valuation report with recommendation and design scope of work for the existing air conditioning...

16
Communications Engineering & Technical Support Department CONFIDENTIAL Compliance & Facilities Engineering Division FOR INTERNAL USE ONLY Facilities Engineering Group ENGINEERING TECHNICAL REPORT CRM REFERENCE NO PAGE NO. REV. NO. 1 OF 16 00 ENGINEER UTHMANIYA, ALHASA SAUDI ARABIA

description

The CRM is to provide evaluation report with recommendation and design scope of work for the existing air conditioning system at Uthmaniya DCO and Alhasa clinic DCO Buildings.

Transcript of valuation report with recommendation and design scope of work for the existing air conditioning...

Page 1: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

ENGINEERINGTECHNICAL REPORT

CRM REFERENCE NO PAGE NO.

REV. NO.

1OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 2: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

TABLE OF CONTENTS

EXECUTIVE SUMMARY…………….……….……………………………………………………..3DESIGN CHECKLIST………………………………………………………………………………..4REVIEW AND APPROVAL ………………………………………………………………………….5ELECTRONIC DISTRIBUTION………………………………………….………………………….5DESIGN CONSIDERATIONS……………………………………………………………………….6PROPOSED ACTION PLAN/RECOMMENDATIONS..………….…….. ………………………7COST ESTIMATE……………………………………………………………………………………...8DESIGN SCOPE OF WORK..........................................................................................8SAFETY AND GENERAL NOTES..................................................................................9DRAWINGS..............................................................................................................10ATTACHMENT.…………………………………………………………………………………...….10CERTIFICATE OF COMPLETION.................................................................................11

CRM REFERENCE NO PAGE NO.

REV. NO.

2OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 3: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

EXECUTIVE SUMMARY

Category: Communication Building Air Conditioning Problem

Corporate Objective: To evaluate and provide engineering technical report with recommendation and design scope of work.

Strategy: Site survey technical gathering/ evaluation / SAES standard.

Region: Eastern region

CRM REFERENCE NO PAGE NO.

REV. NO.

3OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 4: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

DESIGN CHECKLIST

INITIAL DESIGN TASKSReview work request / Requirements √Search existing drawings √Kick off meeting N/ASite survey / Gather technical information

Gathering of engineering design criteria and requirements.

PROPONENT’S TASKSProvide site survey assistance √Provide required data/information N/A

DESIGN PACKAGE SUBMITTALSProvide Design Calculation N/AGenerate design drawing sketches N/AProvide Scope of Works N/AProvide Engineering Drawings N/ASubmit the Issued for Construction (IFC) package

N/A

SPACE AND POWER RESERVATIONSRequest for Space and Power Reservations

N/A

DRAWING & DOCUMENTATIONEngg. Drawings Attached to Design Package

N/A

Submit the electronic files to EDSD N/A

Yes (√) Not Applicable (NA)

CRM REFERENCE NO PAGE NO.

REV. NO.

4OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 5: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

REVIEW AND APPROVAL

Prepared By

Facilities Engineer

Reviewed by

Facilities Engineer

Approved by

ELECTRONIC DISTRIBUTION

GROUP EMAIL INITIAL

SEND DATE

UDHILIYAH FACILITIES GROUP FILE COPY _______ ____________

CE&TSD/ FEG GROUP FILE COPY _______ ____________ENGINEER ELECTRONIC

COPY_______ ____________

REVIEWER ELECTRONIC COPY

_______ ____________

CRM REFERENCE NO PAGE NO.

REV. NO.

5OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 6: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

DESIGN CONSIDERATIONS

Observations (Uthmaniya DCO):

Site survey was conducted on December 16, 2014 to gather technical information about the existing air conditioning system at Uthmaniya Digital Communications Office (DCO) building. The DCO building consists of communication equipment room, generator room and battery room.

The main cooling for the communication equipment room and the battery room comes from the duty and standby air conditioning units (AHU1 and AHU2). Both of AHU1 and AHU2 are located inside the communication equipment room.

