Variant Configuration 3

19
1 Object Variables used in Multi level configurations Variant Configuration Source: SAP

description

Variant Configuration 3

Transcript of Variant Configuration 3

Page 1: Variant Configuration 3

1

Object Variables used in Multi level configurations

Varia

nt C

onfig

urat

ion

Source: SAP

Page 2: Variant Configuration 3

2

Allowed Dependency TypesVa

riant

Con

figur

atio

n

Source: SAP

• Preconditions are allowed for characteristics and characteristic values.• Selection conditions are allowed for characteristics, BOM items, operations, and production resources/tools.• Procedures & Actions are allowed for characteristics, characteristic values, BOM items, operations, and configuration profiles.• Constraints can only be linked to a configuration profile via dependency nets.

Page 3: Variant Configuration 3

3

Processing Sequence for DependenciesVa

riant

Con

figur

atio

n

Source: SAP

• Each time you enter a value for a characteristic on the value assignment screen and confirm the value, the system processes all the dependencies.• The dependencies are processed in the following sequence:1. All actions several times, until no more values can be inferred.2. All procedures exactly once in the following sequence:

a) Procedures for the configuration profile in the order you definedb) Procedures for characteristicsc) Procedures for characteristic values

The procedures for each characteristic or value are processed in the order you defined.3. ActionsValues set by procedures can also trigger actions. For this reason, all actions are processed again.4. Preconditions5. Selection conditions for characteristicsConstraints are processed in parallel with points 1–3, if all the objects in the OBJECTSsection are present, and if all the conditions in the CONDITIONS section are fulfilled

Page 4: Variant Configuration 3

4

• Transfer to Production Planning (Demo)

Page 5: Variant Configuration 3

5

2. Checking Requirements Using MRP (T Code :MD04)

Varia

nt C

onfig

urat

ion

Source: SAP

Step1 to create sales order has already been discussed earlier.

2. Stock Requirements List: • The sales order is displayed as a separate planning segment (sales

order stock required on material availability date and sales order).

Page 6: Variant Configuration 3

6

3. Requirements Planning (T Code :MD50)Va

riant

Con

figur

atio

n

Source: SAP

The sales order will now be converted into a planned order. Planned Orders represent the first step toward an actual production schedule for the Shop Floor.

Page 7: Variant Configuration 3

7

4. Convert the Planned Order into a Production Order (MD04)

Varia

nt C

onfig

urat

ion

Source: SAP

• Planned Orders are a result of MRP run and serve to provide an initial Production Schedule. • Production Orders contain comprehensive information to support a shop floor schedule and provide a method to confirm operations performed. • Production orders can be created with reference to a Planned Order.

Page 8: Variant Configuration 3

8

4. Convert the Planned Order into a Production Order (MD04)

Varia

nt C

onfig

urat

ion

Source: SAP

Object Dependency:BoM Selection Condition ensures only necessary material components are taken.

Page 9: Variant Configuration 3

9

4. Convert the Planned Order into a Production Order (MD04)

Varia

nt C

onfig

urat

ion

Source: SAP

Object Dependency:Routing Selection Condition ensures only necessary operations are taken.

Page 10: Variant Configuration 3

10

4. Convert the Planned Order into a Production Order (MD04)

Varia

nt C

onfig

urat

ion

Source: SAP

Prior to release of order, it is not possible for anyone to enter confirmations for the operations in the order.

Release the Order and Save it.

Display the operation scheduling overview, choose Goto ® Graphic ® Gantt chart.

Page 11: Variant Configuration 3

11

4. Convert the Planned Order into a Production Order (MD04)

Varia

nt C

onfig

urat

ion

Source: SAP

Display the planned costs, choose Goto Costs Analysis

Page 12: Variant Configuration 3

12

5. Confirming Production Order (CO11N)Va

riant

Con

figur

atio

n

Source: SAP

Production Control Confirmation Enter For Operation Time Ticket

Page 13: Variant Configuration 3

13

5. Confirming Production Order (CO11N)Va

riant

Con

figur

atio

n

Source: SAP

• Back flushing (posting of an issue of components or material withdrawals)

• Storage of the finished product in the warehouse to sales order stock• Goods Movements are posted (errors if any can be corrected in COGI)• Actual costs are calculated• Just in case, to close the order without yielding a product, perform

Restrict Processing -> Technical Completion for Production Order in CO02.

Page 14: Variant Configuration 3

14

5. Confirming Production Order (CO11N)Va

riant

Con

figur

atio

n

Source: SAP

• Sample Material Document and FI document entries are shown below

Page 15: Variant Configuration 3

15

6. Checking the Settlement of the Production Order

Varia

nt C

onfig

urat

ion

Source: SAP

From the Production Control node, choose Period-End Closing Settlement Individual Processing (KO88)

Perform order settlement to transfer the costs of the production order to sales order.

Analyze the current cost situation for the Production Order

Page 16: Variant Configuration 3

16

7. Creating a Delivery (VL10G for delivery due list, VL01N for single delivery)

Varia

nt C

onfig

urat

ion

Source: SAP

Assign a serial number to the material. Pick and post the goods issue.Movement type will be 601 E indicating delivery from sales order stock.Accounting document will be generated to capture the change in inventory.

Page 17: Variant Configuration 3

17

8. Creating Billing Document (VF04/VF06 for due list, VF01 for single invoice)

Varia

nt C

onfig

urat

ion

Source: SAP

VF01: Create the invoice – sample accounting entries (without tax) are shown belowF-28: Receive the payment from the customer

Page 18: Variant Configuration 3

18

Other Information Va

riant

Con

figur

atio

n

Source: SAP

• CRM: It is possible to have configurable products among your Online Store offerings using the IPC (Internet Pricing and Configurator). It allows customers to interactively choose product options via an easy-to-use interface. Customers can mix-and-match these options to build the exact product they wish to purchase.

• ECC 5.0: Single transaction PMEVC – Modeling Environment for VC

Page 19: Variant Configuration 3

19

Thank YouThank You