![Page 1: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/1.jpg)
Wiggins Island Coal Export Terminal (WICET)
![Page 2: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/2.jpg)
2
Introduction
Wiggins Island Coal Export Terminal (WICET)
• Overview
• Inloading
• Stockyard
• Outloading
Contents
![Page 3: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/3.jpg)
3
Stage 1 of a new coal export facility recently completed in the Port of Gladstone
Capital cost approximately A$3.1 billion
One inloading conveyor
One bridge stacker (125m spans)
One outloading conveyor
One berth
One shiploader
27Mtpa throughput capacity
Wiggins Island Coal Export Terminal (WICET)
![Page 4: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/4.jpg)
4
Aurecon’s role via the AH JV (since 2004):
• Pre-feasibility study
• Feasibility study
• Detailed design
• Civil
• Structural
• Mechanical
• Electrical
• Piping
• Instrumentation and Control
• Environmental
• Onsite construction assistance
• Commissioning
• Ongoing operational assistance
Wiggins Island Coal Export Terminal (WICET)
![Page 5: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/5.jpg)
5
3D model deliverables:
• Bentley Navigator
• Multi-disciplined
• Structural
• Mechanical
• Electrical
• Piping
• Intelligent model files
3D models were complimented by 2D drawings:
• Standard drawings
• Specific details
Wiggins Island Coal Export Terminal (WICET)
![Page 6: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/6.jpg)
6
Wiggins Island Coal Export Terminal (WICET)
![Page 7: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/7.jpg)
7
• Main source of delivery to site
• Latent ground conditions
• Additional load out capabilities added
Barge Wharf
![Page 8: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/8.jpg)
8
• Concrete filled cofferdam
• Reinforced sheetpile front wall
Barge Wharf
![Page 9: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/9.jpg)
9
• Multi-level concrete building
• Train unloading facility
• Interaction with Queensland Rail (QR)
Dump Station
![Page 10: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/10.jpg)
10
Inloading Tunnels
![Page 11: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/11.jpg)
11
• Various tunnel solutions used• Box tunnel (cut and cover)
• Jacked box tunnel
• Arched tunnel
Inloading Tunnels
![Page 12: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/12.jpg)
12
• Supporting 45m spanning gantries
• 3.6m diameter external, 2.4m diameter internal
• Concrete filled annulus
Stockyard Trestles
![Page 13: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/13.jpg)
13
Gantries
• 21 gantries
• Typical 45m span
• 4.6m deep girders
• 300t each
Stockyard Gantries
![Page 14: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/14.jpg)
14
Bridge stacker
• 125m spans
• Shuttling conveyor
• Telescopic chutes
• 780t each bridge
Bridge Stacker
![Page 15: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/15.jpg)
15
Bridge Stacker
Delivery to site on 92m barge as a single 125m span
![Page 16: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/16.jpg)
16
Lifting and installation of western span via a dual crane lift
Bridge Stacker
![Page 17: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/17.jpg)
17
Stockyard reclaim tunnel with reclaim chamber (12 off) and service/escape tunnel
Reclaim Tunnels
![Page 18: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/18.jpg)
18
Construction of reclaim tunnel (RC1) and reclaim chambers
Reclaim Tunnels
![Page 19: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/19.jpg)
19
Jetty galleries (76 off)
• 24m span
• Aluminium full width floors
• 1.8km jetty
Jetty
![Page 20: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/20.jpg)
20
Head end of jetty for transfer onto the wharf conveyor
Jetty
![Page 21: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/21.jpg)
21
Wharf modules
• 9 modules
• 500t to 1200t
• Concrete deck installed
Wharf
![Page 22: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/22.jpg)
22
Wharf module installation via dual crane lift from Jumbo Jubilee vessel
Wharf
![Page 23: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/23.jpg)
23
Shiploader
• 1300t
• 8250tph capacity
• 16m rail gauge
• 53m long boom
Shiploader
![Page 24: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/24.jpg)
24
Shiploader
![Page 25: Wiggins Island Coal Export Terminal (WICET) · One shiploader 27Mtpa throughput capacity Wiggins Island Coal Export Terminal (WICET) 4 Aurecon’s role via the AH JV (since 2004):](https://reader033.fdocuments.in/reader033/viewer/2022042605/5f5cd142668b1d71ee0ba8f2/html5/thumbnails/25.jpg)
25
Future construction is planned at WICET to increase the facilities throughput capacity:
• WEXP1 (when completed)
• Two inloading conveyors
• Increased stockyard capacity
• Two outloading conveyors
• Three berths
• Two shiploader
• WEXP2 (when completed)
• Three inloading conveyors
• Further increase to stockyard capacity
• Three outloading conveyors
• Four berths
• Three shiploader
Wiggins Island Coal Export Terminal (WICET)