Vacuum, Surfaces & Coatings Group Technology Department VSC Seminar Radiation-Tolerant design of gauge electronics in the LHC ARCs Nikolaos Chatzigeorgiou TE-VSC-ICM

Transcript of VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos...

Page 1: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Vacuum, Surfaces & Coatings Group

Technology Department

VSC Seminar

Radiation-Tolerant design of gauge electronics in the LHC ARCs

Nikolaos Chatzigeorgiou

TE-VSC-ICM

Page 2: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 2

1. Some numbers of gauges in the DS/ARCs

2. Motivation for RadTol design and goals

3. New system architecture and RadTol electronics

RadTol Penning LOG stage

RadTol 4-20mA transmitter stage

4. Summary

5. 2018 work

Page 3: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 3

• Insulation vacuum for Magnets ~ 10E-7 mbar

• Insulation vacuum for QRL ~ 10E-7 mbar

• Beam vacuum ~ 10E-9 mbar

Pressure monitoring

Leak detection or pumping group problem

Protection of the cryostat (Alarms to CRYO – Pirani/Piezo)

Active gauges Penning E-9 #Head: IKR251, gauge: PKR251

Pirani #Head: custom, Gauge: PKR251

Piezo #Huba 680.99413

DS 16 16 48

ARC 312 312 120

Total 328 328 168

Penning headIKR251

VRJGE Pirani headCustom CERN

Pirani/Penning gaugePKR251

Piezo gaugeHuba 680.99413

Page 4: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 4

Max 1km

• Gauges are distributed along the 3km DS/ARC

• Group of 3 gauges for the sectors (Piezo, Pirani, Penning) covers whole pressure range

• Group of 2 gauges for the pumping groups and beam vacuum (Pirani, Penning)

• Front-end electronics inside VRJGE convert the signal from gauges to analog 0-10V

• The analog signal reach a PLC, which is located in a safe service area (Alcove)

• The maximum distance between PLC and VRJGE is 1km

• PLC converts the analog 0-10V to pressure and provides alarms to CRYO (Piezo, Pirani)

Q D

Gauge electronics

ND100 cable

D D Q D D D

PLC

RE

local cables of gauges

Piezo, Pirani, Penning gauges

VRJGE

Example mid-arc left side of IP

Q D D D Q D D D

Page 5: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 5

LHC environment is changing (beam energy, 25ns operation, luminosity, etc.)

5

Run 1+22009-2018

Run 1+2+32009-2022

Run 1+2+3+HL-LHC2009-2035

30 to 90 Gy ARC

200Gy in DS

Mitigation through RadTol development 500 Gy is our Goal (safety factor>2 for DS) RadTol version not supported by industry Piezo, Pirani, Penning front-end electronics re-design

Data from Radiation calculation group

Page 6: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 6

Compatibility Performance

Maintenance Architecture

R2E

Design goals are driven mainly by R2E but we can have other added values

Page 7: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 7

System

RadTol

Transmission

Modular

Maintenance

Safety

Redundancy

Penning

Compatibility

•IKR070 (E-11)

•PKR251 (E-9)

