Wind Power Final
3/38
WIND MILL
-
8/2/2019 Wind Power Final
4/38
WIND TURBINE BLADE
-
8/2/2019 Wind Power Final
5/38
BERNOULLIS PRINCIPLE
-
8/2/2019 Wind Power Final
6/38
LIFT
-
8/2/2019 Wind Power Final
7/38
TYPES OF WINDMILL
-
8/2/2019 Wind Power Final
8/38
-
8/2/2019 Wind Power Final
9/38
WIND TURBINE HUB
-
8/2/2019 Wind Power Final
10/38
THE GENERATOR
-
8/2/2019 Wind Power Final
11/38
TOWER COMPONENTS
-
8/2/2019 Wind Power Final
12/38
BLOCK DIAGRAM
-
8/2/2019 Wind Power Final
13/38
MOUNTINGS
12
3
1.Wind Speed Indication2.Lightning Conductor3.Wind Direction Indicator
-
8/2/2019 Wind Power Final
14/38
ROTATIONAL ACCELERATION DURING RUN-AWAY.
-
8/2/2019 Wind Power Final
15/38
CONTROL AND SAFETY SYSTEMS The high demands on reliability require systems that are simple
enough to be robust, but at the same time give the possibility for
necessary supervision.
The number of sensors and other active components need to be
limited as far as possible, however the necessary components must be
of the highest possible quality.
The control system has to be constructed so that there is a high degree
of internal control, and to a certain degree the system must be able to
carry out its own fault finding.
-
8/2/2019 Wind Power Final
16/38
CENTRIFUGAL RELEASE UNIT
HCU placed on the high speed shaft of thegearbox
-
8/2/2019 Wind Power Final
17/38
TIP BRAKE
-
8/2/2019 Wind Power Final
18/38
MECHANICAL BRAKES
-
8/2/2019 Wind Power Final
19/38
1. The speed of the wind in those locations should be high to produce large
amount of energy.
2. The farms should be build on higher altitudes .
3. Mutual inference in the working of the wind turbines should be check by
observing their effects because they really affects the output power.
4. Check out effects of the wind farms or the wind turbines on the environment
5. Another important factor also carefully observe that what are the effects of
the wind farms on the grid stations because it really helpful for the production
of the power.
SITE SELECTION WIND POWER PLANT
-
8/2/2019 Wind Power Final
20/38
GREEN ENERGY TO GRID AT DHULELOCATION OF PROJECT ACTIVITY
-
8/2/2019 Wind Power Final
21/38
PROJECT ACTIVITYS CONTRIBUTION TO SUSTAINABLEDEVELOPMENT
Reduction in greenhouse
gases, mainly carbon dioxide Reduction in energydemand (marginally) in thestate grid
Capacity building and
employment generation inrural areas
Reducing pollution load onthe atmosphere (SOx, NOx)
Conserving fossil fuel and
making them available forother useful purposes
Helps increasing thepenetration of renewablepower composition in the
grid
-
8/2/2019 Wind Power Final
22/38
Duration of the projectactivity:
Starting date: 24/10/2005 Expected operational
lifetime of the projectactivity: 20 years 0months
-
8/2/2019 Wind Power Final
23/38
ESTIMATED AMOUNT OF EMISSION REDUCTIONSOVER THE CHOSEN CREDITING PERIOD:
Year Annual estimation of emission
reductions in tonnes of tCO2
e 2008 2009 38,098 2009 2010 38,098 2010 2011 38,098 2011 2012 38,098
2012 2013 38,098 2013 2014 38,098 2014 2015 38,098 2015 2016 38,098 2016 2017 38,098
2017 2018 38,098 Total estimated reductions (Tonnes of CO2e)
380,980 Total number of crediting years Ten
-
8/2/2019 Wind Power Final
24/38
ILLUSTRATION OF THE PROJECT ACTIVITY BOUNDARY
660Vmain
transformer
33kV
sub stationend users
-
8/2/2019 Wind Power Final
25/38
TECHNOLOGY APPLIED High co-efficient of power formaximum harnessing of wind powerby a rotor fitted with high
performance blades
Increased efficiency
Advance hydrodynamic fluid
coupling to absorb peak loads andvibrations
Integrated power transmission
mechanism
Well-designed four level safetysystems ensuring maximumprotection against damages
-
8/2/2019 Wind Power Final
26/38
Duration of the projectactivity:
Starting date: 24/10/2005 Expected operational
lifetime of the projectactivity: 20 years 0months
-
8/2/2019 Wind Power Final
27/38
General data: Generated power 1500 kW Number of Units 3 Available Q4 2011
Design Data: Operational area 4-25 m/s Nominal rotor speed 17,3
rpm Generator Asynchronous, 4-
6 poles, nominal frequency50HZ
Power control Stall/ pitchcontrol
Yaw Control Active through
adjustment of 5 gears
-
8/2/2019 Wind Power Final
28/38
Yaw Control Pitch Control
-
8/2/2019 Wind Power Final
29/38
ON SHORE & NEAR SHORE
-
8/2/2019 Wind Power Final
30/38
OFF SHORE
-
8/2/2019 Wind Power Final
31/38
FUTURISTIC DESIGNS
-
8/2/2019 Wind Power Final
32/38
-
8/2/2019 Wind Power Final
33/38
AIRBORNE HELIUM WIND TURBINES
-
8/2/2019 Wind Power Final
34/38
Wind is free.
Produces no waste or greenhouse gases.
The land of wind farms can be used for
farming.
Wind farms can be tourist attractions.
A good method of supplying energy to
remote areas.
ADVANTAGES
-
8/2/2019 Wind Power Final
35/38
The wind is not always predictable. Some days have no
wind.
Suitable areas for wind farms are often near the coast, where
land is expensive.
Some people feel that covering the landscape with these
towers is unsightly.
Can affect television reception if you live nearby.
Can be noisy.
DISADVANTAGES
-
8/2/2019 Wind Power Final
36/38
Generation of electricity using wind turbine is free of
pollution so we can use it as a renewable energy generation
as wind is a renewable and free of cost.
If we choose the perfect location for the install farm than
we get continuous electricity without cut-off but the
problem is amount of electrical energy is not so much as
energy generated from non-renewable sources. For higher
amount of energy generation using wind power plant more
land for wind farm.
CONCLUSION
-
8/2/2019 Wind Power Final
37/38
REFERENCES http://en.wikipedia.org/w/index.php?title=Wind_power_in_India.htm www.kth.se/ees/foranstallda/polopoly/2.13600/etk/research/publications/modules/publications_p
olopoly/reports/2006/XR-EE-EEK_2006_009.pdf
Special issue Bonus Info- Autumn 1999 http://www.mahaurja.com/PG_WE_Overview.html http//:www.meda.org Supply order dated 26th December, 2005 signed between MSPL Limited and Suzlon Energy Limited. Operation & Maintenance contract between MSPL Limited and WEG Supplier (Suzlon Energy
Limited)
Letter from State Bank of India dated 15 May, 2006 , Reference page no: 9 , 13 & 55. http://unfccc.int www.mspllimited.com www.windpowerindia.com Ministry of Non-Conventional Energy Sources, Government of India: http://mnes.nic.in
UNFCCC document Clean Development Mechanism, Project Design Document Form (CDM-PDD),Version 03 Tool for the demonstration and assessment of additionality Version 04, EB 36 Central Electricity Authority: CO2 Baseline Database Version 3.0
-