1 © 18 Sep 2008 Neil Thompson & Mike Smith BCS SIGiST Value Flow ScoreCards for better strategies, coverage and processes British Computer Society Specialist Interest Group in Software Testing 18 Sep 2008 “Testers of Tomorrow” v1.3 23 Oast House Crescent Farnham, Surrey England, UK GU9 0NP www.TiSCL.com St Mary’s Court 20 St Mary at Hill London England, UK EC3R 8EE www.testing-solutions.com Neil Thompson Thompson information Systems Consulting Ltd & Mike Smith Testing Solutions Group Ltd 2 © 18 Sep 2008 Neil Thompson & Mike Smith BCS SIGiST What is a Value Flow ScoreCard? Objectives Measures Targets Initiatives Financial Supplier Customer Improvement & Infrastructure Process Product WHY we do things WHAT (will constitute success) HOW to do things well SIX VIEWPOINTS of what stakeholders want It’s a simple table which we can use to help control our work: • do things “well enough” for an appropriate balance of stakeholders • in this presentation, test strategy, test coverage, process improvement and process definition • (but arguably can apply it to anything!)

Transcript of Value Flow ScoreCards - British Computer Society · Value Flow ScoreCards ... • Goldratt’s...

1

©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Value Flow ScoreCardsfor better strategies, coverage and processes

British Computer SocietySpecialist Interest Group in Software Testing18 Sep 2008 “Testers of Tomorrow” v1.3

23 Oast House CrescentFarnham, SurreyEngland, UKGU9 0NPwww.TiSCL.com

St Mary’s Court20 St Mary at HillLondonEngland, UKEC3R 8EEwww.testing-solutions.com

Neil Thompson Thompson information Systems Consulting Ltd

& Mike Smith Testing Solutions Group Ltd

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

What is a Value Flow ScoreCard?

Objectives

Measures

Targets

Initiatives

FinancialSupplier Customer Improvement &Infrastructure

Process Product

WHY wedo things

WHAT(will constitute success)

HOW todo thingswell

SIX VIEWPOINTS of what stakeholders want

It’s a simple table which we can use to help control our work:• do things “well enough” for an appropriate balance of stakeholders• in this presentation, test strategy, test coverage,

process improvement and process definition• (but arguably can apply it to anything!)

2

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

BackgroundMike Smith:• white papers on test process (1999 & 2002)• keynote presentation to Ericsson on measurement in testing (2007)Neil Thompson:• Organisation before automation (EuroSTAR 1993, multidimensionality of test coverage)• Goldratt’s Theory of Constraints & Systems Thinking in process definition (STAREast

2003), SDLC (EuroSP3 2004), and process improvement (EuroSTAR 2006)

Value Flow ScoreCards take this further…

Holistic Test Analysis & Design, STARWest 2007• a flexible tabular format used for test coverage• relating this to Balanced ScoreCards (Kaplan & Norton,

business strategy etc) Separating “what” from “how”, ICST 2008:• Test Conditions as the keystone

test entity

Both of us: participation in the Software Testing Retreat – “Test entities” and “Appropriate Testing” (ApT)

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Rationale: Why invent Value Flow ScoreCards?

• Trends in Information Systems:– More agility: lean lifecycles, rapid testing, “good enough quality” (eg

James Bach)– More control: outsourcing, offshoring, Sarbanes-Oxley

• However, these trends seem to pull in opposite directions!?– see “Balancing Agility and Discipline” (Boehm & Turner)– … but agile is also disciplined! (or should be)

So – what can IS development & testing learn from:– Business Performance Measurement & Management?– Lean manufacturing / agile & Systems Thinking?

• Our agenda for doing things “well enough” then better:– The Systems Development LifeCycle as a flow of value– Balanced ScoreCards beyond strategy & six-sigma– Test & measurement models combined – the Treble-V model,

informing development through early Test Analysis– Practical uses of Value Flow ScoreCards in test

strategy, coverage, process improvement & definition

3

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

The SDLC as a flow of value

• Working systems have value; documents in themselves do not; so this is thequickestroute!

