Vani Water Supply Project

34

Transcript of Vani Water Supply Project

Page 1: Vani Water Supply Project
Page 2: Vani Water Supply Project

Rehabilitation of Vani Water Supply System (EIB/WIMP/W/ICB/12-L2) Installation of Distribution Network, 1,720m of PE100 Pipe (OD110, OD90 & OD63), 467nr House

Connections and associated 3,341m of PE100 Pipe (OD63 & OD25).

Installation of SCADA System including 2nr Ultrasonic Flow Meters, 2nr Residual Chlorine Monitoring Devices, 3nr Actuated Valves, 1nr Pressure Reducing Valve & Pump Control.

Contract Value 320,000GEL (€135,000), FIDIC Red Book MDB 2006

Commencement Date – 23rd April 2012 Completion Date – 10th November 2012

Page 3: Vani Water Supply Project

3,341M OF PE100 PIPE (OD63 & OD25) 1,720M OF PE100 PIPE (OD110, OD90 & OD63)

Page 4: Vani Water Supply Project

PVC WATER METER BOXES WATER METER BOX FITTINGS (1ST VALVE, FILTER, WATER METER, CONNECTION FITTINGS)

Page 5: Vani Water Supply Project

CROSSING THE BRIDGE (26TH MAY STREET, PE100, PN10, DN110, L=380M)

CROSSING THE MAGISTERIAL ROAD (TAMAR MEPE STREET PE100, PN10, DN90)

Page 6: Vani Water Supply Project

SECONDARY PIPELINE (TAMAR MEPE STREET PE100, PN10, DN63)

PE EF PIPE SADDLE FOR HOUSE CONNECTION SERVICE LINE

Page 7: Vani Water Supply Project

HOUSE CONNECTIONS TRENCH EXCAVATION PE EF PIPE SADDLE FOR HOUSE CONNECTION SERVICE LINE

Page 8: Vani Water Supply Project

HOUSE CONNECTIONS BACKFILLING PLATE LOAD TEST ON CROSSINGS OF MAGISTERIAL ROAD

Page 9: Vani Water Supply Project

PRESSURE TESTING AS PER “SNIP” CONSTRUCTION NORMS AND REGULATIONS 3.05.04-85

WATER METER BOX

Page 10: Vani Water Supply Project
Page 11: Vani Water Supply Project

2,000m3 Reservoir SCADA Works

Reservoir Inlet Ultrasonic Flow Meter Shaft

Page 12: Vani Water Supply Project

ULTRASONIC FLOW METER ULTRASONIC SENSOR-PROBES

Page 13: Vani Water Supply Project

2,000m3 Reservoir SCADA Works

2,000m3 Reservoir - Ultrasonic Water Level Meter

Page 14: Vani Water Supply Project

RESERVOIR ULTRASONIC WATER LEVEL METER

Page 15: Vani Water Supply Project

RESERVOIR OUTLET – AUTOMATIC VALVE SHAFT

Page 16: Vani Water Supply Project

RESERVOIR OUTLET – ULTRASONIC FLOW METER SHAFT

Page 17: Vani Water Supply Project

RESERVOIR OUTLET – SCADA “ROOM” ACTUATING VALVE CONTROL CABINET; RESIDUAL CHLORINE MONITORING DEVICE; ULTRASONIC FLOW METER

Page 18: Vani Water Supply Project

SCADA “ROOM” SCADA “ROOM” RESIDUAL CHLORINE MONITORING DEVICE

Page 19: Vani Water Supply Project

SCADA “ROOM” RESIDUAL CHLORINE PROBE

Page 20: Vani Water Supply Project

SCADA “ROOM” ACTUATING VALVE CONTROL PANEL

Page 21: Vani Water Supply Project

PRESSURE REGULATING VALVE & FILTER SHAFTS

Page 22: Vani Water Supply Project

PRESSURE REGULATING VALVE & FILTER SHAFTS

Page 23: Vani Water Supply Project

PRESSURE REGULATING VALVE “CSA XLC 410” DN200, PN25 (16)

Page 24: Vani Water Supply Project

“FABER” STRAINER DN200, PN16

Page 25: Vani Water Supply Project

Pump Station SCADA Works

Feeder Tank Water Level Meter

Page 26: Vani Water Supply Project

FEEDER TANK ULTRASONIC WATER LEVEL METER

Page 27: Vani Water Supply Project

INSTALLATION OF ACTUATORS WITH BUTTERFLY VALVES DN200, PN10-16 ON EXISTING PRESSURE PIPES SYSTEM

Page 28: Vani Water Supply Project

INSTALLATION OF ACTUATORS WITH BUTTERFLY VALVES DN200, PN10-16 ON EXISTING PRESSURE PIPES SYSTEM

Page 29: Vani Water Supply Project

ACTUATING VALVES CONTROL CABINETS

Page 30: Vani Water Supply Project

RESIDUAL CHLORINE ANALYSER

Page 31: Vani Water Supply Project

RESIDUAL CHLORINE ANALYSER SYSTEM

Page 32: Vani Water Supply Project

SCADA CONTROL ROOM

Page 33: Vani Water Supply Project

SCADA CONTROL PANEL AUTOMATIC PUMP WORK REGULATION BASED ON 2,000M3 RESERVOIR WATER LEVEL (LOW/HIGH)

Page 34: Vani Water Supply Project