In addition to AHU1 and AHU2, there exist two air conditioning units inside the communication equipment room. These two units are old and obsolete and no longer in used.

Observations (AlHasa Clinic DCO):

Site survey was conducted on December 22, 2014 to gather technical information about the existing air conditioning system at AlHasa Clinic Digital Communications Office (DCO) building. The DCO building consists of communication equipment room, generator room and battery room.

Findings (Uthmaniya DCO):

Based on the observation during the site survey and analysis performed, the following are the findings:

1. Indoor temperature measurements were taken during the site survey for the Communication equipment room and the battery room. The results are as follows:

a. Communication equipment room: ranging between 72.5 – 86 degrees F.

b. Battery room: 74 degrees F.2. Current indoor temperature inside the communication equipment room and

the battery room does not satisfy the temperature requirement of SAES-K-003 and SAES-K-002. The requirement being 72 degrees F for the communication equipment room and 72.5 degrees F for the battery room.

3. Based on the preliminary calculations and the evaluation of the cooling capacity of the current air conditioning units, it was found that the current air conditioning units cannot satisfy the cooling requirement of the building.

4. The main air conditioning units in the DCO (AHU 1 and AHU2) are relatively newly installed (about 4 years in service).

Findings (AlHasa Clinic DCO):

CRM REFERENCE NO PAGE NO.

REV. NO.

6OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 7: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

Based on the observation during the site survey and analysis performed, the following are the findings:

1. Indoor temperature measurements were taken during the site survey for the Communication equipment room and the battery room. The results are as follows:

a. Communication equipment room: ranging between 72.5 – 86 degrees F.

b. Battery room: 74 degrees F.

PROPOSED ACTION PLAN/RECOMMENDATIONS (Uthmaniya DCO):

1. Since the existing main air conditioning units (AHU 1 and AHU2) are undersized and no longer able to satisfy the cooling requirements of the building, it is recommended to add two new air conditioning units (duty and standby) to satisfy the cooling requirements and to have spare capacity for future projects.

2. The air conditioning units to be provided should be precision type air conditioning unit with re heater, humidifier, auto change over, and standard associated accessories to meet SAES-K-003 standard.

3. Connect all new A/C units to the fire alarm control panel and facility alarm panel/RTU for remote monitoring.

4. Ensure the new A/C units’ humidifier piping outlet will be connected to the potable (sweet) water supply piping and not to the raw water piping.

5. Remove the two old air conditioning units that are no longer in used to make space for the new units.

6. Perform testing, balancing, and commissioning of the new air conditioning system.

PROPOSED ACTION PLAN/RECOMMENDATIONS (AlHasa Clinic DCO):

1. Since the existing main air conditioning units (AHU 1 and AHU2) are undersized

COST ESTMATES (Uthmaniya DCO)

CRM REFERENCE NO PAGE NO.

REV. NO.

7OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 8: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

The estimated cost for the engineering design, supply for the materials, construction, testing and commissioning for the Upgrade of HVAC system at Uthmaniya DCO building is 410,000 dollars.

Cost Breakdown Engineering Design – 95,000 dollarsMaterial/Construction Cost. -- 304,000 dollarsPMT Construction Support – 11,000 dollars

DESIGN SCOPE OF WORK

1. Provide demolition drawings for the removal of the existing air conditioning units and associated accessories.

2. Provide design drawings for the installation of the duty and standby precision type air conditioning units with matching air condenser, re heater, humidifier, auto change over, and standard associated accessories.

3. Provide design drawings for the installation of the duty and standby centralized air conditioning units with matching air condenser, electric duct heater, humidifier, and standard associated accessories.

4. Provide design drawings for the ductwork modifications. 5. Provide design drawings for the installation of DDC panel and its connection

with the centralized air conditioning units and the exhaust fans in the battery room.