Programming

a b c Demonstrations &acceptance tests

Statedrequirements

RAW MATERIALS FINISHEDPRODUCT

• SDLCs are necessary, but introduce impediments to value flow: misunderstandings, disagreements…documents are like inventory/stock, or “waste”

Programming

a ab b’c d

Documentedrequirements

Implicitrequirements

Meeting / escalation to agree

I I Acceptance tests

?

?

Intermediate documentation!

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Lean manufacturing, Goldratt’s Theory of Constraints… agile IS methods…customers should pull “good enough” value

LEVELS OF DOCUMENTATION,pushed by specifiers

WORKINGSOFTWARE

Accepted

System-tested

Integrated

Unit / Component-tested

FLOW OF FULLY-WORKING SOFTWARE, pulled by

customer demand

Requirements

+ FuncSpec

+ TechnicalDesign

+ Unit / Componentspecifications

+ Test Specifications

4

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

But customers are not the only stakeholders

• ScoreCards – first publishedby Kaplan & Norton:– “Translating Strategy into Action”– Using four complementary views…

• Intentions to:– Drive behaviour– Measure outcomes– Improve predictability

• Now software testing is not only finding bugs, but measuring quality, ScoreCards seem useful here…

Financial

Customer Vision &Strategy

InternalProcesses

Learning& Growth

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

ScoreCard principles we can use

• For all four views (Financial, Customer, Internal & Learning)– “what” needs doing, and “why”:

• Objectives, with associated… • …Measures & Targets

– ‘how’ to achieve that:• Initiatives

• Cascading Scorecards– One person’s “how” is another person’s “what”– Measures & Targets are cascaded down to subordinates

• Lead & Lag indicators (Measures & Targets)– “Goal” indicators (reactive, known when achieved)– “Performance” indicators (proactive, ongoing monitoring)

5

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Taking Balanced ScoreCard beyond strategy:TSG’s views of quality

www.balancedscorecard.org© Paul Arveson 1998

version afterKaplan & Norton

Product

Risks

- Faults- Failures

(Financial)valueEfficiencyProductivityOn-time,

in budget

Customer(User)BenefitsAcceptanceSatisfaction- Complaints

Improvementeg TPI/TMM…PredictabilityLearningInnovation

Process(“Manufact’g”)Complianceeg ISO9000Repeatability

- Mistakes

Software Quality versionpublished by Isabel Evans

www.testing-solutions.com,adapted here by

Neil Thompson

WHYWHATHOW

• We can apply these(complementary)views of qualityto testing

10©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Cascading Balanced ScoreCards:“Translating strategy into action”, eg…

• Organisation’s objectives

• Objectives of anIS/IT project

• Project Test Plan HOW

HOWWHAT

HOWWHAT

HOWWHAT

WHAT

(a) A top-down view:down the business /

organisation

WHY

WHY

WHY

6

11©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

But then also: the test process as a scorecard

(b) This is a left-to-right view (complementary to the top-down view which isaligned with the project and business / organisation’s, objectives)

WHY HOWWHAT

HOWWHAT

TEST BASIS (EGSYSTEM SPEC)

TESTDESIGN

TESTEXECUTION

TESTANALYSIS

WHY

System development starts withthe logical (“what”) before specifyingthe physical (“how”), solet’s do this for testing also!

12©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiSTAnd then: if we add distinct Test Analysis to the W-model… the Treble-V model!

PROJECTREQ’TS SPEC

LOGICALDESIGN

PHYSICALDESIGN

COMPONENTDESIGN

BUILD

STATICTESTING

DYNAMIC TESTDESIGN

DYNAMIC TESTEXECUTION

DYNAMIC TESTANALYSIS

STATICTESTING

STATICTESTING

STATICTESTING

DYNAMIC TESTANALYSIS

DYNAMIC TESTANALYSIS

DYNAMIC TESTANALYSIS

DYNAMIC TESTDESIGN

DYNAMIC TESTDESIGN

DYNAMIC TESTDESIGN

DYNAMIC TESTEXECUTION

DYNAMIC TESTEXECUTION

DYNAMIC TESTEXECUTION

(c) This is a third “cascade” view – down then up, through:• Layers of stakeholders• Levels of integration

(It’s not only for waterfall SDLCs, eg iterative… )

7

13©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiSTThe Treble-V model develops cascading ScoreCards a little further

PROJECTREQUIREMENTS

FUNCTIONALSPECIFICATION

TECHNICALDESIGN

COMPONENTSPECIFICATIONS

BUILD

STATICTESTING

DYNAMIC TESTDESIGN

DYNAMIC TESTEXECUTION

DYNAMIC TESTANALYSIS

1

44 4?