Pirani

Performance

Calibration

Compatibility

•TPR018 gauge

•PKR251 gauge

Piezo

Robust supplies

Power Supply

Redundancy

Linear PS

Robust

Local for all electronics

Page 8: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 8

• Mini-rack bellow the 1st or 2nd dipole after quadrupole

• Mini-rack will house a 3U euro-crate

• Each gauge will have a dedicated RadTol card

• Modular cards – hot replaceable

Q D

Multi-conductor cable

D D Q D D D

PLC

Alcove

Local gauge cables

Piezo, Pirani, Penning gauges

Example mid-arc left side of IP

Patch Panel

Mini rackFront-end electronics

ND100

4-20mA

ctrls

VRJGE

Q D D D

Page 9: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 9

PenningE-9 mbar

6TE

SHV

0-10V

6TE

PenningE-11 mbar

0-10V

LEMO triax

6TE

Pirani

0-10V

Burndy 4 female

HVAC

ATM

6TE

Piezo

0-10V

Burndy 4 male

±13.5V

By-PassValve

6TE

+24V

84 TE

ProfibusTermination

6TE

Redundant Power Supply±24V

18TE

Supply 1±24V

Supply 2±24V

Dedicated front panel for each card – type of gauge

Presently we have up to 7 gauge electronics

Can fit up to 11 front-end cards + the power supply

Page 10: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 10

Simple - Linear Power supply provides regulated ±24V to the backplane

Enough power to supply the whole euro-crate – up to 11 measuring cards

Board will be ready early 2018

Dry, Temperature, CO60, CHARM tests

Redundant Power Supply±24V

18TE

Supply 1±24V

Supply 2±24V

Mains UPS230VAC

Page 11: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 11

6TE

Piezo

0-10V

Burndy 4 male

±13.5V

Supplies the active piezo with ±13.5V

Converts the gauge output to 4-20mA

Full board early 2018

Dry, Temperature, Vacuum, CO60 and CHARM tests

Page 12: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 12

6TE

Pirani

0-10V

Burndy 4 female

HVAC

ATM

Compatible with passive and active Pirani gauge

Full card early 2018

Dry, Temperature, Vacuum, CO60 and CHARM tests

Page 13: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 13

PenningE-9 mbar

6TE

SHV

0-10V

6TE

PenningE-11 mbar

0-10V

LEMO triax

Compatible with E-11 and E-9 mbar gauges

Full board by end of 2017

Dry, temperature, Vacuum, CO60 and CHARM tests

LOG and Transmitter stage tested separately:

LOG stage accumulated 500 Gy

Transmitter (4-20mA) accumulated 500 Gy

Page 14: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 14

Design Stages Active components PSI test status

Power Supply • Transformer• Filtering• Regulation

• μA7824• MC7924CTG

Piezo • Regulation• Transmission

• μA7815• LM7915CT• LM317• TPS7A3001

Pirani • Wheatstone bridge• Conditioning• Regulation• Transmission

• OP2177ARZ • 2N3019• BC850C

• μA7815• LM7915CT• SM6T39CA

Penning • Regulation• Royer oscillator• Conditioning• LOG amp• Transmission

• μA7815• LM7915CT• LM317• 2N3019• OP2177ARZ

• BC850C• OPA128LM• 2N3811• LT1029CZ• PAD1

• Standardization of stages and components across different design – reduction of PSI campaigns

• 2 active components left for PSI tests in 2018

• Some auxiliary and/or backup will be tested in 2018

Page 15: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 15

• Characterization through current sources• Current measurement from 3pA to 100uA – 8 decades • Error is 1% for 6 decades - 2% for 10pA – 8% for 1pA

1.E-11

1.E-10

1.E-9

1.E-8

1.E-7

1.E-6

1.E-5

1.E-4

1E-12 1E-11 1E-10 1E-9 1E-8 1E-7 1E-6 1E-5 1E-4

Pre

ssu

re [

mb

ar]

Input Current [A]

IKR070: Measured Pressure vs Input Current

Pressure vs Input Current

𝑃 = 𝑎𝐼𝑖𝑛0.8

𝑎 = 0.017 ൗ𝑚𝑏𝑎𝑟𝐴

0%

2%

4%

6%

8%

10%

12%

1E-13 1E-12 1E-11 1E-10 1E-09 1E-08 1E-07 1E-06 1E-05 1E-04 1E-03

Erro

r %

I [A]

abs (Δ I/I), f(I), room temperature

Error from Ib1 - OPA128LM Error from Ib2 - OP2177

Error from Is1 - Is2 Theoretical Total Error

Measured Total Error (4 samples)

Page 16: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 16

Error below 2% for all range – 4% for 1E-11 mbar

Acceptable temperature response between 15 – 30 Degrees C

4 LOG stages in 3 runs (total 3 weeks) at CHARM

10pA (2.79E-11 mbar) sourced to each LOG

All 4 LOG stages accumulated 500Gy with small degradation

0%

1%

2%

3%

4%

5%

6%

7%

1E-11 1E-10 1E-09 1E-08 1E-07 1E-06 1E-05

ΔP

/ P

%

Pressure [mbar]

abs(ΔP/P), f(P), room temperature

Measured Total Error (4 samples) Theoretical Error

0%

10%

20%

30%

40%

50%

60%

70%

80%

15 C 20 C 25 C 30 C 35 C

ΔP

/P %

Temperature [°C]

abs (ΔP/P), f(T)

