What's Next in Interconnection?

11
Sky Stanfield Keyes, Fox & Wiedman LLP October 23, 2014 www.irecusa.org @IRECUSA #3iForum What’s Next in Interconnection?

description

It's happening. States are already considering updates to their procedures following FERC's (Federal Energy Regulatory Commission) significant modifications to the federal Small Generator Interconnection Procedures late in 2013. Sky Stanfield, Keyes, Fox & Wiedman LLP, discusses how interconnection is changing in response to FERC's order. What are the forthcoming innovations that move beyond the issues FERC addressed?

Transcript of What's Next in Interconnection?

Page 1: What's Next in Interconnection?

Sky StanfieldKeyes, Fox & Wiedman LLP

October 23, 2014www.irecusa.org

@IRECUSA#3iForum

What’s Next in Interconnection?

Page 2: What's Next in Interconnection?

November 2013:FERC made substantial

improvements to the federal Small Generator Interconnection

Procedures (SGIP)

Page 3: What's Next in Interconnection?

Pre-Application Reports

• Improves access to system information

• Can make that information available in ALL states NOW

Increase to the Fast Track Size Limit

• More technically valid approach

• 500 kW – 5 MW

Supplemental Review

• 100% of Minimum Load

• Two Screens on safety & reliability

Key components of the updated FERC SGIP

Page 4: What's Next in Interconnection?

Lets Hear it for the Buckeye State!!

Adopted revised procedures in December 2013

OHIO

Page 5: What's Next in Interconnection?

Additionally, since FERC’s order…

Illinois

North Carolina

Iowa?

Massachusetts

Indiana?

Colorado?

Page 6: What's Next in Interconnection?

Who else should consider adopting the SGIP reforms?

Page 7: What's Next in Interconnection?

• No changes to the study process

• Still relies on serial interconnection process to determine upgrades

But are SGIP reforms enough?

STOP?

Page 8: What's Next in Interconnection?

1.0 – Adoption of SGIP or similar reforms

2005 – 2012

2.0 – Update for higher penetration screening

2012 – present

Page 9: What's Next in Interconnection?

What will interconnection 3.0 look like?

Page 10: What's Next in Interconnection?

Interconnection 3.0

Move beyond a reactive and toward a proactive integration of Distributed Energy Resources

Page 11: What's Next in Interconnection?