3 3 3 3

1: “Translating strategy into action”2: The test process as a scorecard (at each test level)3: Scorecard applied to activities in test process

and… (even more interestingly!)4: Scorecard applied to activities in development process

ORGANISATION & PROJECT OBJECTIVESTEST POLICY, STRATEGY, PROJECT TEST PLAN(incl. reviews, inspections etc)

2

1

2 2 2

4

14©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

There exists a “Six-Sigma Business ScoreCard”: but is Six-Sigma applicable to IS value flow?

• Principles:– In a multi-step manufacturing

process, if ‘quality’ of any step is <100%, overall quality falls dramatically with numerous steps & components

– for overall quality to be ‘good enough’, each step / component should be within 6σ, ie99.9996% perfect

• IS is not exactlylike manufacturing,but we canlearn…

programmingwith risk of mistakes

Requirements

FunctionalSpecification

TechnicalDesign

ComponentSpec

DEVELOPMENTMODEL

REALWORLD

simplification

refinementwith risk ofdistortion

ATExecution

STExecution

ITExecution

CTExecution

SOFTWARE

test executionwith risk of compromises

WORKINGSYSTEM

8

15©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

We learn two things from Six-Sigma: (i) confirms we need Validation in addition to Verification

programmingwith risk of mistakes

Requirements

FunctionalSpecification

TechnicalDesign

ComponentSpec

Acceptance TestAnalysis & Design

System TestAnalysis & Design

Integration TestAnalysis & Design

Component TestAnalysis & Design

TESTMODEL

DEVELOPMENTMODEL

REALWORLD

simplification

refinementwith risk ofdistortion

ATExecution

STExecution

ITExecution

validation testing

verification testing

CTExecution

SOFTWARE

Based on flipchart drawn byNeil Thompson,Software Testing Retreat ,Llangadog, Wales

test executionwith risk of compromises

WORKINGSYSTEM

Customer

Product

16©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

(ii) the Six-Sigma ScoreCard includes Suppliers

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of qualitySupplierUpwardmanagement

Informationgathering

• Value chain ≈ Supply chain!– in the IS SDLC, each

participant should try to ‘manage their supplier’

– this is an instance of (test) scorecard applied to activities in development process

– we add this to the other 5, giving a 6th view of quality

• Now each step in the value chain can manage its inputs, outputs and other stakeholders

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvementeg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

Six-Sigma Business ScoreCard published by Praveen Gupta (2nd ed. McGraw Hill 2007), butthis slide shows Neil Thompson’s version

9

17©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiSTThe Treble-V model is a cascade of Value Flow ScoreCards

Financial

CustomerSupplier Improv’t

Process Product

STATICTESTING

12

Organisation & Project Objectivesfrom TEST POLICY, STRATEGY, PROJECT TEST PLAN

Coverage Objectivesfrom REQUIREMENTS,FUNCTIONAL SPEC, TECHNICAL DESIGN,MODULE SPECS

3Static Testers’own Objectives

4Feedback objectivesfor Business Analysts,Architects & Developers

Financial

CustomerSupplier Improv’t

Process Product

DYNAMICTESTANALYSIS

3Test Analysts’own Objectives

Initiativesfor nextstage oftest process

Initiativesfor nextlevel down theTreble-V model

(etc)

(etc)

18©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Potential number of ScoreCards depends on how your SDLC is handled by different roles

Pieces of a jig-saw!

This example is a “full-ish” set:• higher-level tests are

scripted – other staffmay then execute

Business Analysts Requirements Reviewers

Architects

Acceptance Test Analysts

Func Spec Reviewers

Designers

Acceptance Testers

Sys TestersSys Test Analysts

Tech Design Reviewers

Developers

Int Test Analysts

via pair programming?

Component Test Analysts, Designers & Executers?