1.0E-11 2.7E-11 1.7E-10 1.1E-09 6.8E-09

4.3E-08 2.7E-07 1.7E-06 1.1E-05

0 100 200 300 400 500

1E-11

2E-11

3E-11

4E-11

5E-11

6E-11

7E-11

8E-11

9E-111E-10

Fixed pressure readout change with absorbed dose

0Gy2.79E-11mbarPre

ssure

(m

bar)

Dose (Gy)

500Gy 3.4E-11mbar

Pressure curves

Page 17: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 17

-0.05

0

0.05

0.1

0.15

0.2

0.25

0 1 2 3 4 5 6 7 8 9 10

Erro

r %

Input Voltage [V]

(Δ I/I ), f(V), room temperature

Channel 1, 2 - 0.1% Channel 3, 4 - 0.01%

Characterization with precision voltage sources

Error below 0.05% for 0.01% and 0.2% for 0.1% channels

5 transmitter stages in 3 runs (total 3 weeks) at CHARM

Input voltage ramp of each transmitter (0 – 10V) for 4-20mA output

All 5 samples accumulated 500 Gy – Analysis on-going!

On-going analysis

0 100 200 300 400 500

0.00

0.25

0.50

0.75

1.00

1.25

1.50

1.75

2.00

2.25

2.50

I/

I (%

)

Dose

0V - R0.1%

1V - R0.1%

5V - R0.1%

10V - R0.1%

0 100 200 300 400 500

0.00

0.25

0.50

0.75

1.00

1.25

1.50

1.75

2.00

2.25

2.50

I/

I (%

)

Dose

0V - R0.01%

1V - R0.01%

5V - R0.01%

10V - R0.01%

Page 18: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 18

Schedule Activity 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

• Task 1:Active gauges in the arcs

Study, simulations, components survey

DS+ARC Design & Proto

DS+ARC Dry & temperature tests

DS+ARC PSI COTS rad tests

DS+ARC CC60 modules rad tests

DS+ARC CHARM modules rad tests

DS+ARC CHARM system rad tests

DS series (16 Pirani/Penning; 48 Piezo)

DS rad test

DS installation

DS commissioning

ARC series

ARC rad test

ARC installation

ARC commissioning

Page 19: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 19

• New system architecture designed for fast and safe interventions

• Improved transmission guarantees signal integrity over long distances

• New electronics are compatible with different gauges (passive, active)

• Tolerance to radiation up to 500Gy with small degradation has been fully tested for:

Penning LOG stage (EDMS 1871072)

Transmitter 4-20mA stage (on-going analysis)

Page 20: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 20

• Finish designs for Pirani, Piezo, Power supply early 2018

• Mechanical integration – backplane PCB

• ECR request for mini-racks

• Dry and temperature tests following real vacuum tests in XHV lab (30/1-034)

• CHARM system tests for 500 Gy TID classification

• Manufacture electronics for DS series

• LS2 installation and commissioning planning

Page 21: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 21

Group VSCPaulo Gomes; Gregory Pigny, Pawel Krakowski, Andre Rocha, Rodrigo Ferreira, Jorge Fraga, Berthold Jenninger and Sophie Meunier.

R2EMarkus Brugger (EN-EA); Ruben Garcia Alia (EN-STI-FDA).

EN-STI-ECESalvatore Danzeca; Gilles Foucard; Paul Peronnard; Georgios Tsiligianis

TE-CRG-CIJuan Casas-Cubillos; Nikolaos Trikoupis.

Page 22: VSC Seminar - Indico...Pirani/Penning gauge PKR251 Piezo gauge Huba 680.99413 Nikolaos Chatzigeorgiou, CERN –TE/VSC VSC Seminar 28.11.2017 4 Max 1km • Gauges are distributed along

Nikolaos Chatzigeorgiou, CERN – TE/VSC VSC Seminar 28.11.2017 22