6. Provide design drawings for the connection of the new air conditioning units to the fire alarm control panel and facility alarm panel/RTU for remote monitoring.

7. Provide design drawings for the installation of the standby exhaust fan in the battery room.

8. Provide design drawings for the installation of refrigerant piping, humidifier potable (sweet) water supply piping, condensate drain piping, piping insulation, supports and vibration isolators.

9. Provide design drawings for the electrical and civil/structural. 10. Provide construction scope of work, material take off, calculations, and cost

estimates.

SAFETY & GENERAL NOTES:

CRM REFERENCE NO PAGE NO.

REV. NO.

8OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 9: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

The Contractor, Vendor/Supplier and Operation employees shall strictly follow the requirements of SAUDI ARAMCO Construction Safety Manual and Loss Prevention Manual when performing any work activity. This shall include but not limited to the following:

1. All personnel are required to wear safety shoes, safety glasses and hard hats.

2. The design of all new or modified electrical equipment to be operated at higher than 240 volts shall include an arc flash hazard analysis, in accordance with IEEE 1584, to determine the Arc Flash Protection Boundary, the incident energy a worker may be subject to, the Hazard/Risk Category, and the PPE to be worn. This is to ensure the compliance to the Saudi Aramco GI# 2.721 to mitigate/control Arc Flash Hazards and provide minimum safe work requirements for protection of personnel against these hazards in the workplace.Refer to this link for more details: (http://sharek.aramco.com.sa/cops/GI/Operation%20Services/Industrial%20Services/Power%20Distribution/0002_721.pdf)

3. All personnel shall strictly follow all SAUDI ARAMCO safety regulations and standard construction safety practices.

4. All matters relating to safety should be in consultation with the SAUDI ARAMCO Loss Prevention Unit and the SAUDI ARAMCO Representative.

5. All personnel shall be supplied with approved safety equipment, including but not limited to, safety helmets, safety glasses, gloves, welding shields and safety footwear. Safety equipment shall be used where appropriate at all times. SAUDI ARAMCO Loss Prevention requirements shall be used to determine appropriate safety equipment areas for its use.

6. The Contractor/Supplier shall exercise extra precautions in the field to avoid damaging any existing structures, utilities, etc., during the construction works.

DRAWINGS

CRM REFERENCE NO PAGE NO.

REV. NO.

9OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 10: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

Not Applicable

ATTACHMENTS

Not Applicable

CERTIFICATE OF COMPLETION

Not Applicable

CRM REFERENCE NO PAGE NO.

REV. NO.

10OF11

00ENGINEERUTHMANIYA, ALHASA SAUDI ARABIA

Page 11: valuation report with recommendation and design scope of work for the existing air conditioning system

Communications Engineering & Technical Support Department CONFIDENTIAL

Compliance & Facilities Engineering DivisionFOR INTERNAL USE ONLY Facilities Engineering Group

Notice of Completion After the completion of the required work in this CRM, please fax a signed copy of this form to C&FED/FEG at Fax No. 875-8166 Or email it to the assigned engineer.

This is to inform you that the required work in this CRM has been completed by CE&TSD/C&FED/Facilities Engineering Group

NAME SIGNATURE COMPLETIONDATE

___________________________________ __________________ ____________COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.

This is to inform you that the required work in this engineering package design has been completed by CE&TSD/C&FED/Facilities Engineering group

NAME SIGNATURE COMPLETIONDATE

___________________________________ __________________ ____________COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.

This is to inform you that the required work completion in this CRM package has been verified byArea IT / Udhiliyah Facilities Group

NAME SIGNATURE COMPLETIONDATE

___________________________________ __________________ ____________COMMENTS: Please note any as-built changes/corrections and forward these changes along with this document.

This is to verify that all as-built changes/corrections have been incorporated into the appropriate documents and the current document revision number for this Engineering Service Request is ____.

ENGINEER SIGNATURE COMPLETIONDATE

___________________________________ __________________ ____________