AT Designers & Scripters

ST Designers & Scripters

IT Designers, Scripters & Executers

10

19©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

The Value Flow ScoreCard in action

Financial

CustomerSupplier Improv’t

Process Product

FinancialCustomerSupplier Improv’tProcess Product

• Yes – it’s just a table! …Into which we can put

useful things…• We start with repositionable

paper notes, then canput in spreadsheet(s)

20©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Value Flow ScoreCard contents

Objectives

Measures

Targets

Initiatives

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagement

Info from other levels of Treble-V model

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement &Infrastructureeg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

WHY

WHAT(“Indicators”)

HOW

• Give input to upstreamreviews

• Staff-days invested

• 1 Staff-day per Test Policy

• Send Denis every time

• What kind of useful things?• Here’s a simple example

11

21©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Example set of Objectives, Measures, Targets & Initiatives

Objectives

Measures

Targets

Initiatives

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagement

Info from other levels of Treble-V model

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement &Infrastructureeg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

WHY

WHAT(“Indicators”)

HOW

• Gain Industry-standardrespectability

• Maturity levels

• Level 2 by 2008• Level 3 by 2010

• Improvementactions

• Test casesexecuted

• 1479 (?)<see nextslide!>

• Give input to upstreamreviews

• Staff-days invested

• These are for testing in general, in a project context

• 1 Staff-day per Test Policy

• Send Denis every time

• Maintain minimumcompliance

• Frequency of audits

• 1 audit per year

• React to correspondencefrom auditors

• Run enoughtests (?)

• <see laterslides!>

• Get users to“sign off”

• Signatures

• One for UserAcceptance

• One for OperationalAcceptance

• Invite users &operators tospecify Accep-tance Tests

• Appearsuccessful asProjectManager

• Go-live date• Expenditure

• Go-live dateas originallyplanned

• Expenditure< budget

22©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Lag & Lead indicators; Goal-Question-Metric;making Measures & Targets SMART

Objectives

Measures

Targets

Initiatives

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagement

Info from otherlevels ofTreble-V model

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement &Infrastructureeg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

• Maturity levels

• Level 2 by 2008• Level 3 by 2010

• Test casesexecuted

• 1479 (?)

• Staff-days invested

Many of these are “lag” indicators:• reactive, known only when achieved

• 3 Staff-days per Test Policy

• Frequency of audits

• 1 audit per year

• Signatures

• One for UserAcceptance

• One for OperationalAcceptance

• Go-live date• Expenditure

• Go-live dateas originallyplanned

• Expenditure< budget

SpecificMeasurableAchievableRelevantTimely

GOAL

QUESTION

METRIC

• Test conditionsagreed

• (in language ofstakeholders

Here are two “lead” indicators, proactive:• Timely influence on quality, in advance• help assess & maintain Achievability

……...The six viewpoints assure “Relevance”……...

12

23©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Four practical uses of Value Flow ScoreCardsA. Test coverage

– extend control to stakeholders– transcend the small ‘textbook’ repertoire of techniques– holistic Test Analysis & Design: integrates and clarifies test

items, features, bases and product risks– better information traceability

B. Test Policy, Strategy & Planning– ensure alignment with organisational objectives– help completeness, no subjects forgotten– Goal–Question–Metric traceability

C. Process Improvement– not just test, but whole lifecycle– prioritised treatment of symptoms– transcend limitations of TMMTM or TPI®

D. Process definition– “Appropriate Testing” (ApT) in

different project/product circumstances

24©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

A. Test coverage: Do you control your testing, or does your testing control you?

• Test Cases thought of• Scripts / Procedures written• Expectation that “those are the tests”

THE REMAINDER OF YOUR LIFE(ON THAT PROJECT)

FLEXIBLE, RISK-MANAGED

TEST EXECUTION

• What you really want to cover• Governance / management needs• Product risksor…

(IMAGE OF TAIL WAGGING DOG) (IMAGE OF DOG WAGGING TAIL

– AS IS MORE NORMAL)

13

25©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Test coverage: other common problems

• Have you seen any of these?– important tests omitted– large numbers of low-value tests– higher levels of testing merely repeating

Component Testing– insufficient attention to non-functional tests– unstructured piles of detailed scripts– difficult-to-maintain testware…

26©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Numerous test cases & scripts are almost meaningless to stakeholders, without a “map”

Now, let’sstart with a

classificationtree

1479 test cases, so

it must be good,right?

