Utility Management Services as part of Restructuring ... · in the privatisation efforts for...
Transcript of Utility Management Services as part of Restructuring ... · in the privatisation efforts for...
Utility Management ServicesUtility Management ServicesUtility Management Servicesas part ofas part ofas part of
Restructuring, Privatisation andRestructuring, Privatisation andRestructuring, Privatisation andInstitutional Reforms of theInstitutional Reforms of theInstitutional Reforms of the
Management Contract for ELECTROGAZManagement Contract for ELECTROGAZManagement Contract for ELECTROGAZ
Institutional Reforms of theInstitutional Reforms of theInstitutional Reforms of theElectricity and Water SectorsElectricity and Water SectorsElectricity and Water Sectors
Dr. Hans Dieter HermesConference on Partnership & Investment Opportunitiesin Transport, Infrastructure and Public Utilities in Africa
15 Feb. 2005, Hamburg
� Long term efforts have been undertaken by the Government of Rwanda towards the Energy and Water Sector Reform
BackgroundBackground
Objectives: Operation
� The Energy and Water Sector Reform is embedded in the privatisation efforts for infrastructure in Rwanda
� This is the first step of the Privatisation process of the state-owned company Electrogaz
National Production Sites
BackgroundThe Rwandan Electricity System
100 %based
onHydropower
Lahmeyer International has a long standing history�As a privately operated company� Independent from any association or affiliation
Lahmeyer Internationalas Private Utility Operator
Objectives: Operation
� Independent from any association or affiliation with manufacturers.
�Exercising its business successfully since 1966� Lahmeyer International has successfully been
providing engineering services and management advice to utility companies, funding agencies and private investors and operators.
� Any form of Privatisation can only be implemented with countries Government and population
� LI is a partner to develop ELECTROGAZ into a
Our understanding of Utility Management
Objectives: Operation
� LI is a partner to develop ELECTROGAZ into a viable utility
� LI works with the people of ELECTROGAZ and with the people of Rwanda
� Reliable Management is a precondition to activate necessary investments in infrastructure
The major objective of the five years Management contract for the Rwandan Water and Electric Power Utility ELECTROGAZ is to achieve on the long run
�Significant reduction in technical and commercial
Objectives of the Contract in Rwanda
Objectives: Operation
�Significant reduction in technical and commercial losses
�Extensive improvements in operational efficiency� Increase access of the population to water and
power services� Financial self-sufficiency of ELECTROGAZ
� Operational Improvement Plan
� Commercial Improvement Plan
Tasks of the Utility Management Contract
Objectives: Operation
� Tariff Policy Development Plan
� Technical Improvement (Power, Water)
� Training Program and Staff Development
� Financial Improvement Plan
Background Overuse of Hydropower – Ntaruka, usage in MWh
2,500
3,000
3,500
4,000
4,500
5,000
MW
h/m
onth
-
500
1,000
1,500
2,000
2,500
Jan-
98
Jul-9
8
Jan-
99
Jul-9
9
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
MW
h/m
onth
Monthly Actual
Monthly design
Background Overuse of Hydropower - Lake Bulera (Ntaruka)
1,862.0
1,862.5
1,863.0
1,863.5
1,864.0
1,864.5
Leve
l m
Overuse of Rwanda’s main power stations has led to a draw-down of Reservoirs (unsustainable production levels )
1,859.5
1,860.0
1,860.5
1,861.0
1,861.5
1,862.0
Jan-
98
Jul-9
8
Jan-
99
Jul-9
9
Jan-
00
Jul-0
0
Jan-
01
Jul-0
1
Jan-
02
Jul-0
2
Jan-
03
Jul-0
3
Jan-
04
Leve
l m
MaximumActualMinimum
Background Water level in Bulera Lake
� Electricity production is not sustainable (depending on rainfall)
� Not sufficient rain despite rainy season
Current Situation and Short Term Future
� Not sufficient rain despite rainy season
� Generation to be reduced by 80-130MWh per day
Electrogaz Supply 15-21 March 2004
Load shedding would need to be increasedCurrent Situation and Short Term Future
35
40
45
50
MW
Time
-
5
10
15
20
25
30
1:00
3:00
5:00
7:00
9:00
11:0
0
13:0
0
15:0
0
17:0
0
19:0
0
21:0
0
23:0
0
Peak Mar 03 plus 9% Ave. 15-21 Mar 04
Without load shedding
with load shedding
� Loss of income for Government (taxes)
� Loss of employment in the Rwanda industries
� Loss of reputation of Rwanda for Tourism and as
Possible Future Implications
a Conference destination
� Damage to investor confidence
� Decrease of Security
Rwanda’s Electricity Demand (2003-2020)
Pea
k D
eman
d
80
100
120
140
160
180
200[MW]
500
750
1000
1250
[GWh/a]Peak Demand
Energy Demand
Ene
rgy
Dem
andBulk in 2007:
caused by Single Committed Projects at Cement Industry
ELECTRICITY SHORTAGE IN RW ANDA
0
20
40
60
80
0
250
500
Ene
rgy
Dem
and
2003 2005 2010 2015 2020YearsFacts:� The average Energy Demand Growth Rate is 8 % p.a.� An extensive electricity generation expansion progr am is
required
Planned Structure of Rwanda’s Energy Supply System until 2020
� Less Load Shedding in 2005, full supply from 2006
� System Reserve according to International Standards:
ELECTRICITY SHORTAGE IN RW ANDA
beginning in 2007: Adequate Back-Up-Capacity(in particular Fast Track Diesel Units)
� Electrification Rate higher than 20 per cent in 202 0
� Diversified Energy Supply System
Vision for Rwandas Electricity System in 20 years
39 %Hydro Power Domestic
32 %Hydro Power Imports
ELECTRICITY SHORTAGE IN RW ANDA
13 %Diesel Power Domestic
16 %Methane Gas Power
Domestic
� World Bank + Nordic Fund 25 Mio.$ + 6 Mio.€Emergency Project Diesel Generators (Hybrid), T&D
� African Development Bank 20 Mio.$Rehabilitation Power and Water Facilities, 10 Mio.$ each
� European Union 19 Mio.€“Karengue” Water Treatment Rehab./Extension + Infrastructure
� BADEA + OPEC Fund 10-15 Mio.$
Lessons Learnt
Results (1) Commitment of Donors
� BADEA + OPEC Fund 10-15 Mio.$Rehabilitation Hydro Power “Mukungwa”
� Netherlands 6 Mio.€Diesel Gen. Sets, Rural Electrification
� Belgium 4 Mio.€Substations, Rehabilitation of Micro Hydro Power
� Germany ???
Discussed:� World Bank 15-25 Mio.$
Mid/long term Energy Projects, Methane Gas Energy
� The Management Contract is the means to activate an d steer large infrastructure investments needed
� Tax exemptions for Diesel Fuel could be achieved
� The Electricity Tariff has successfully been adjust ed
Lessons Learnt
Results (2)
� The Electricity Tariff has successfully been adjust ed (from 42 FRW to 81 FRW, still flat) without major r iots
� A new Tariff Structure is being prepared and discus sed
� Power Purchase Agreements are being revisited
Lessons Learnt
Thank you for your attentionThank you for your attention