1Brief Overview
EMERGYS SOFTWARE PRIVATE LIMITEDGreeta Towers, 2nd Floor, Phase I, Phone : (044) 24507507
Plot No- 98-114, Developed Plot, Fax : (044) 24963696
Perungudi, Chennai - 600 096. INDIA. Web : www.emergys.com
Variant Configuration
-
2Agenda
Introduction to Variant Configurations
Introduction
Integration
Terms Used
Classification System
Object Dependencies
Material Variants
MTO with VC(CTO)
Questions ???
-
3Introduction
Variant configuration in R/3 lets you check the following as soon as you create a sales order:whether the required variant can be produced (only variants that are technically possible can be ordered)what price you can quote for the productwhether the customers specifications can be covered from stock and so on...
-
4Industries
-
5Integration
Variant configuration is integrated with the following applications:
CA Classification LO Material Master PP Bill of Material PP Routings PP Material Requirements Planning (MRP) PP Production Orders PPPI Master Recipes CO Costing SD Sales SD Conditions MM Purchasing
-
6Terms Used
-
7Classification Systems
EngineColorRear wheelSeatExhaustAntitheft deviceOther Options
-
8Master Data in VC
Super BOM
Super Routing
Characteristics
Class
Object dependencies
Configuration Profiles
SD Condition records
-
9Class
-
10
Configurable Product, Class and characteristic
-
11
Super BOM
-
12
BOM for PC
-
13
Routing for PC
-
14
Object Dependencies
-
15
VC Structure
-
16
Material Variants
-
17
Material Variant defined in Material Master
-
18
MTO with VC
-
19
MTO with VC_Step 2
-
20
MTO with VC_Step 3
The sales order will now be converted into a planned order. Planned Orders
represent the first step toward an actual production schedule for the Shop
Floor.
-
21
MTO with VC_Step 4Planned Orders are a result of MRP run and serve to provide an initial Production Schedule.
Production Orders contain comprehensive information to support a shop floor schedule and provide a method to confirm operations performed.
Production orders can be created with reference to a Planned Order.
-
22
MTO with VC_Step 4
Object Dependency:
Routing Selection Condition ensures only necessary operations are taken.x`
-
23
MTO with VC_Step 5
-
24
MTO with VC_Step 6From the Production Control node, choose Period-End Closing Settlement
Individual Processing (KO88)
Perform order settlement to transfer the costs of the production order to sales order.
Analyze the current cost situation for the Production Order
-