Testspecificationprocess

Documentationto agreecoverage

(IMAGESREMOVED)

(IMAGESREMOVED)

14

27©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Testware: not a rigid hierarchyWHY WHAT HOW

Does this work?

No, because of these hierarchies

Test Conditions

System’s specifications

Test Cases

Test Scripts / Procedures

Test Execution Schedule

Test Conditions

System’sspecifications

Test Cases

Test Scripts / Procedures

So, we need many-to-manyentity relationships

Test Execution Schedule

28©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

An easy way for many-to-many relationships: a flexible table

Test Conditions

System’sspecifications

Test Cases

Test Scripts / Procedures

Test Execution Schedule

““ “

““

• But merely decomposing the system’s specification is not a recipe for very good tests

• We want a Validation (customer) view of quality in addition tothe traditional Verification (product) view…

What about:TEST ITEMS?

FEATURES TO BE TESTED?

PRODUCT RISKS?

““

15

29©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

So – Value Flow ScoreCards can measure test coverage: for Test Analysts…

Test Items(level ofintegration)

Features to betested

Test BasisReferences

ProductRisks

Test Conditions (wecould cover)

Objectives

Measures

Targets

Initiatives

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagementInfo from otherlevels of Treble-V model

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement &Infrastructureeg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

(from LEVEL TEST PLAN

andTEST BASES)

(to test design & execution)

Test Conditionswe intend to cover

Productbenefits

Features to betested

ProductRisks

Constraints

ProductRisks

ProductRisks

ProductRisks

Objectives forTest Cases

NB this is the “manual” Holistic Test Analysis & Design xls perspective. Formal relational database implementations, eg T-Plan,may require a more rigorous treatment.

30©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

… then for Test Designers, (+Scripters if used),and Executers

Objectives

Measures

Targets

Initiatives

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagement

Info from otherlevels of Treble-V model

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement &Infrastructureeg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

(to next level of Treble-V model)

S-curves projectedto target dates

Objectives forTest Cases

(fromTestAnalysis)

S-curves of:• Test Cases executed,passed, failed

• Incidents fixed,retested, closed

Objectives forTestExecutionSchedule

Objectives forincident-fixers

(to Developers)

Coverage ofTest Conditionsexecuted

16

31©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Holistic Test Analysis & Design spreadsheet centres on Test Conditions: usable also with Exploratory Testing?

1. Test Items& Sub-items

2. Test Features& Sub-features

EXPLORATORYTEST EXECUTIONRECORD (and/orTEST SCRIPT REF)

3. Test BasisReferences

4. ProductRisks

5. TestConditions

Ver / ValMechanism

Test DataIndications

TechniqueNames

TestObjectives

Overview A …

ABC…

““ “

+ whetherBehaviouralor Structural

B C

DeterminecoverageModel test space Determine

oraclesDeterminetest procedures

Configuretestsystem

Observetestsystem

Evaluatetestresults

Reporttestresults

Operatetestsystem

TESTING MISSION

ProjectEnvironment

QualityCriteria

ProductElements

Tests PerceivedQuality

Test Script or Exploratory Regime

Elements from“Heuristic Test Strategy Model”,“Universal Testing Method v2.0” &“Improving By Doing”quoted from Rapid Software Testing v2.1.2,training from James Bach & Michael Boltonwww.satisfice.com, www.developsense.comcross-referred here by Neil Thompson

TESTLAB

PRODUCTDOMAIN PROBLEM DOMAIN

32©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

B. Test Policy, Strategy & Planning: some common problems

• Testing not obviously (or at all) aligned to organisation’s objectives

• Test Policy, Strategy & Plan Documents which are:– cut-and-paste, “boilerplate”, same for all projects,

copied from textbooks…– tedious, dreary verbiage, too long– too short!– wishful thinking– unbalanced– etc?

17

33©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Value Flow ScoreCards for Test Policy, Strategy & Planning

Test Policy

Organisation’s ScoreCards, Goals, Objectives…ORGANIS-ATIONLEVEL

PROGRAMMELEVEL

PROJECT /PRODUCT

TESTLEVELS

Requirements Reviewers Acceptance Test Analysts AT Designers & Scripters Acceptance Testers

Sys Test AnalystsFunc Spec Reviewers ST Designers & Scripters Sys Testers

Project Test Plan

Org Test Strategy

Prog Test Strategy

(continues as on earlier slide)

Proj Test Strategy

34©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Example for Test Policy

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagement

Informationgathering

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement & Infrastructure

eg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

Organisation’sGoals & Objectives

Objectives

Measures

Targets

Initiatives

Organisation’s ScoreCards

• TMM levels

• TMM level 2at least, now

• TMM level 3within 2 years

• Constantimprovement ofdevelopment & test processes

GOAL

QUESTION

METRIC

(for Test Strategy / Strategies)

and fordevelopment?

18

35©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Test Policy (more): Have we thought of all the viewpoints? Do we have Measures, Targets & Initiatives?

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagement

Informationgathering

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement & Infrastructure

eg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

Organisation’sGoals & Objectives

Objectives

Measures

Targets

Initiatives

Organisation’s ScoreCards

• IS actively supports employees

• TMM levels

• TMM level 2at least, now

• Both static& dynamic

• Planning,preparation& evaluation

• Software & related work products

• Products to satisfy specifiedrequirements

• Products to be fit for purpose

• Detect defects early

• Indep-endenceincreaseswith test type

• Testing prioritised &managed

• Product risks

• Importance of req’ts

• Automate regrtests as muchas possible

Source: summarised from an example in TestGrip by Marselis, van Royen, Schotanus & Pinkster (CMG, 2007)

• Use TestFramefor test analysis& execution

• DefectDetectionPercentage

• Freq of process adjustmentsheeding metrics

• Twice per year

• Proj Mgr isresponsiblefor quality

• Bus Mgt isresponsiblefor enforcing Test Policy

• TMM level 3within 2 years

• Staff must becertified

• Defect sourceanalysis

• (comprehensivescope)

• ISTQB

• AdvisorsExpert

• ManagersAdvanced

• AnalystsFoundation

• Constantimprov’t ofdev & testprocesses GOAL

QUESTION

METRIC

36©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Summary for Test Policy, Strategy & Planning: what’s the point of Value Flow ScoreCards?

• Remind the authors of all the viewpoints which should be considered

• Encourage balance across those viewpoints• Focus on ways of measuring success – expose

vague / wishful thinking assertions• Get the key points recorded & agreed, before

writing indigestible documents• Pave the way for achievably

implementing these aspirations• Consider qualitative measures, eg rubrics,

where quantitative seems inappropriate (“Tyranny of Numbers”)

19

37©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

C. Process improvement

• In software testing, the popular process improvement methods have fixed subject areas(“Moment of involvement” etc)

• TMMTM and TPI® ascend through maturity levels– “these things are good for you, in this sequence”

• TOMTM is symptom-driven but still has a fixed structure, and suggested causes (a “built-in improvement model”)

• But some other fields (eg manufacturing, supply chains) use Goldratt-Dettmer (or Toyota-style equivalent) on symptoms, giving flexible focus

• Driving principle: the “constraint” is the weakest link, address that first before attacking everything

• Look for causes not just symptoms…

38©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiSTProcess improvement with Goldratt-Dettmerthinking tools

CURRENTILLS

Symptom x

Symptom y

Symptom z

Intermediatecause n

Intermediatecause o

Root cause a

Root cause b

CONFLICTRESOLUTION

For use where:• Different stakeholders

want different things• Evidence seems

contradictory• Are rival theories for

for remedies

“It seems here that…”

Distilled“truth”

Revelation(s)

“On the otherhand…”

FUTUREREMEDIES

Alleviationof symptoms

Fix forroot cause a

(can’t fix root cause b)

Fix forintermediatecause n

Fix forintermediatecause o

20

39©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

SDLC method does notencourage diagrams

An easy route into Goldratt-Dettmer: Strengths, Weaknesses, Opportunities & Threats

STRENGTHS

WEAKNESSES THREATS

OPPORTUNITIES

CURRENT ILLSFUTURE REMEDIES

PRE-REQUISITES

TRANS-ITION

Anticipating &overcomingobstacles

Action planning

CONFLICTRESOLUTION

System specs are heavy textdocuments

Culture of our testers is toprefer large text documentsto diagrams

Test specs are large & “texty”

Test coverage omissions & overlaps

Can still improve coverageat macro level with

informal techniques (80/20)

Too many failures in Live

Some managers are consideringagile methods

Business analysts may bemotivated by UML training

STRATEGIC: Improve SDLC method

TACTICAL: Address culture byworked examples of diagrams

TACTICAL: Include tables &diagrams in test specifications

(Use Threats to helpidentify obstacles)

(Use Strengths to helpamplify opportunities)

ONGOING: Techniques

training & coaching

(actually, as shown here Goldratt-Dettmer has five diagram sets in its full version, to cater for “making change stick”)

Testers not trainedin techniques

40©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Value Chain ScoreCards allow us to “swimlane” symptoms & causes (and proposed remedies)

Note: this is similar to Kaplan & Norton’s “Strategy Maps” (Harvard Business School Press 2004)

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagement

Informationgethring

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement &Infrastructureeg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

Objectives

Measures

Targets

Initiatives

LIFECYCLE…………………………………………ORGANISATION …...………………………………….INFRASTRUCTURE

TECHNIQUES………… & TOOLS

(TMap/TPIapproximation)

PRE-REQUISITES

TRANSITION

CONFLICTRESOLUTION

CURRENT ILLS

FUTURE REMEDIES

21

41©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Systems Thinking: some cause-effect trees “re-root” to form vicious / virtuous feedback loops

CURRENTILLS

Symptom x

Symptom y

Symptom z

Intermediatecause n

Intermediatecause o

Root cause a

Root cause b

Example (vicious)

SDLC method does notencouragediagrams

System specs are heavy textdocuments

Culture of our testersis to prefer large text documentsto diagrams

Test specs are large & “texty”

Test coverage overlaps

Too many failures in Live

Testers not trainedin techniques

Regression testsnot automated

Redundant regression teststake too longto run

Test suites growever larger

Testers too busyto “weed” tests

omissions

More tests added

Systems Thinkingnotation

REINFORCINGLOOP

Impactof live

failures

Size oftest suites

A loop is balancing if it contains an odd number of opposing links ;else it is reinforcing

Ignoranceof test

coverage

Each author seems to vary; this is Neil Thompson’s,

incorporating elements ofJerry Weinberg’s &Dennis Sherwood’s

BALANCINGLOOP

Reluctance to remove tests

from suites

Timespent

“firefighting”

42©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Value Flow ScoreCards give two nested sets of feedback loops: do things well enough now, then improve

FinancialSupplier Customer Improvement & InfrastructureProcess Product

Role 1

Via cascade ofValue Flow

Role 2

Role n

Find vicious loops… Balance them, and/or… maybe evenreverse them

(“Tipping Point!) … but tailor quality tobalance of stakeholders.

TIME, COST

SCOPE……………………………………………………………………..RISK & QUALITY……………………………………………………

Then iterate process improvements, but focussed on “constraints” iewhere they will have most payback.

Can still use structure of TMMTM, TPI®, TOMTM… if desired,they may be mapped on to these value flow columns

It’s a Test Policy, Jim, but…

Is it a good Test Policy?

22

43©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

D. Process definition: where we want to be in the range formal-informal for these circumstances, and how

Objectives

Measures

Targets

Initiatives

FinancialEfficiencyProductivityOn-time,

in budget

- Cost of quality

SupplierUpwardmanagement

Informationgathering

CustomerVALIDATIONRisksBenefitsAcceptanceSatisfaction- Complaints

Improvement &Infrastructureeg TPI/TMM…PredictabilityLearningInnovation

ProcessComplianceeg ISO9000Repeatability

- Mistakes

ProductVERIFICATIONRisksTest coverage

- Faults- Failures

Effectiveness

Efficiency

FromContext / Circumstances

Resources:• money ( skills, environments)• time

Application characteristics

Process constraints, eg:• quality mgmt• configuration mgmt

Technology

Technical risks

Business risks

Legal:• regulation• standards

• Methodologyunhappy with

• Unsure how best

to test

Insurance Assurance Efficiency

Note: comparable with Paul Gerrard’s “Axioms”,but in our version theseare the only two axioms

CURRENT SITUATION

Type of “V-model” Handover & acceptancecriteria

formal informal formal informal

Appropriate Testing in this context / circumstances

CONFLICTRESOLUTION

etc (about 30categories)

DESIRED SITUATION

Where in the range(specific aspects)

Where in the range(specific aspects)

Sector

Culture

Job type & size

Moral:• safety

44©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

• ScoreCards:– Kaplan & Norton; Isabel Evans; Praveen Gupta

• Lean & agile:– Toyota; Poppendiecks; Alistair Cockburn;

David Anderson

• Goldratt: – Jens Pas; William Dettmer ; Greg Daich

• Systems Thinking: – Jerry Weinberg; Dennis Sherwood

• Appropriate Testing (ApT) & test entities:– the Software Testing Retreat

Colour-codedsources oftesting ideas:- Rob Sabourin

Good Enough Quality

(+BSC):- James Bach,

+ Kaner & Pettichord

References & acknowledgements

23

45©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

References (additional details)

• Kaplan, RS & DP Norton: The Balanced Scorecard – Translating Strategy into Action (Harvard Business School Press 1996)

• Kaner, C, J Bach & B Pettichord: Lessons Learned in Software Testing – a Context-Driven Approach (Wiley 2002)

• Evans, I: Achieving Software Quality through Teamwork (ArtechHouse 2004)

• Gupta, P: Six Sigma Business Scorecard – Creating a Comprehensive Corporate Performance Measurement System (2nd

ed, McGraw Hill 2007)• Liker, JK: The Toyota Way – 14 Management Principles… from the

company that invented Lean Production (McGraw Hill 2004)• Poppendieck, M & T Poppendieck: Lean Software Development –

an Agile Toolkit (Addison Wesley 2003)• (also same authors, Implementing Lean Software Development –

from Concept to Cash (Addison Wesley 2007)• Cockburn, A: Agile Software Development (Addison Wesley 2002)• Anderson, DJ: Agile Management for Software Engineering –

Applying the Theory of Constraints for Business Results (Prentice Hall 2004)

44a

46©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

References (additional details cont’d)

• Dettmer, HW: Goldratt’s Theory of Constraints – a Systems Approach to Continuous Improvement (ASQ 1997)

• Daich, G: Software Documentation Superstitions (STAREast 2002, http://www.stickyminds.com/s.asp?F=S5857_CP_2 )

• Weinberg, GM: Quality Software Management Vol 1 – Systems Thinking (Dorset House 1992)

• Sherwood, D: Seeing the Forest for the Trees – a Manager’s Guide to Applying Systems Thinking (Nicholas Brealey, 2002)

• Thompson, N & M Smith: Holistic Test Analysis and Design(STARWest 2007, http://www.stickyminds.com/s.asp?F=S13265_CP_2 )

• Smith, M & N Thompson: The Keystone to Support a Generic Test Process – Separating the “What” from the “How” (ICST 2008, http://www2.computer.org/portal/web/csdl/doi/10.1109/ICSTW.2008.46 )

• Sabourin, R: Just in Time Testing (course, eg via http://www.testing-solutions.com/library/downloads/e/Enabling%20Test%20Maximisation%20-%20Rob%20Sabourin.pdf )

44b

24

47©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Take-away messages

Financial

CustomerSupplier Improv’t

Process Product

FinancialCustomerSupplier Improv’tProcess Product

• Think of any SDLC as aflow of value, fromrequirements to workingand maintained software

• It should be a jig-saw ofcascading, value-addingpieces

• In the pieces in which you participate, consideryour inputs, outputs and other influences interms of different stakeholder views

• Balance those views for your situation• Look at your measures and targets for success

before deciding exactly how to do things• Write them in your Value Flow ScoreCard• Note: org / project does not necessarily

need a complete set; some selected ScoreCards are immediately useful! 45

©

18 Sep 2008 Neil Thompson

& Mike Smith

BCS SIGiST

Value Flow ScoreCardsThanks for listening!

For further information…

British Computer SocietySpecialist Interest Group in Software Testing18 Sep 2008 “Testers of Tomorrow”

23 Oast House CrescentFarnham, SurreyEngland, UKGU9 0NPwww.TiSCL.com

St Mary’s Court20 St Mary at HillLondonEngland, UKEC3R 8EEwww.testing-solutions.com

Neil Thompson Thompson information Systems Consulting Ltd

& Mike Smith Testing Solutions Group Ltd